Block 4591C, lot 010
101 Horne Ave
- City’s use
- Commercial Office
- Lot
- 292,331 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2023 | Completed final sign-off Jun 2023 | 101 Horne Av | Svala Construction Inc | permit ref# 201912300885 - 2nd floor studio, 150 sq ft. during the construction of the above ref permitted project, a small electrical fire damaged an artist studio. dbi inspector michael gunnell inspector the damage and approved a no plans required correct report- like for like repairs. stud, roofDetails
permit ref# 201912300885 - 2nd floor studio, 150 sq ft. during the construction of the above ref permitted project, a small electrical fire damaged an artist studio. dbi inspector michael gunnell inspector the damage and approved a no plans required correct report- like for like repairs. stud, roof | $40,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2022 | 101 Horne Av | Arana Group, Inc. | revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil.Details
revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil. | $50,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2022 | 101 Horne Av | Arana Group, Inc. | fire evacuation maps only. ref 201912300885. (18 total)Details
fire evacuation maps only. ref 201912300885. (18 total) | $7,614 |
| Jan 13, 2022 | Completed final sign-off Jun 2022 | 101 Horne Av | Hoseley Corporation | construction of a temporary parking lot (18,000sqft). approx 1' of fill under 2" lift of asphalt. realign pedestrian pathway. stripe and install wheel stops at northern limit.Details
construction of a temporary parking lot (18,000sqft). approx 1' of fill under 2" lift of asphalt. realign pedestrian pathway. stripe and install wheel stops at northern limit. | $195,000 |
| Dec 28, 2021 | Completed final sign-off Apr 2022 | 101 Horne Av | Hoseley Corporation | striping to be performed @ the eastern parking lot of hunter's point shipyard bldg 101. refreshing (e) marks for approx 8 spaces including 2 handicap stalls to be refreshed (no ada stall modify) remove (e) striping of approx 25 spaces &(n) layout on c3.00 to create new spaces. no wheel stopsDetails
striping to be performed @ the eastern parking lot of hunter's point shipyard bldg 101. refreshing (e) marks for approx 8 spaces including 2 handicap stalls to be refreshed (no ada stall modify) remove (e) striping of approx 25 spaces &(n) layout on c3.00 to create new spaces. no wheel stops | $5,000 |
| Dec 22, 2021 | Completed final sign-off Jul 2022 | 101 Horne Av | Siemens Industry, Inc. | 1/f: install a sprinler monitoring fire alarm panel for the building. ref pa201912300885.Details
1/f: install a sprinler monitoring fire alarm panel for the building. ref pa201912300885. | $7,000 |
| Dec 7, 2021 | Completed final sign-off Nov 2022 | 101 Horne Av | Navarro Concrete Construction | exterior: install a new concrete slab for the (e) propane tank on southeast corner of building.Details
exterior: install a new concrete slab for the (e) propane tank on southeast corner of building. | $1,000 |
| Sep 13, 2021 | Completed final sign-off Jun 2022 | 101 Horne Av | Bay Cities Fire Protection | fire sprinklers art gallery. ref. pa 201912300885.Details
fire sprinklers art gallery. ref. pa 201912300885. | $55,000 |
| Aug 18, 2021 | Completed final sign-off Feb 2022 | 101 Horne Av | Arana Group, Inc. | pw ocii bldg 101 p2 hunters point shipyard building 101 upgrade install 4" ductile iron pipe from (e) 8" dedicated fire water line ref pa# 20191011230-0885,Details
pw ocii bldg 101 p2 hunters point shipyard building 101 upgrade install 4" ductile iron pipe from (e) 8" dedicated fire water line ref pa# 20191011230-0885, | $45,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 101 Horne Av | Arana Group, Inc. | convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable**Details
convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable** | $3,000,000 |
| Jul 3, 2019 | Completed final sign-off Sep 2019 | 103 Horne Av | Sabah International Incorporated | remove and replace 18 (e) smoke detextors w/ heat detectors at their current location, this is a one for one replacementDetails
remove and replace 18 (e) smoke detextors w/ heat detectors at their current location, this is a one for one replacement | $10,980 |
| Dec 27, 2018 | Completed final sign-off Feb 2019 | 101 Horne Av | Finishworks Of Sf | bldg 116: to comply with nov #201810611. repair and maintain wood fire escape balcony and ladder.Details
bldg 116: to comply with nov #201810611. repair and maintain wood fire escape balcony and ladder. | $1,500 |
| Dec 27, 2018 | Completed final sign-off Feb 2019 | 101 Horne Av | Finishworks Of Sf | bldg 115: to comply with nov #201810611. repair and maintain wood fire escape balcony and ladder.Details
bldg 115: to comply with nov #201810611. repair and maintain wood fire escape balcony and ladder. | $800 |
| Apr 10, 2018 | Expired or cancelled cancelled Jul 2024 | 102 Horne Av | revision to clarify 2015-07-15-1524 to be "artist space". revision to omit deferred approval for photovoltaic.Details
revision to clarify 2015-07-15-1524 to be "artist space". revision to omit deferred approval for photovoltaic. | ||
| Jul 12, 2017 | Expired or cancelled cancelled Feb 2024 | 102 Horne Av | revisions to approved plans permit #2014-0630-9976. change of retaining wall add cp drawings.Details
