Gary Strang
- License
- C19687
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Gls Landscape Arch.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Aug 2025
10 permits since 2000 (architect on 10 permits): 9 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill-Nibbi Joint Venture (4), Paul Ryan Associates (2), Alpha Restoration & Wateproof
- Engineers
- Rajendra Sahai (2), Rajendra Sahai
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 7
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2025 | In progress issued Feb 2026 | 1333 Bush St | Alpha Restoration & Wateproof | renovate the existing deck-roof top deck.Details
renovate the existing deck-roof top deck. | $200,000 |
| Apr 20, 2015 | Completed final sign-off Dec 2017 | 188 West Point Rd | Cahill-Nibbi Joint Venture | construction of benches, paved areas and play area for use as a park facility. (phase i final map established block/lot 4624/031 to include this area. the phase ii final map #7545 establishes this lot as 4624/056).Details
construction of benches, paved areas and play area for use as a park facility. (phase i final map established block/lot 4624/031 to include this area. the phase ii final map #7545 establishes this lot as 4624/056). | $450,000 |
| Apr 12, 2013 | Completed final sign-off Aug 2014 | 1177 California St | Paul Ryan Associates | renovation of an (e) permitted roof deck including replacing (e) surface finishes, new code complaint handrails, new led ground lighting. repair (e) waterproofing membranes & flashing & new drain connection to (e) drain line & splash blockDetails
renovation of an (e) permitted roof deck including replacing (e) surface finishes, new code complaint handrails, new led ground lighting. repair (e) waterproofing membranes & flashing & new drain connection to (e) drain line & splash block | $35,000 |
| Dec 19, 2012 | Completed final sign-off Aug 2014 | 1177 California St | Paul Ryan Associates | unit# 1717, 17th fl - renovation of condo.(n)floor, (n) wall & ceiling finishes, (n) fixts, (n) plumbing fixts, (n) kitchen appliances, (n) fireplace & (n) casework. exterior wor limited to patio including replacement of patio tile w/ stone. new guardrail will be a deferred submittal.Details
unit# 1717, 17th fl - renovation of condo.(n)floor, (n) wall & ceiling finishes, (n) fixts, (n) plumbing fixts, (n) kitchen appliances, (n) fireplace & (n) casework. exterior wor limited to patio including replacement of patio tile w/ stone. new guardrail will be a deferred submittal. | $650,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1151 Fairfax Av | Cahill-Nibbi Joint Venture | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $1,000,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1195 Fairfax Av | Cahill-Nibbi Joint Venture | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $400,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1190 Fairfax Av | Cahill-Nibbi Joint Venture | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $100,000 |
| Jan 27, 2011 | Completed final sign-off Apr 2014 | 1 Cashmere St | construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access.Details
construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access. | $50,000 | |
| Jan 27, 2011 | Completed final sign-off Apr 2014 | 1 Cashmere St | construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access.Details
construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access. | $50,000 | |
| Jan 27, 2011 | Completed final sign-off Apr 2014 | 98 West Point Rd | construction of a concrete wallway (to connect the new hunters view development to cashmere street) on theree parcels-to provide handicap accessble pedestrian acces.Details
construction of a concrete wallway (to connect the new hunters view development to cashmere street) on theree parcels-to provide handicap accessble pedestrian acces. | $100,000 |