Block 3542, lot 025
135 Sanchez St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 12,497 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 24, 2021 | Completed final sign-off Jul 2021 | 135 Sanchez St | to obtain final inspection for work approved uner permit application no: 201805300433. all work is completed.Details
to obtain final inspection for work approved uner permit application no: 201805300433. all work is completed. | $75,000 | |
| Jul 9, 2019 | Completed final sign-off Mar 2021 | 135 Sanchez St | hose tower removal and roof patching. voluntary work to improve seismic performance removing un-used hose towerDetails
hose tower removal and roof patching. voluntary work to improve seismic performance removing un-used hose tower | $300,000 | |
| May 30, 2018 | Never finaled issued Jul 2018, no final | 135 Sanchez St | replacement of extg apparatus bay doors (telescope door) with new bi-folding doors for fs-6. n/a for maher.Details
replacement of extg apparatus bay doors (telescope door) with new bi-folding doors for fs-6. n/a for maher. | $75,000 | |
| Apr 19, 2013 | Completed final sign-off Dec 2013 | 135 Sanchez St | Becker Electric Inc | replace (e) emergency generator & manual tranfer switch with (n) generator (w/integral base tank) & automatic transfer switch.Details
replace (e) emergency generator & manual tranfer switch with (n) generator (w/integral base tank) & automatic transfer switch. | $190,000 |
| Apr 5, 2012 | Never finaled issued May 2012, no final | 135 Sanchez St | shower renovation at men's shower room and officer's toilet room includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors.Details
shower renovation at men's shower room and officer's toilet room includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors. | $18,000 | |
| Aug 4, 2011 | Completed final sign-off Apr 2012 | 135 Sanchez St | reroofingDetails
reroofing | $200,000 | |
| Apr 18, 2011 | Expired or cancelled cancelled Jan 2026 | 135 Sanchez St | Momentum Services Corp | wireless telecommunication facility: replace six panel antennas on extg rooftop tower (in kind replacement), relocate one extg equipment cabinet and one battery cabinet, and install one new equipment cabinet on rooftop.Details
wireless telecommunication facility: replace six panel antennas on extg rooftop tower (in kind replacement), relocate one extg equipment cabinet and one battery cabinet, and install one new equipment cabinet on rooftop. | $32,000 |
| Oct 12, 2001 | Completed final sign-off Jun 2002 | 135 Sanchez St | install wireless facility- mounting 9 antenna to (e)tower w/associated equip. cabinets@back low roofDetails
install wireless facility- mounting 9 antenna to (e)tower w/associated equip. cabinets@back low roof | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Becker Electric Inc, Momentum Services Corp
- Architects
- Benito Olguin, Thomas Matthew Jasmin
- Engineers
- Benito Olguin
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.