Block 0808, lot 043
465 Grove St
- City’s use
- Commercial Hotel
- Built
- 1960
- Stories
- 3
- Units
- 1
- Rooms
- 38 bathrooms
- Building
- 12,953 sq ft
- Lot
- 14,731 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2023 | Never finaled filed May 2023, never issued | 465 Grove St | to demolish all of the (e) buildings which includes (36 tourist rooms and 5 sro rooms and adjacent 2 unit residential building) and remove parking lot asphalt to grade level with new building entitlement app under dcp 2016-001059prj.Details
to demolish all of the (e) buildings which includes (36 tourist rooms and 5 sro rooms and adjacent 2 unit residential building) and remove parking lot asphalt to grade level with new building entitlement app under dcp 2016-001059prj. | $20,000 | |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 465 Grove St | abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060640".Details
abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060640". | $1,000 | |
| Sep 15, 2016 | Never finaled issued Sep 2018, no final | 465 Grove St | seismic upgrade for soft story building chapter 34b; 2012 iebc appendix a-4.Details
seismic upgrade for soft story building chapter 34b; 2012 iebc appendix a-4. | $10,000 | |
| Feb 21, 2013 | Never finaled issued Feb 2013, no final | 465 Grove St | street space & sidewalkDetails
street space & sidewalk | ||
| Mar 29, 2012 | Completed final sign-off Dec 2013 | 465 Grove St | Dees-Hennessey Inc | underpinning for work on adjacent property (401 grove) reference approved 201101289274Details
underpinning for work on adjacent property (401 grove) reference approved 201101289274 | $310,000 |
| Mar 22, 2012 | Completed final sign-off May 2012 | 465 Grove St | T T K Construction Inc | frame the fire wall for existing kitchen hood duct relocate to the window.Details
frame the fire wall for existing kitchen hood duct relocate to the window. | $6,800 |
| Apr 12, 2011 | Completed final sign-off Jul 2011 | 465 Grove St | repair wood portion of stairs, less than 50% of stairs to comply with nov dated 3/15/2011 nov# 201108742Details
repair wood portion of stairs, less than 50% of stairs to comply with nov dated 3/15/2011 nov# 201108742 | $1,000 | |
| Sep 27, 2010 | Completed final sign-off Jan 2011 | 465 Grove St | Us Quality Construction Inc Dba Quality | work to be done on left back and right side only fiber siding cement installation, over (e) wood sidingDetails
work to be done on left back and right side only fiber siding cement installation, over (e) wood siding | $35,000 |
| Apr 14, 2009 | Completed final sign-off Jun 2009 | 465 Grove St | San Jose Awning Co | take down old awning - replace with new awning at office area. new awning at stairs.Details
take down old awning - replace with new awning at office area. new awning at stairs. | $8,000 |
| Jan 12, 2009 | Never finaled issued Jun 2009, no final | 465 Grove St | Fluoresco Lighting & Sign | install 1 illuminated sign cabinet on existing pole structure for days inn. ground, electric, double faced.Details
install 1 illuminated sign cabinet on existing pole structure for days inn. ground, electric, double faced. | $5,000 |
| Oct 29, 2007 | Never finaled issued Oct 2007, no final | 465 Grove St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Aug 18, 2005 | Expired or cancelled expired Mar 2006 | 465 Grove St | Aaa Restaurant Fire Control/Dba Aaa Fire | install kidde fire system.Details
install kidde fire system. | $2,500 |
| Feb 9, 2005 | Completed final sign-off Mar 2005 | 465 Grove St | Fire Protection Retrofit Specialist | renewal 200212062940 for final inspection.Details
renewal 200212062940 for final inspection. | |
| Sep 26, 2003 | Never finaled issued Oct 2003, no final | 465 Grove St | Life Safety & Security | install digital alarm communicator/fire panel to monitor sprinklers system waterflow and tamper swiDetails
install digital alarm communicator/fire panel to monitor sprinklers system waterflow and tamper swi | $4,000 |
| Dec 6, 2002 | Never finaled issued May 2003, no final | 465 Grove St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply w/ ordinance 170-02Details
to install fire sprinkler system to comply w/ ordinance 170-02 | $31,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fire Protection Retrofit Specialist (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Dees-Hennessey Inc, Fluoresco Lighting & Sign, Life Safety & Security, San Jose Awning Co, T T K Construction Inc, Us Quality Construction Inc Dba Quality
- Architects
- Arvind S. Iyer (3)
- Engineers
- Eugene Tuan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.