Block 4624, lot 033
1151 Fairfax Ave
- City’s use
- Government
- Lot
- 28,238 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2025 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes.Details
revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes. | $4,148 |
| Jan 24, 2025 | Completed final sign-off Jun 2026 | 1151 Fairfax Av | Cahill - Nibbi Joint Ventures | development of a park on lot a of final map no.9677 located between hunters view block 14(permit #201909121446) and hunters view block 17 (permit # 201909121448).the park proposes publicly accessible amenities including a play area, learning garden, multi-use lawn,bbq area, and overlook.Details
development of a park on lot a of final map no.9677 located between hunters view block 14(permit #201909121446) and hunters view block 17 (permit # 201909121448).the park proposes publicly accessible amenities including a play area, learning garden, multi-use lawn,bbq area, and overlook. | $4,000,000 |
| Aug 30, 2024 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plansDetails
rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plans | $4,148 |
| May 31, 2023 | Completed final sign-off Aug 2025 | 1151 Fairfax Av | Cosco Fire Protection Inc. | hunters view phase 3- block 17, lot 4: underground fire water service, ref pa# 201909121448Details
hunters view phase 3- block 17, lot 4: underground fire water service, ref pa# 201909121448 | $30,000 |
| May 18, 2023 | Completed final sign-off Aug 2025 | 1151 Fairfax Av | Westates Mechanical Corporation Inc | install new 8" fire service, starting at curb to inside the fire pump room at garage main level. ref pa# 201909121446.Details
install new 8" fire service, starting at curb to inside the fire pump room at garage main level. ref pa# 201909121446. | $8,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1151 Fairfax Av | Cahill - Nibbi Joint Ventures, Mc Millan Electric | mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023;Details
mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023; | $50,000,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1151 Fairfax Av | Cahill Contractors Llc., Cahill - Nibbi Joint Ventures, Cahill Contractors Inc | mayor dir# 17-02. 100% affordable housing. to erect 5 stories, no basement, type iii-a over type i-a, 76 units residential with mixed used buidling. (r-2,b,a-3) apn# 4624/033 (hunters view phase 3-block 17, lot 4)Details
mayor dir# 17-02. 100% affordable housing. to erect 5 stories, no basement, type iii-a over type i-a, 76 units residential with mixed used buidling. (r-2,b,a-3) apn# 4624/033 (hunters view phase 3-block 17, lot 4) | $50,000,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2014 | 1151 Fairfax Av | Cahill-Nibbi Joint Venture | construct a new privately owned park ( as part of the hunter's view development.)Details
construct a new privately owned park ( as part of the hunter's view development.) | $1,000,000 |
| Jan 31, 2012 | Never finaled issued Jan 2012, no final | 1151 Fairfax Av | new address for promontory park.Details
new address for promontory park. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill - Nibbi Joint Ventures (3), Cahill Contractors Llc. (3), Cahill Contractors Inc, Cahill-Nibbi Joint Venture, Cosco Fire Protection Inc., Mc Millan Electric, Westates Mechanical Corporation Inc
- Architects
- Daniel Simons (4), David Fletcher, Gary Strang
- Engineers
- Greg Wagner (2), James Fain (2), John Gobieski
- Subcontractors
- Kathryn Cahill Thompson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.