Block 0810, lot 001
201 Van Ness Ave
- City’s use
- Commercial Retail
- Lot
- 105,802 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2024 | Completed final sign-off Aug 2025 | 201 Van Ness Av | Siemens Industry, Inc. | fire work only for the addition of 2 emr smoke detector relays for elevators #1 and #2 on the basement level ref pa# 2023-0727-3091Details
fire work only for the addition of 2 emr smoke detector relays for elevators #1 and #2 on the basement level ref pa# 2023-0727-3091 | $1,200 |
| Jul 27, 2023 | Completed final sign-off Aug 2025 | 201 Van Ness Av | W E Lyons Construction Co | revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernizationDetails
revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernization | $70,000 |
| Dec 15, 2022 | Never finaled issued Dec 2022, no final | 201 Van Ness Av | Siemens Industry, Inc. | fire only work for the voluntary replacement of the fire alarm control & transponder (2) panels to upgrade the system, the work includes the replacement of (5) remote display panels for compatability. all field devices to remain as installed.Details
fire only work for the voluntary replacement of the fire alarm control & transponder (2) panels to upgrade the system, the work includes the replacement of (5) remote display panels for compatability. all field devices to remain as installed. | $18,000 |
| Oct 20, 2022 | Completed final sign-off Aug 2025 | 201 Van Ness Av | recommencement and complete work previously approved under pa# 201803274726. note: this permit was originally reviewed/approved by pw-dac under 201803274726Details
recommencement and complete work previously approved under pa# 201803274726. note: this permit was originally reviewed/approved by pw-dac under 201803274726 | $15,000 | |
| Oct 3, 2022 | Completed final sign-off Oct 2023 | 300 Franklin St | Siemens Industry, Inc. | fire only for the voluntary replacement of the fire alarm control panel to upgrade the system, all field devices to remain as installedDetails
fire only for the voluntary replacement of the fire alarm control panel to upgrade the system, all field devices to remain as installed | $5,000 |
| Sep 16, 2021 | Completed final sign-off May 2022 | 201 Van Ness Av | Siemens Industry, Inc. | basement: fire only work to add a module to send a firefighters hat signal to the controller for elevator 3 ref 201803274726Details
basement: fire only work to add a module to send a firefighters hat signal to the controller for elevator 3 ref 201803274726 | $500 |
| Nov 2, 2018 | Never finaled issued Nov 2018, no final | 300 Franklin St | D.F.P.F Corp Dba Fine Line Construction | opening hole in sidewalk to repair sewer ventDetails
opening hole in sidewalk to repair sewer vent | $14,349 |
| Mar 27, 2018 | Expired or cancelled expired Aug 2025 | 201 Van Ness Av | modernization of 3 existing elevators including equipment & controls which serve levels 1-5Details
modernization of 3 existing elevators including equipment & controls which serve levels 1-5 | $15,000 | |
| Mar 7, 2018 | Completed final sign-off May 2018 | 201 Van Ness Av | Siemens Industry, Inc. | fire alarm addition of 1 speaker/strobe for the "wegner" sound room on floor 1.Details
fire alarm addition of 1 speaker/strobe for the "wegner" sound room on floor 1. | $635 |
| Feb 16, 2018 | Completed final sign-off Mar 2018 | 201 Van Ness Av | Siemens Industry, Inc. | 1st floor - fire sprinkler work for the new sound room. (1) semi-reccessed fire sprinkler, (1) 1"-1.5" mech tee.Details
1st floor - fire sprinkler work for the new sound room. (1) semi-reccessed fire sprinkler, (1) 1"-1.5" mech tee. | $9,000 |
| Jul 23, 2015 | Completed final sign-off Aug 2015 | 201 Van Ness Av | Fidelity Roof Company | re-roofing. tear off 1 layer bur and install 140 sq ft 1/2" densdeck cement board and 60 mil duro-last pvc roofing.Details
re-roofing. tear off 1 layer bur and install 140 sq ft 1/2" densdeck cement board and 60 mil duro-last pvc roofing. | $206,000 |
| Sep 8, 2014 | Completed final sign-off Jan 2015 | 201 Van Ness Av | Fire Sentry Protection Services | kitchen hood fire suppression upgrade to ul 300; maher n/aDetails
