Thomas Matthew Jasmin
- Listed as
- architect
- Firm
- San Francisco Public Works
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Sep 2025
16 permits since 2000 (architect on 16 permits): 8 completed, 3 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2025 | In progress issued Mar 2026 | 1200 Carroll Av | Swinerton Builders | site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2bDetails
site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2b | $45,000,000 |
| Dec 29, 2022 | In progress issued Jun 2026 | 1 Sgt John V Young St | Clark Construction Group Ca Lp | existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures.Details
existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures. | $14,000,000 |
| Dec 29, 2022 | In progress issued Mar 2026 | 1 Sgt John V Young St | Clark Construction Group Ca Lp | to erect a 2-story, type 2a, office building.Details
to erect a 2-story, type 2a, office building. | $15,000,000 |
| Dec 29, 2022 | Expired or cancelled withdrawn Nov 2025 | 1 Sgt John V Young St | to erect a one story, type va, community meeting room.Details
to erect a one story, type va, community meeting room. | $6,000,000 | |
| Dec 5, 2019 | Completed final sign-off Jun 2025 | 798 Wisconsin St | sffd station 37: replacement of (e) emergency diesel generator at grade on patio with a new 521 gallon diesel generator to provide for 72 hr of runtime. this includes an inground fuel filler in sidewalk. maher n/a.Details
sffd station 37: replacement of (e) emergency diesel generator at grade on patio with a new 521 gallon diesel generator to provide for 72 hr of runtime. this includes an inground fuel filler in sidewalk. maher n/a. | $500,000 | |
| Dec 5, 2019 | Completed final sign-off Jun 2025 | 1298 Girard St | replacement of emergency disel generator at grade on patio with a new 434 gallons disel generator to provide for 72 hours of run time.Details
replacement of emergency disel generator at grade on patio with a new 434 gallons disel generator to provide for 72 hours of run time. | $400,000 | |
| Oct 2, 2019 | Expired or cancelled cancelled Dec 2025 | 551 26th Av | sffd station 14: generator replacement mounted on roof with integrated belly tank (510 gal)to provide minimum 72 hr run time; new inground fuel station @ sidewalk on deferred submittal. ** maher: n/a **Details
sffd station 14: generator replacement mounted on roof with integrated belly tank (510 gal)to provide minimum 72 hr run time; new inground fuel station @ sidewalk on deferred submittal. ** maher: n/a ** | $620,000 | |
| Sep 10, 2019 | Never finaled issued Dec 2019, no final | 1000 Ocean Av | city job. priority processing. deferred payment. hose tower replacement & roof patching/repair. remove (e) fire hose tower 7 replace w/ (n) seismically improved fire hose toewr in (e) location. patch/repair roofing around (n) fire hose tower.Details
city job. priority processing. deferred payment. hose tower replacement & roof patching/repair. remove (e) fire hose tower 7 replace w/ (n) seismically improved fire hose toewr in (e) location. patch/repair roofing around (n) fire hose tower. | $600,000 | |
| Aug 15, 2019 | Completed final sign-off Apr 2021 | 1145 Stanyan St | hose tower removal voluntary work to improve seismic performance removing unused hose tower. roof replacementDetails
hose tower removal voluntary work to improve seismic performance removing unused hose tower. roof replacement | $748,000 | |
| Aug 15, 2019 | Completed final sign-off Apr 2021 | 1443 Grove St | hose tower removal voluntary work to improve seismic performance removing unused hose tower. roof replacementDetails
hose tower removal voluntary work to improve seismic performance removing unused hose tower. roof replacement | $619,000 | |
| Jul 9, 2019 | Completed final sign-off Mar 2021 | 135 Sanchez St | hose tower removal and roof patching. voluntary work to improve seismic performance removing un-used hose towerDetails
hose tower removal and roof patching. voluntary work to improve seismic performance removing un-used hose tower | $300,000 | |
| Jul 9, 2019 | Completed final sign-off Apr 2021 | 2150 California St | hose tower removal and roof patching/repair. voluntary work to improve seismic performance removing un-used hose towerDetails
hose tower removal and roof patching/repair. voluntary work to improve seismic performance removing un-used hose tower | $300,000 | |
| Mar 18, 2019 | Never finaled issued Sep 2019, no final | 390 Buckingham Wy | emergency diesel generator replacement at grade in side yard and above ground belly fuel tank replacement; new fuel tank is increasing from 30 gallons to 521 gallons to provide minimum 72 hour runtime.Details
emergency diesel generator replacement at grade in side yard and above ground belly fuel tank replacement; new fuel tank is increasing from 30 gallons to 521 gallons to provide minimum 72 hour runtime. | $500,000 | |
| Feb 13, 2019 | Completed final sign-off Aug 2026 | 1935 32nd Av | fire station 18. emergency diesel generator to be mounted on new rear year equipment pad with integrated "belly" fuel tank. the location of the new generator & fuel tan remain the same. ** maher: n/a **Details
fire station 18. emergency diesel generator to be mounted on new rear year equipment pad with integrated "belly" fuel tank. the location of the new generator & fuel tan remain the same. ** maher: n/a ** | $250,000 | |
| Mar 27, 2018 | Expired or cancelled expired Aug 2025 | 201 Van Ness Av | modernization of 3 existing elevators including equipment & controls which serve levels 1-5Details
modernization of 3 existing elevators including equipment & controls which serve levels 1-5 | $15,000 | |
| Jul 19, 2017 | Completed final sign-off Oct 2018 | 1290 16th Av | reroofing - roofing system replacement - conc structure to remain. n/a maher ordinanceDetails
reroofing - roofing system replacement - conc structure to remain. n/a maher ordinance | $250,000 |