revisions to approved plans permit #2014-0630-9976. change of retaining wall add cp drawings. | $2,000 | |
| Jun 15, 2017 | Never finaled issued Sep 2017, no final | 102 Horne Av | Granite Const Co | revision to 201406309976 shoring. maher naDetails
revision to 201406309976 shoring. maher na | $200,000 |
| Apr 24, 2017 | Completed final sign-off Nov 2017 | 102 Horne Av | Evans Brothers Inc | demolition of type iv, two story commercial building. ** maher: n/a **Details
demolition of type iv, two story commercial building. ** maher: n/a ** | $350,000 |
| Apr 13, 2017 | Never finaled filed Apr 2017, never issued | 102 Horne Av | Evans Brothers Inc | demolish 2-story commercial building. ** maher: n/a ** | $350,000 |
| May 20, 2016 | Completed final sign-off Mar 2017 | 103 Horne Av | Value Fire Protection Inc | install one 4" riser for sprinkler at commercial kitchen, ref. new bldg. pa#201403211434. n/a ordinance #155-13; ref201603010919/r2 - ugDetails
install one 4" riser for sprinkler at commercial kitchen, ref. new bldg. pa#201403211434. n/a ordinance #155-13; ref201603010919/r2 - ug | $5,300 |
| Mar 2, 2016 | Completed final sign-off Jul 2017 | 103 Horne Av | Sabah International Incorporated | provide a new fire alarm system for the hunters point commercial kitchen. the system shall include: annunicator, pull station, duct detectors w/ central relays, and insul ada compliant devices throughout the bld. maher naDetails
provide a new fire alarm system for the hunters point commercial kitchen. the system shall include: annunicator, pull station, duct detectors w/ central relays, and insul ada compliant devices throughout the bld. maher na | $24,028 |
| Mar 1, 2016 | Never finaled issued Apr 2016, no final | 103 Horne Av | Azul Works, Inc. | ref permit 2014-03-21-1434 s/2. install new f.w. main and 4 new fire hydrants to protect new commercial kitchen and bldg 101 artist parcel. sprinklers by others. n/a for maher ordinance.Details
ref permit 2014-03-21-1434 s/2. install new f.w. main and 4 new fire hydrants to protect new commercial kitchen and bldg 101 artist parcel. sprinklers by others. n/a for maher ordinance. | $160,000 |
| Jan 8, 2016 | Never finaled issued Jan 2016, no final | 103 Horne Av | Firemaster | r-102 ansul kitchen system install. ref app#201403211434. n/a for maher.Details
r-102 ansul kitchen system install. ref app#201403211434. n/a for maher. | $5,000 |
| Sep 16, 2015 | Never finaled issued Oct 2015, no final | 101 Horne Av | Carters Construction | replace existing exit exterior stairs in-kind maher naDetails
replace existing exit exterior stairs in-kind maher na | $60,000 |
| Sep 16, 2015 | Completed final sign-off Apr 2018 | 103 Horne Av | Carters Construction | site build elevator to replace previously approved modular elevator ref pa 201403211434. n/a maherDetails
site build elevator to replace previously approved modular elevator ref pa 201403211434. n/a maher | $60,000 |
| Aug 14, 2015 | Never finaled issued Apr 2016, no final | 102 Horne Av | Carters Construction | excavation & installation of interim roadways around the new artist building @ hunters point shipyard. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
excavation & installation of interim roadways around the new artist building @ hunters point shipyard. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $1,000,000 |
| Jul 15, 2015 | Never finaled issued Jun 2016, no final | 102 Horne Av | revision to 201406309976. request application modification of bldg type from iia to iiia.Details
revision to 201406309976. request application modification of bldg type from iia to iiia. | ||
| Aug 22, 2014 | Completed final sign-off Sep 2014 | 101 Horne Av | Jk Pro Roofing | reroofing (n/a maher ordinance # 155-13)Details
reroofing (n/a maher ordinance # 155-13) | $20,000 |
| Jun 30, 2014 | Never finaled issued Apr 2015, no final | 102 Horne Av | to erect 5 stories, no basement artist space. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
to erect 5 stories, no basement artist space. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $19,600,000 | |
| Mar 21, 2014 | Completed final sign-off Apr 2018 | 103 Horne Av | Colombo Construction Co Inc, Carters Construction | to erect 2 stories, no basement, food processing building. ** maher: compliance with ordinance no# 155-13 required. route to dph **Details
to erect 2 stories, no basement, food processing building. ** maher: compliance with ordinance no# 155-13 required. route to dph ** | $600,000 |
| Mar 6, 2014 | Never finaled issued Mar 2014, no final | 103 Horne Av | add address 103 horne ave to block 4591c, lot 010.Details
add address 103 horne ave to block 4591c, lot 010. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arana Group, Inc. (4), Carters Construction (4), Evans Brothers Inc (2), Finishworks Of Sf (2), Hoseley Corporation (2), Sabah International Incorporated (2), Azul Works, Inc., Bay Cities Fire Protection, Colombo Construction Co Inc, Firemaster, Granite Const Co, Jk Pro Roofing, Navarro Concrete Construction, Siemens Industry, Inc., Svala Construction Inc, Value Fire Protection Inc
- Architects
- Patricia Lock (4), David Cartnal (2), Will Kwan
- Engineers
- Charles Hampal (3), Raymond Lui (2), Clifford Ball, Dale Newkirk, Mohammed Ali, Randy Collins
- Authorized agents
- Patricia Lock
- Designers
- Ronald Arana