Ivan Romero
- Listed as
- architect, engineer
- Firm
- Ccsf-Dpw-Ba
- Based in
- San Francisco
- On San Francisco permits
- Aug 2019 to Apr 2026
14 permits since 2000 (architect on 13 permits, engineer on 1 permit): 8 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 1828 Egbert Av | Clark Construction Group Ca Lp | ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steelDetails
ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel | $700,000 |
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 100 Larkin St | Svala Construction Inc | revision to 202512192263. removal of 3 of the 5 originally permitted safety floor grilles.Details
revision to 202512192263. removal of 3 of the 5 originally permitted safety floor grilles. | $15,000 |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 100 Larkin St | Svala Construction Inc | installation of safety floor grilles at selected floor openings on 3rd and 4th floor of main library. floor grilles are a safety measure to prevent people from jumping off the (e) guard rails.Details
installation of safety floor grilles at selected floor openings on 3rd and 4th floor of main library. floor grilles are a safety measure to prevent people from jumping off the (e) guard rails. | $175,000 |
| Dec 9, 2025 | Completed final sign-off Apr 2026 | 100 Larkin St | Svala Construction Inc | 3rd & 4th fl - installation of laminated glass safety barriers around the central curved atrium floor opening at the 3rd & 4th fl of the main library. laminated glass safety barriers will be bolted to the existing metal guardrails.Details
3rd & 4th fl - installation of laminated glass safety barriers around the central curved atrium floor opening at the 3rd & 4th fl of the main library. laminated glass safety barriers will be bolted to the existing metal guardrails. | $180,000 |
| Oct 17, 2025 | In progress issued Feb 2026 | 1828 Egbert Av | 3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control.Details
3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control. | $2,000,000 | |
| Apr 7, 2025 | In progress issued Mar 2026 | 1828 Egbert Av | Clark Construction Group Ca Lp | project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.Details
project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility. | $7,000,000 |
| Nov 12, 2024 | In progress issued Sep 2025 | 1828 Egbert Av | ti to 1st and 2nd floor. structrural , architectural, mechnanical, and electrical work. site improvements, (n) permiter 8 ft metal fence interior work includes new freezer boxes, site works, includes new refrigration equipment and concrete pad for hvacDetails
ti to 1st and 2nd floor. structrural , architectural, mechnanical, and electrical work. site improvements, (n) permiter 8 ft metal fence interior work includes new freezer boxes, site works, includes new refrigration equipment and concrete pad for hvac | $5,000,000 | |
| Feb 8, 2024 | Expired or cancelled cancelled Mar 2024 | 1828 Egbert Av | t.i..project to serve as temporary locaton for sffd officers and is not considered an essential services facility.selective demolition of(e)bldg entry point & ti. improvement within (e)bldg occurring on partial 1st & 2nd fls,to include (n)walls,doors,concrete ramp,finishes,equipment & fixtures.Details
t.i..project to serve as temporary locaton for sffd officers and is not considered an essential services facility.selective demolition of(e)bldg entry point & ti. improvement within (e)bldg occurring on partial 1st & 2nd fls,to include (n)walls,doors,concrete ramp,finishes,equipment & fixtures. | $5,000,000 | |
| Mar 17, 2022 | Completed final sign-off Dec 2022 | 425 07th St | Buhler Commercial | amendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019Details
amendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019 | $30,000 |
| Jan 14, 2022 | Completed final sign-off Mar 2024 | 750 Brannan St | new shelving units, all under 12' tall, associated electrical modifications. no change of use or occupancy. accessibility, egress, and signage upgrades completed with permits 201611072146 and 201702229918Details
new shelving units, all under 12' tall, associated electrical modifications. no change of use or occupancy. accessibility, egress, and signage upgrades completed with permits 201611072146 and 201702229918 | $150,000 | |
| Oct 4, 2021 | Completed final sign-off Jan 2023 | 425 07th St | Buhler Commercial | rev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f.Details
rev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f. | $400,000 |
| Mar 23, 2021 | Never finaled issued Oct 2021, no final | 750 Brannan St | revision to pa #2018 0622 2658 to included installation of sound barrier system (fence) for outdoor mechanical units.Details
revision to pa #2018 0622 2658 to included installation of sound barrier system (fence) for outdoor mechanical units. | $30,000 | |
| Jun 11, 2020 | Completed final sign-off Mar 2021 | 820 Bryant St | Buhler Commercial | to demolish a type 5, 1 story, restaurent bldg.Details
to demolish a type 5, 1 story, restaurent bldg. | $200,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2022 | 425 07th St | renovation of extg commercial kitchen of county jail #2. work inlcudes architectural, structural mep work in support of food service improvement. n/a for maherDetails
renovation of extg commercial kitchen of county jail #2. work inlcudes architectural, structural mep work in support of food service improvement. n/a for maher | $1,900,000 |