Benito Olguin
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Dpw / Design Build & Const
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Sep 2021
15 permits since 2000 (architect on 11 permits, engineer on 3 permits, authorized agent-others on 1 permit): 11 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2021 | In progress issued Feb 2024 | 375 Laguna Honda Bl | Rodan Builders Inc | replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is includedDetails
replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is included | $2,303,000 |
| Dec 20, 2013 | Never finaled issued Oct 2016, no final | 2251 Greenwich St | Asbetos Management Group | demolish 2-story, type 2, fire station #16.Details
demolish 2-story, type 2, fire station #16. | $250,000 |
| Sep 25, 2013 | Completed final sign-off Jun 2014 | 1298 Girard St | shower renovation inclusive of encapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills & edge trimming. replace water control valves, shower heads, floor drains, p-traps & new glass doors.Details
shower renovation inclusive of encapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills & edge trimming. replace water control valves, shower heads, floor drains, p-traps & new glass doors. | $66,000 | |
| Sep 25, 2013 | Completed final sign-off Sep 2015 | 80 Digby St | shower renovation inclusive of encapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills & edge trimming. replace water control valves, shower heads, floor drains, p-traps & new glass doors.Details
shower renovation inclusive of encapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills & edge trimming. replace water control valves, shower heads, floor drains, p-traps & new glass doors. | $9,000 | |
| Aug 1, 2013 | Completed final sign-off Jun 2014 | 1298 Girard St | reroofing. interior & exterior painting. minor stucco replacement at exterior. brick re-pointing at exterior, new waterproofing at roof decks. traffic coating on 1 roof plane. all work part of earthquake safety & emergency response bond (eser 1)Details
reroofing. interior & exterior painting. minor stucco replacement at exterior. brick re-pointing at exterior, new waterproofing at roof decks. traffic coating on 1 roof plane. all work part of earthquake safety & emergency response bond (eser 1) | $1,100,000 | |
| Aug 1, 2013 | Completed final sign-off Jun 2014 | 1298 Girard St | window replacement - visible from street, in-kind replacement, same size opening, max u-factor = 0.77, material & operation wood clad.Details
window replacement - visible from street, in-kind replacement, same size opening, max u-factor = 0.77, material & operation wood clad. | $21,000 | |
| Jul 20, 2012 | Completed final sign-off Dec 2013 | 530 Sansome St | reroofingDetails
reroofing | $105,000 | |
| Jul 20, 2012 | Completed final sign-off Apr 2013 | 1295 Shafter Av | reroofDetails
reroof | $340,000 | |
| Jul 2, 2012 | Completed final sign-off Oct 2012 | 1814 Stockton St | reroofing.Details
reroofing. | $125,000 | |
| Apr 5, 2012 | Never finaled issued May 2012, no final | 135 Sanchez St | shower renovation at men's shower room and officer's toilet room includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors.Details
shower renovation at men's shower room and officer's toilet room includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors. | $18,000 | |
| Apr 5, 2012 | Expired or cancelled expired Sep 2015 | 2150 California St | comply w/nov #200867193 - shower renovation includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors. (fire station 38)Details
comply w/nov #200867193 - shower renovation includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors. (fire station 38) | $9,000 | |
| Apr 5, 2012 | Completed final sign-off Oct 2012 | 1000 Ocean Av | shower renovation in men's bathroom includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors.Details
shower renovation in men's bathroom includive of incapsulation of shower stalls with 1/4" solid surface shower pan, walls, dividers, sills, & edge trimming. replacement of water ocntrol walves, shower heads, floor drains, p-traps, & new glass doors. | $9,000 | |
| Mar 7, 2012 | Completed final sign-off Oct 2012 | 1814 Stockton St | remove (e) wood deck, framing & privacy screen & replace in kind. 7 exhaust fans to be replaced as part of reroofing scope.Details
remove (e) wood deck, framing & privacy screen & replace in kind. 7 exhaust fans to be replaced as part of reroofing scope. | $37,000 | |
| Aug 4, 2011 | Completed final sign-off May 2012 | 2150 California St | reroofingDetails
reroofing | $100,000 | |
| Aug 4, 2011 | Completed final sign-off Apr 2012 | 135 Sanchez St | reroofingDetails
reroofing | $200,000 |