Erik C.P. Alderson
- License
- 60733
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Sage Consulting Engeers, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to Dec 2022
1 permit since 2000 (engineer on 1 permit): 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Suffolk Constr Co. Inc. Dba Suffolk-Roel
- Architects
- Colin Mosher
- Engineers
- Matthew R. Deamer, Raymond Lui
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2022 | In progress issued Mar 2024 | 1490 Mason St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | priority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2)Details
priority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2) | $42,487,700 |