Mike Pitler
- Listed as
- architect
- Firm
- Mike Pitler Architecture
- On San Francisco permits
- Jan 2010 to May 2019
2 permits since 2000 (architect on 2 permits): 1 completed, 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2019 | Completed final sign-off Jul 2022 | 1170 Harrison St | Achill Beg Construction Inc, Excel Site Services Inc | demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural workDetails
demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural work | $500,000 |
| Jan 20, 2010 | Never finaled issued Jan 2010, no final | 913 Capp St | interior updates and remodel and repair, kitchen remodel, bath remodel, electrical upgrades, replace front & rear windows, enlarge existing deck.Details
interior updates and remodel and repair, kitchen remodel, bath remodel, electrical upgrades, replace front & rear windows, enlarge existing deck. | $50,000 |