Block 4081, lot 011B
725 Florida St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2024 | Completed final sign-off Dec 2024 | 725 Florida St | Community Reconstruction Solutions | exterior repairs. parapet cap flashing tie in, demo 8"+- stucco assemble, install s.s cap flashing 20 lft.paint to match existingDetails
exterior repairs. parapet cap flashing tie in, demo 8"+- stucco assemble, install s.s cap flashing 20 lft.paint to match existing | $7,202 |
| Mar 21, 2023 | Never finaled issued May 2023, no final | 727 Florida St | Securitas Technology Corporation | upgrade sunsetting 3g monitoring on existing fire alarm panel to 4g. (communicator only)Details
upgrade sunsetting 3g monitoring on existing fire alarm panel to 4g. (communicator only) | $11,020 |
| Sep 13, 2021 | Completed final sign-off Jun 2022 | 725 Florida St | The G B Group Inc. | non-street visible: repair dry rot around window in lightwell of unit 2 & 10, in kind. replace 4 windows, in-kind, no size changes. u-factor 0.30 or better. units affected per applicant: #2 & #10.Details
non-street visible: repair dry rot around window in lightwell of unit 2 & 10, in kind. replace 4 windows, in-kind, no size changes. u-factor 0.30 or better. units affected per applicant: #2 & #10. | $100,000 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 755 Florida St | street spaceDetails
street space | ||
| Feb 7, 2018 | Never finaled issued Feb 2018, no final | 727 Florida St | Securitas Technology Corporation | installing new fire alarm control panel - removing old panel.Details
installing new fire alarm control panel - removing old panel. | $10,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 731 Florida St | Ac And Company | repair of roof deck, less than 50%Details
repair of roof deck, less than 50% | $1,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2017 | 731 Florida St | Ac And Company | reroofingDetails
reroofing | $20,000 |
| Jun 9, 2017 | Completed final sign-off Jun 2017 | 755 Florida St | Andrew Chekene Enterprises/ Dba Ac Enter | revision to 201504083046 removing the replacement of the front entry door and garage doorDetails
revision to 201504083046 removing the replacement of the front entry door and garage door | |
| Aug 23, 2016 | Never finaled issued Aug 2016, no final | 725 Florida St | street spaceDetails
street space | ||
| Jul 22, 2016 | Never finaled issued Jul 2016, no final | 755 Florida St | street space permitDetails
street space permit | ||
| Jun 16, 2016 | Completed final sign-off Jul 2016 | 755 Florida St | Community Reconstruction Solutions | window replacement, not visible from the street same size and same location. addition to permit # 201604114403.Details
window replacement, not visible from the street same size and same location. addition to permit # 201604114403. | $1,200 |
| May 4, 2016 | Never finaled issued May 2016, no final | 755 Florida St | street spaceDetails
street space | ||
| Apr 11, 2016 | Completed final sign-off Jul 2016 | 725 Florida St | Community Reconstruction Solutions | waterproof wall and windows. repair stucco, 70 sq ft, at common area around side light well. not visible from street.Details
waterproof wall and windows. repair stucco, 70 sq ft, at common area around side light well. not visible from street. | $900 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 755 Florida St | street spaceDetails
street space | ||
| Apr 8, 2015 | Completed final sign-off Jun 2017 | 755 Florida St | Andrew Chekene Enterprises/ Dba Ac Enter | remove deteriorated siding & replace with new metal panels & waterproofing, new waterproofing & tile on decks. 2 new windows. common area only.Details
remove deteriorated siding & replace with new metal panels & waterproofing, new waterproofing & tile on decks. 2 new windows. common area only. | $531,990 |
| Apr 18, 2013 | Never finaled issued Apr 2013, no final | 725 Florida St | street space permitDetails
street space permit | ||
| Jan 17, 2013 | Completed final sign-off Jul 2013 | 737 Florida St | Andrew Chekene Enterprises/ Dba Ac Enter | remove plywood sub-strate at (2) deckds,sistering wood sticking to existing joist in order to properly slope deck, install blocking at permiter of deck. apply new water-proofing membrane our over new plywood, remove & install existing railing , top coat outside (7) canteleveler deck.Details
remove plywood sub-strate at (2) deckds,sistering wood sticking to existing joist in order to properly slope deck, install blocking at permiter of deck. apply new water-proofing membrane our over new plywood, remove & install existing railing , top coat outside (7) canteleveler deck. | $18,600 |
| Oct 11, 2012 | Completed final sign-off Aug 2013 | 725 Florida St | Andrew Chekene Enterprises/ Dba Ac Enter | kitchen renovation: remove old cabinets and replace with new cabinets; remove all old appliances and replace with new appliances; remove sink & faucet and replace with new fixtures; no changes in layout. lighting to comply with cec 150(k).Details
kitchen renovation: remove old cabinets and replace with new cabinets; remove all old appliances and replace with new appliances; remove sink & faucet and replace with new fixtures; no changes in layout. lighting to comply with cec 150(k). | $50,000 |
| Aug 30, 2010 | Completed final sign-off Jan 2011 | 725 Florida St | Advance Construction Technology Inc | unit #2a-revision to pa# 2010.07.13.6431. installation of support beam under framing wall, shoring eating wall, cut bottom support to remove decay, install new sill plate. no exterior work.Details
unit #2a-revision to pa# 2010.07.13.6431. installation of support beam under framing wall, shoring eating wall, cut bottom support to remove decay, install new sill plate. no exterior work. | $9,850 |
| Nov 20, 2007 | Completed final sign-off Dec 2007 | 725 Florida St | The Pelgen Company | unit # 15 - remove and replace 8' section of rotted 5x14 glulam beam. install 1 3/4x14 lvl wood on both sides of existing beam. both trough w/3/4" bolts.Details
unit # 15 - remove and replace 8' section of rotted 5x14 glulam beam. install 1 3/4x14 lvl wood on both sides of existing beam. both trough w/3/4" bolts. | $15,000 |
| Aug 24, 2000 | Completed final sign-off Nov 2000 | 725 Florida St | install sprinkler supervision & smoke detectionDetails
install sprinkler supervision & smoke detection | $12,000 | |
| Feb 25, 2000 | Completed final sign-off Nov 2000 | 725 Florida St | Sunny's Plumbing Inc | install fire sprinkler system for the 18 units loftDetails
install fire sprinkler system for the 18 units loft | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andrew Chekene Enterprises/ Dba Ac Enter (4), Community Reconstruction Solutions (3), Ac And Company (2), Securitas Technology Corporation (2), Advance Construction Technology Inc, Sunny's Plumbing Inc, The G B Group Inc., The Pelgen Company
- Architects
- Andrew Weber
- Engineers
- Rajendra Sahai
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.