R & S Construction Management Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Jul 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 4 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2025 | Completed final sign-off May 2026 | 501 Stanyan St | parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st.Details
parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st. | $170,340 |
| Jun 3, 2025 | In progress filed Jun 2025, not yet issued | 800 Grant Av | revision to pa #202402276649 to include removal of existing steel beams and replaced with a 10" thick reinforced concrete slabDetails
revision to pa #202402276649 to include removal of existing steel beams and replaced with a 10" thick reinforced concrete slab | |
| Feb 27, 2024 | In progress issued Jun 2024 | 800 Grant Av | alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalkDetails
alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk | $100,000 |
| Feb 27, 2024 | In progress issued Jun 2024 | 391 Sutter St | alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalkDetails
alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk | $100,000 |
| Jan 29, 2024 | In progress issued Feb 2024 | 387 Ellis St | structural alteration of subsidewalk basement roof slab to install new accessible curb rampsDetails
structural alteration of subsidewalk basement roof slab to install new accessible curb ramps | $80,000 |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 415 Jones St | reconstructing sub sidewalk basement slabDetails
reconstructing sub sidewalk basement slab | $400,000 |
| Mar 5, 2021 | Completed final sign-off May 2023 | 602 Jackson St | alteration of subsidewalk basement roof slab to install new accessible curb ramp.Details
alteration of subsidewalk basement roof slab to install new accessible curb ramp. | $80,000 |
| Oct 30, 2018 | Never finaled issued Jan 2019, no final | 80 09th St | alteration of subsidewalk basement slab to accomodate new curb ramp.Details
alteration of subsidewalk basement slab to accomodate new curb ramp. | $120,000 |
| Dec 22, 2016 | Completed final sign-off May 2017 | 477 Greenwich St | strengthening of walls at garage storage level of (e) 7 unit 4 story bld as well as the replacement of appx 33 lineal ft foundation on west sideDetails
strengthening of walls at garage storage level of (e) 7 unit 4 story bld as well as the replacement of appx 33 lineal ft foundation on west side | $40,000 |
| Dec 7, 2015 | Expired or cancelled expired Jul 2019 | 1295 Shafter Av | renovation of (4) existing shower stalls, including installation of new accessible stall. replacement of plumbing valves, shower heads, assoc plbg work. new framed walls for tile finish. new slab openings for floor drain relocation. n/a maher ordinanceDetails
renovation of (4) existing shower stalls, including installation of new accessible stall. replacement of plumbing valves, shower heads, assoc plbg work. new framed walls for tile finish. new slab openings for floor drain relocation. n/a maher ordinance | $80,000 |
| Apr 30, 2015 | Completed final sign-off Mar 2016 | 478 Green St | revision to pa#201503060179, renovation of existing floor joists in preparation for new bar, installation utility wall behind new bar. upgrade existing restroom to ada compliance. (see reference drawing set)Details
revision to pa#201503060179, renovation of existing floor joists in preparation for new bar, installation utility wall behind new bar. upgrade existing restroom to ada compliance. (see reference drawing set) | $16,000 |