Charles Hampal
- License
- 53325
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Bkf Engineers
- Based in
- Redwood City
- On San Francisco permits
- Aug 2015 to Jan 2022
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hoseley Corporation (2), Carters Construction
- Engineers
- Clifford Ball, Dale Newkirk, Mohammed Ali
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2022 | Completed final sign-off Jun 2022 | 101 Horne Av | Hoseley Corporation | construction of a temporary parking lot (18,000sqft). approx 1' of fill under 2" lift of asphalt. realign pedestrian pathway. stripe and install wheel stops at northern limit.Details
construction of a temporary parking lot (18,000sqft). approx 1' of fill under 2" lift of asphalt. realign pedestrian pathway. stripe and install wheel stops at northern limit. | $195,000 |
| Dec 28, 2021 | Completed final sign-off Apr 2022 | 101 Horne Av | Hoseley Corporation | striping to be performed @ the eastern parking lot of hunter's point shipyard bldg 101. refreshing (e) marks for approx 8 spaces including 2 handicap stalls to be refreshed (no ada stall modify) remove (e) striping of approx 25 spaces &(n) layout on c3.00 to create new spaces. no wheel stopsDetails
striping to be performed @ the eastern parking lot of hunter's point shipyard bldg 101. refreshing (e) marks for approx 8 spaces including 2 handicap stalls to be refreshed (no ada stall modify) remove (e) striping of approx 25 spaces &(n) layout on c3.00 to create new spaces. no wheel stops | $5,000 |
| Aug 14, 2015 | Never finaled issued Apr 2016, no final | 102 Horne Av | Carters Construction | excavation & installation of interim roadways around the new artist building @ hunters point shipyard. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
excavation & installation of interim roadways around the new artist building @ hunters point shipyard. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $1,000,000 |