Claudio Martonffy
- Listed as
- architect, authorized agent-others, designer
- Firm
- Claudio Martonffy Design
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Jan 2025
17 permits since 2000 (architect on 15 permits, authorized agent-others on 1 permit, designer on 1 permit): 15 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2025 | Completed final sign-off Aug 2026 | 3884 17th St | C & M Woodworking Inc Dba C & M General | legalization of rooftop decorative rail in response to nov 202418673. roof to remain unoccupied.Details
legalization of rooftop decorative rail in response to nov 202418673. roof to remain unoccupied. | $5,000 |
| Jan 15, 2025 | In progress issued Jan 2026 | 3884 17th St | C & M Woodworking Inc Dba C & M General | convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497.Details
convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497. | $25,000 |
| Sep 27, 2022 | Completed final sign-off Jul 2023 | 730 Polk St | Bevilacqua & Sons | add fire rated access door 18x18 to existing 2nd fl elevator shaft. revision to permit 202205234748.Details
add fire rated access door 18x18 to existing 2nd fl elevator shaft. revision to permit 202205234748. | $2,000 |
| Jul 14, 2022 | Completed final sign-off Nov 2022 | 108 Cole St | Bevilacqua & Sons | rev to pa 202204122039 repair non conforming guardrail per ab 005Details
rev to pa 202204122039 repair non conforming guardrail per ab 005 | |
| Nov 17, 2021 | Completed final sign-off Oct 2022 | 1502 Golden Gate Av | Eon Builders Inc | 3rd fl:interior remodel, includes full finishes construction of common area, kitchen & bthrms: includes the perforation of an extg shearwall with replacement of inkind strength. permit for work to be performed will be remediate conditions outstanding under current order of abatement #201178596a &Details
3rd fl:interior remodel, includes full finishes construction of common area, kitchen & bthrms: includes the perforation of an extg shearwall with replacement of inkind strength. permit for work to be performed will be remediate conditions outstanding under current order of abatement #201178596a & | $200,000 |
| Jul 3, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | Edgewood Builders Inc | interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maherDetails
interior renovation of 1 kitchen and 2 bathrooms, add new forced air unit and connect to extg diffusers. n/a for maher | $50,000 |
| May 3, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | Edgewood Builders Inc | revision to 201702068655: shoring planDetails
revision to 201702068655: shoring plan | $15,000 |
| Feb 6, 2017 | Completed final sign-off Sep 2020 | 2621 Sacramento St | Edgewood Builders Inc | upgrade structure - foundations & shear walls on ground floor.Details
upgrade structure - foundations & shear walls on ground floor. | $90,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2018 | 3270 24th St | Edgewood Builders Inc | gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate perDetails
gr fl renovation of permitted restaurant (pa 201406037404) renovate e gr fl retail into restaurant, seismic upgrade of gr fl per 2014iebc appendix a4, mech/elec/plumb for commercial kitchen, accessible bathrooms and egress, remove gr fl lightwell per 201405037404. sprinkler - fire alarm seperate per | $500,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 450 Noe St | Building By Design | relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street)Details
relocate extg kitchen and bathroom on l2. relocate extg kitchen on l3. add new bathroom on l2. relocate window on l3(not visible from street) | $10,000 |
| Jan 28, 2015 | Completed final sign-off Apr 2015 | 3251 Pierce St | South Bay Construction | erect a non-illuminated single faced wall sign. n/a maher ordinanceDetails
erect a non-illuminated single faced wall sign. n/a maher ordinance | $1,250 |
| Jan 28, 2015 | Completed final sign-off May 2015 | 3251 Pierce St | South Bay Construction | exterior window & door upgrade, refer to #2015.0116.6016 for interior work. n/a maher ordinanceDetails
exterior window & door upgrade, refer to #2015.0116.6016 for interior work. n/a maher ordinance | $6,000 |
| Jan 28, 2015 | Completed final sign-off Apr 2015 | 3251 Pierce St | South Bay Construction | erect a non-illuminated double faced projecting sign. n/a maher ordinanceDetails
erect a non-illuminated double faced projecting sign. n/a maher ordinance | $750 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 3251 Pierce St | South Bay Construction | interior t.i. including structural and mep alaterations, and accesable bathroom. exterior t.i. including lighting at store front alterations. all work on ground level. n/a for the maher. all other exterior work deferred to future planning dept review.Details
interior t.i. including structural and mep alaterations, and accesable bathroom. exterior t.i. including lighting at store front alterations. all work on ground level. n/a for the maher. all other exterior work deferred to future planning dept review. | $133,000 |
| Feb 28, 2014 | Completed final sign-off Jul 2014 | 1015 Shotwell St | Edgewood Builders Inc | level 2 unit 10 interior remodel: upgrade electrical and plmbg as required. relocate extg interior walls as shown on a3.01. replace extg drywall as needed. relocate extg heater.n/a for the maher ordinance #155-13Details
level 2 unit 10 interior remodel: upgrade electrical and plmbg as required. relocate extg interior walls as shown on a3.01. replace extg drywall as needed. relocate extg heater.n/a for the maher ordinance #155-13 | $20,000 |
| Jan 6, 2009 | Completed final sign-off Sep 2009 | 4225 22nd St | Fusion Building Company | install new deck and low podium in rear yard, replace extg wndws on rear (south) elevation with new door and wndws.deck of redwood. note: reduction in scope of work from original submittal.Details
install new deck and low podium in rear yard, replace extg wndws on rear (south) elevation with new door and wndws.deck of redwood. note: reduction in scope of work from original submittal. | $25,000 |
| Sep 13, 2006 | Expired or cancelled cancelled Jul 2012 | 4225 22nd St | new 2 story horizontal addition. remodel kitchen. add bath & laundry at 1st floor.-converted to full permit 7/1/08 - changes made to approved site permitDetails
new 2 story horizontal addition. remodel kitchen. add bath & laundry at 1st floor.-converted to full permit 7/1/08 - changes made to approved site permit | $99,000 |