Block 0048, lot 006
930 Chestnut St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 4,137 sq ft
- Lot
- 5,153 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 930 Chestnut St | interior remodel - lv 1 closet conversion to new powder room, lv 2 partial conversion of (e) shower to closet.Details
interior remodel - lv 1 closet conversion to new powder room, lv 2 partial conversion of (e) shower to closet. | $72,848 | |
| Mar 27, 2026 | Completed final sign-off Apr 2026 | 930 Chestnut St | Noa Construction Llc | recommencement and completion of work approved under pa# 202305177990.Details
recommencement and completion of work approved under pa# 202305177990. | $5,000 |
| May 17, 2023 | Expired or cancelled expired Apr 2026 | 930 Chestnut St | Noa Construction Llc | demolish existing bathroom to create one large media room, demolish laundry room countertop, relocate existing washer/dryer and laundry sinkDetails
demolish existing bathroom to create one large media room, demolish laundry room countertop, relocate existing washer/dryer and laundry sink | $25,000 |
| Jul 8, 2019 | Completed final sign-off Jan 2020 | 930 Chestnut St | Noa Construction Llc | remove and replace interior finishes in basement, remodel downstairs bathroom in exact location, remove and replace radiant heating system and reroute plumbing/electrical as needed for repairs, coat (e) slab with new membrane, repair perimeter drainage and water proofingDetails
remove and replace interior finishes in basement, remodel downstairs bathroom in exact location, remove and replace radiant heating system and reroute plumbing/electrical as needed for repairs, coat (e) slab with new membrane, repair perimeter drainage and water proofing | $75,000 |
| May 8, 2015 | Never finaled issued May 2015, no final | 930 Chestnut St | street space permitDetails
street space permit | ||
| Feb 11, 2015 | Completed final sign-off Nov 2015 | 930 Chestnut St | Peter Harris Construction Inc | rear garden and patio remodel with new stair at side yard to replace e stairDetails
rear garden and patio remodel with new stair at side yard to replace e stair | $79,745 |
| Oct 24, 2014 | Completed final sign-off Nov 2014 | 930 Chestnut St | Peter Harris Construction Inc | nov compliance for side yard fence and small extension of front yard fence. nov# 201494412. wrap 3-foot solid/or 6-foot 75% open fence behind tree at front corner f lot. at side yard fence at tree well up to 10-feet above grade.Details
nov compliance for side yard fence and small extension of front yard fence. nov# 201494412. wrap 3-foot solid/or 6-foot 75% open fence behind tree at front corner f lot. at side yard fence at tree well up to 10-feet above grade. | $1,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 930 Chestnut St | street space permitDetails
street space permit | ||
| Aug 22, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | revision to pa# 2013-0520-7377-new work is to remove sprial stairs at rear & install a new fold down ladder for roof maintenance. also add 2 fixed side lights glazing at rear next to (e) double doors. also revise size of shear wall at column line d on drawingsDetails
revision to pa# 2013-0520-7377-new work is to remove sprial stairs at rear & install a new fold down ladder for roof maintenance. also add 2 fixed side lights glazing at rear next to (e) double doors. also revise size of shear wall at column line d on drawings | $12,550 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 930 Chestnut St | Plumbworks Inc. /Chris Goodwin Plumbing | new fire sprinkler system 13-d for single family home 51 heads, 1 1/2" combination water serviceDetails
new fire sprinkler system 13-d for single family home 51 heads, 1 1/2" combination water service | $15,000 |
| Jun 6, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | revision to pa# 201305207347. foundation section revisions. allow shotcrete per engineer.Details
revision to pa# 201305207347. foundation section revisions. allow shotcrete per engineer. | |
| May 20, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | 1)exterior modifications to restore extg trim and siding. 2)remove extg exterior stair and door on east side and infill wall to match. 3)remove extg chimneys and fire place & roof railing. 4)install new parapet conrice. install new bay on north side.Details
1)exterior modifications to restore extg trim and siding. 2)remove extg exterior stair and door on east side and infill wall to match. 3)remove extg chimneys and fire place & roof railing. 4)install new parapet conrice. install new bay on north side. | $60,000 |
| Mar 14, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | project includes renovating extg storage space on the ground floor into habitable space. this will finish space into a guest bedroom, guest bath, and powder room.Details
project includes renovating extg storage space on the ground floor into habitable space. this will finish space into a guest bedroom, guest bath, and powder room. | $40,000 |
| Feb 15, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | remove siste wall at front property line and shrubs to allow equipment acccess pursuant to 201211134144 for foundation and seismic improvements. site wall and landscape will be either salvaged and reinstalled or replaced in kind at end of constructionDetails
remove siste wall at front property line and shrubs to allow equipment acccess pursuant to 201211134144 for foundation and seismic improvements. site wall and landscape will be either salvaged and reinstalled or replaced in kind at end of construction | $1,000 |
| Feb 5, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Ggd Inc. | basement new laundry, mech room, storage, stairwell to 1st floor, elevator & equipment. lower 1st floor: north of gridline d to match rest of 1st floor. remaining 1st floor bedroom will be relocated and renovated.sprinklers separate permit per nfpa 13dDetails
basement new laundry, mech room, storage, stairwell to 1st floor, elevator & equipment. lower 1st floor: north of gridline d to match rest of 1st floor. remaining 1st floor bedroom will be relocated and renovated.sprinklers separate permit per nfpa 13d | $700,000 |
| Jan 8, 2013 | Never finaled issued Jan 2013, no final | 930 Chestnut St | street spaceDetails
street space | ||
| Nov 13, 2012 | Completed final sign-off May 2014 | 930 Chestnut St | Ggd Inc. | seismic upgrade the basement. work inlcudles excavation of e crawl space by +/- 2' on east side and +/- 6' on west side. new retaining wall. new footings, new stem wal, new posts, new slab to be constructed. e wlevator to be enlargedDetails
seismic upgrade the basement. work inlcudles excavation of e crawl space by +/- 2' on east side and +/- 6' on west side. new retaining wall. new footings, new stem wal, new posts, new slab to be constructed. e wlevator to be enlarged | $275,000 |
| Jun 27, 2007 | Completed final sign-off Apr 2008 | 930 Chestnut St | Fresh Paint | 1. convert existing closet to water closet on 2nd floor.2. remodel bathroom as existing vanity, toilet, tub and tile 3. replace drywall in the bathroom 4. all he lighting unless lighting is controlled by certified occupant sensorsDetails
1. convert existing closet to water closet on 2nd floor.2. remodel bathroom as existing vanity, toilet, tub and tile 3. replace drywall in the bathroom 4. all he lighting unless lighting is controlled by certified occupant sensors | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mc Cutcheon Construction Co. (5), Noa Construction Llc (3), Ggd Inc. (2), Peter Harris Construction Inc (2), Fresh Paint, Plumbworks Inc. /Chris Goodwin Plumbing
- Architects
- Aaron Hyland (2), Karen Mar (2), Towan Kim
- Engineers
- Eugene Tuan (2)
- Designers
- Noa Construction Llc