Gabriel Lim
- Listed as
- architect, engineer
- Firm
- Public Works, Boa
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Apr 2026
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 1 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 8, 2026 | In progress issued May 2026 | 934 Brannan St | revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaustDetails
revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust | ||
| May 11, 2023 | Completed final sign-off Jan 2025 | 934 Brannan St | revision to 201903114916. site area: change the sidewalk to match the new driveway and provid truncated domes along the pathy, remove concrete stem wall, provide wood retaining wall along the property line, provide 12" trench on driveway. simplified landscape. added partial fencingDetails
revision to 201903114916. site area: change the sidewalk to match the new driveway and provid truncated domes along the pathy, remove concrete stem wall, provide wood retaining wall along the property line, provide 12" trench on driveway. simplified landscape. added partial fencing | $10,000 | |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 1001 Potrero Av | demolish 2 doors/frames and finish with gyp bd misc demo of e sink, counters, casework and electrical data. e data to receive faceplates in bldg bhc, behavioral health center, supervised patient careDetails
demolish 2 doors/frames and finish with gyp bd misc demo of e sink, counters, casework and electrical data. e data to receive faceplates in bldg bhc, behavioral health center, supervised patient care | $63,000 | |
| Mar 11, 2019 | Never finaled issued Feb 2023, no final | 934 Brannan St | mod- site area: (add alternate)add extior paving, gratings, fence gates, sidewalk ramp & curb ramp; 1st flr: add lula access, machine room & stairs; 2nd flr: add lula access, toilet room & stairs. **maher n/a**Details
mod- site area: (add alternate)add extior paving, gratings, fence gates, sidewalk ramp & curb ramp; 1st flr: add lula access, machine room & stairs; 2nd flr: add lula access, toilet room & stairs. **maher n/a** | $1,700,000 |