kitchen hood fire suppression upgrade to ul 300; maher n/a | $6,705 |
| Jul 19, 2013 | Never finaled issued Nov 2013, no final | 201 Van Ness Av | Thomas Swan Sign Co Inc | erect 3 electric, single faced, wall new sign.Details
erect 3 electric, single faced, wall new sign. | $15,000 |
| Jul 2, 2013 | Completed final sign-off Jul 2013 | 300 Franklin St | Ayoob & Peery Plumbing Co Inc | ground floor-add & relocate fire sprinkler heads per t.i-add 5, relocate 3. relocate (e) fire hose cabinet.Details
ground floor-add & relocate fire sprinkler heads per t.i-add 5, relocate 3. relocate (e) fire hose cabinet. | $4,100 |
| Jun 20, 2013 | Never finaled issued Jul 2013, no final | 300 Franklin St | Siemens Industry, Inc. | addition of 8 speaker/strobes and 2 relay modules for the "zellerbach hall" remodel on floor 1 and the mezzanine. all devices connect onto the fire alarm system. ref pa #2013.05.14.6837Details
addition of 8 speaker/strobes and 2 relay modules for the "zellerbach hall" remodel on floor 1 and the mezzanine. all devices connect onto the fire alarm system. ref pa #2013.05.14.6837 | $5,000 |
| May 14, 2013 | Completed final sign-off Sep 2013 | 300 Franklin St | Hathaway Dinwiddie Co. | demo extg office and convert to two ada accessible toilet rooms. build new ada compliant ramp. install new damper in extg hvac. electrical upgradeDetails
demo extg office and convert to two ada accessible toilet rooms. build new ada compliant ramp. install new damper in extg hvac. electrical upgrade | $850,000 |
| May 23, 2012 | Completed final sign-off Oct 2012 | 300 Franklin St | Robison Nieri White Construction | remove & replace approx 1500 sq ft of sheetrock due to water damage. replace (e) flooring in kind. all work in basement chorus rehearsal room "c".Details
remove & replace approx 1500 sq ft of sheetrock due to water damage. replace (e) flooring in kind. all work in basement chorus rehearsal room "c". | $85,000 |
| Aug 19, 2011 | Never finaled issued Aug 2011, no final | 201 Van Ness Av | Thomas Swan Sign Co Inc | revision to permit #201107271157. revised bottom banner bracket attachment only.Details
revision to permit #201107271157. revised bottom banner bracket attachment only. | |
| Jul 29, 2011 | Never finaled issued Aug 2011, no final | 201 Van Ness Av | Thomas Swan Sign Co Inc | to erect electrical signDetails
to erect electrical sign | $25,000 |
| Jul 27, 2011 | Never finaled issued Aug 2011, no final | 201 Van Ness Av | Thomas Swan Sign Co Inc | to erect electrical sign/wall mounter display casesDetails
to erect electrical sign/wall mounter display cases | $30,000 |
| Jul 27, 2011 | Never finaled issued Aug 2011, no final | 201 Van Ness Av | Thomas Swan Sign Co Inc | to erect electrical signDetails
to erect electrical sign | $40,000 |
| Nov 29, 2010 | Completed final sign-off Feb 2011 | 201 Van Ness Av | Emcor Services/Mesa Energy Systems Inc | as built change to refrigerant monitor/ventilation system. ref 2010-0528-3491Details
as built change to refrigerant monitor/ventilation system. ref 2010-0528-3491 | |
| Aug 12, 2010 | Completed final sign-off Sep 2010 | 201 Van Ness Av | temporary tent and floor installed for sf symphony gala to be installed on 8/28/10 and removed on 9/9/10Details
temporary tent and floor installed for sf symphony gala to be installed on 8/28/10 and removed on 9/9/10 | $7,500 | |
| May 28, 2010 | Completed final sign-off Feb 2011 | 201 Van Ness Av | Emcor Services/Mesa Energy Systems Inc | davies symphony hall, boiler upgrade, chiller upgrade, vfd, piping retrofit. intake and exhaust louvers. new openings in concrete wall with reinforcing for louvers.Details
davies symphony hall, boiler upgrade, chiller upgrade, vfd, piping retrofit. intake and exhaust louvers. new openings in concrete wall with reinforcing for louvers. | $760,000 |
| Apr 7, 2010 | Never finaled issued Apr 2010, no final | 201 Van Ness Av | Vila Construction Co | architectural barrier removal @davies symphony hall: 1-existing restroom modifications-grove st. lobby; 2-interior(one)ramp modification serving terrace level audience seating; 3-install one new accessible drinking fountainDetails
architectural barrier removal @davies symphony hall: 1-existing restroom modifications-grove st. lobby; 2-interior(one)ramp modification serving terrace level audience seating; 3-install one new accessible drinking fountain | $87,670 |
| Sep 1, 2009 | Never finaled issued Sep 2009, no final | 201 Van Ness Av | temporary platform in parking lot for performance for one night event, dismantle and remove temporary platform after eventDetails
temporary platform in parking lot for performance for one night event, dismantle and remove temporary platform after event | $9,500 | |
| Apr 10, 2009 | Never finaled issued Apr 2009, no final | 201 Van Ness Av | Siemens Industry, Inc. | add modules to monitor server room for fire suppresion system.Details
add modules to monitor server room for fire suppresion system. | $7,649 |
| Nov 7, 2008 | Never finaled issued Nov 2008, no final | 201 Van Ness Av | Simplex Grinnell | clean agent suppression system for existing server room. (ansul novec 1230 to be installed.Details
clean agent suppression system for existing server room. (ansul novec 1230 to be installed. | $16,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 201 Van Ness Av | construct temporary platform in parking lot for outdoor performanceDetails
construct temporary platform in parking lot for outdoor performance | $9,500 | |
| Sep 7, 2007 | Never finaled issued Sep 2007, no final | 201 Van Ness Av | costruct temporary platform in parking lot for outdoor performanceDetails
costruct temporary platform in parking lot for outdoor performance | $9,500 | |
| Aug 30, 2005 | Completed final sign-off Aug 2006 | 300 Franklin St | replace ballet floor & ada work including plumbing fixtures, signage, toilet accessories, handrails,Details
replace ballet floor & ada work including plumbing fixtures, signage, toilet accessories, handrails, | $140,000 | |
| Jul 20, 2005 | Never finaled issued Oct 2005, no final | 201 Van Ness Av | Siemens Industry, Inc. | upgradefire alarmsystemto incorporate changes to new building automation system.Details
upgradefire alarmsystemto incorporate changes to new building automation system. | $15,000 |
| Jul 8, 2005 | Completed final sign-off Jul 2005 | 270 Hayes St | Robison Nieri White Construction | administrative change to app#200412161632, permit#1043998. remove note for fire and alarm.Details
administrative change to app#200412161632, permit#1043998. remove note for fire and alarm. | |
| Dec 16, 2004 | Completed final sign-off Jul 2005 | 270 Hayes St | Robison Nieri White Construction | approx.280 sq.ft.interior t.i. in b occupancy consisting of computer room alterations,Details
approx.280 sq.ft.interior t.i. in b occupancy consisting of computer room alterations, | $20,000 |
| Nov 8, 2004 | Expired or cancelled expired Mar 2006 | 201 Van Ness Av | installation of safety railsDetails
installation of safety rails | $80,000 | |
| Jun 21, 2004 | Never finaled filed Jun 2004, never issued | 201 Van Ness Av | installation of safety railsDetails
installation of safety rails | ||
| May 2, 2003 | Never finaled issued May 2003, no final | 300 Franklin St | Standard Electric Const. | as built previous app#200301175388 fire alarmDetails
as built previous app#200301175388 fire alarm | |
| Apr 21, 2003 | Never finaled issued Dec 2003, no final | 201 Van Ness Av | 5th floor - hvac controll upgrade througout entire buiding.Details
5th floor - hvac controll upgrade througout entire buiding. | ||
| Jan 17, 2003 | Never finaled issued Jan 2003, no final | 300 Franklin St | Standard Electric Const. | replace existing fire system. this permit is for device location, complet shop plans will be submiteDetails
replace existing fire system. this permit is for device location, complet shop plans will be submite | $200,000 |
| Aug 14, 2001 | Expired or cancelled expired Aug 2002 | 201 Van Ness Av | Standard Electric Const. | revise to app #9910089 phase i phase 2 consist of completion the sym for entire bldgDetails
revise to app #9910089 phase i phase 2 consist of completion the sym for entire bldg | $100,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.