Block 0236, lot 018
275 Sacramento St
- City’s use
- Commercial Office
- Built
- 2000
- Stories
- 8
- Building
- 95,955 sq ft
- Lot
- 12,603 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
64 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2025 | In progress issued Oct 2025 | 275 Sacramento St | Custom Contracting Services | install 4 anchorage bolts into the brick facade facing front street at 24' above street level w/ hilti hit-hy 270 masonry epoxy with 5/8-13x6" shoulder nut eye bolt grade 304 stainless steel anchors w 6" min anchor embed to face of brick. lon permit #25me-00016.Details
install 4 anchorage bolts into the brick facade facing front street at 24' above street level w/ hilti hit-hy 270 masonry epoxy with 5/8-13x6" shoulder nut eye bolt grade 304 stainless steel anchors w 6" min anchor embed to face of brick. lon permit #25me-00016. | $5,000 |
| Sep 30, 2022 | Never finaled issued Sep 2022, no final | 275 Sacramento St | Aquamatic Fire Protection | plug (1) pdendent fire sprinkler, no underground workDetails
plug (1) pdendent fire sprinkler, no underground work | $5,900 |
| Sep 15, 2022 | Completed final sign-off Feb 2023 | 275 Sacramento St | Wci-Gc Inc | 5th fl: ab 017: interior demolition of non-structural elements including interior partitions, doors, finishes, electrical outlets and switches. space shall remain unoccupied until future tenant build out. per ab017 t.i. mep & life safety modification under seperate future permit.Details
5th fl: ab 017: interior demolition of non-structural elements including interior partitions, doors, finishes, electrical outlets and switches. space shall remain unoccupied until future tenant build out. per ab017 t.i. mep & life safety modification under seperate future permit. | $75,698 |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 275 Sacramento St | Johnson Controls Inc. | replace existing bms (building management system) controls with new revised controllers and software smoke controls upgrade. ref pa #201802141220Details
replace existing bms (building management system) controls with new revised controllers and software smoke controls upgrade. ref pa #201802141220 | $250,000 |
| Mar 30, 2015 | Completed final sign-off May 2015 | 275 Sacramento St | Principal Builders Inc. | floor 3rd -demo of extg partitions and finishes. construction of one reception, office and confrence room. no new structural work. n/a for maher.Details
floor 3rd -demo of extg partitions and finishes. construction of one reception, office and confrence room. no new structural work. n/a for maher. | $35,000 |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 275 Sacramento St | G P Fire Protection | add one sprinkler head in training area due to new walls added, relocate one sprinkler head out of light fixture. t.i. pa#201403251631 n/a ordinance #155-13Details
add one sprinkler head in training area due to new walls added, relocate one sprinkler head out of light fixture. t.i. pa#201403251631 n/a ordinance #155-13 | $3,800 |
| Mar 25, 2014 | Completed final sign-off Sep 2014 | 275 Sacramento St | Walgreen Company | remodel in an existing walgreens. work includes adding a consult room within an exising office, adding a wall and door by the pharmacy, and related work associated with these modifications. life safety under seperate permit. maher not required. less than 50 cu.yd.Details
remodel in an existing walgreens. work includes adding a consult room within an exising office, adding a wall and door by the pharmacy, and related work associated with these modifications. life safety under seperate permit. maher not required. less than 50 cu.yd. | $40,000 |
| Dec 19, 2011 | Never finaled filed Dec 2011, never issued | 275 Sacramento St | provide shaft wall with ul rated counter fire door, relocation of duct work, interior work only for existing shaft opening. to comply with complaint #201073301Details
provide shaft wall with ul rated counter fire door, relocation of duct work, interior work only for existing shaft opening. to comply with complaint #201073301 | $4,000 | |
| Dec 1, 2011 | Expired or cancelled cancelled Jan 2012 | 275 Sacramento St | Legacy Mechanical & Energy Services, Inc | replacement of boiler like for likeDetails
replacement of boiler like for like | $91,000 |
| Mar 16, 2011 | Completed final sign-off Oct 2011 | 275 Sacramento St | Walgreen Company | removal of e 1 hr photo, update ceiling and soffit. addition of refrigeration case, new beverage center, new checkout, cosmetic, pharmacy and employee room. new finish throughout. perform work to comply with complaint 201073301. refer by sffdDetails
removal of e 1 hr photo, update ceiling and soffit. addition of refrigeration case, new beverage center, new checkout, cosmetic, pharmacy and employee room. new finish throughout. perform work to comply with complaint 201073301. refer by sffd | $125,000 |
| Sep 13, 2010 | Completed final sign-off Sep 2010 | 275 Sacramento St | Carter Brothers Fire & Life Safety | relocate 4 existing fire alarm speaker strobes in ti space ( ti under pa@ 2010.07.02.5862) on floors 4, 6 and 7. no new fa devices or equipment.Details
relocate 4 existing fire alarm speaker strobes in ti space ( ti under pa@ 2010.07.02.5862) on floors 4, 6 and 7. no new fa devices or equipment. | $4,200 |
| Aug 4, 2010 | Completed final sign-off Sep 2010 | 275 Sacramento St | Field Construction Inc. | floor 4,6,7 -mech and elec. design build drawings for 201007025862. provide lighting in new offices. adjust existing havac to accomodate new layout- 2 fsd's relocated- fire alarm and sprinklers separate permits...Details
floor 4,6,7 -mech and elec. design build drawings for 201007025862. provide lighting in new offices. adjust existing havac to accomodate new layout- 2 fsd's relocated- fire alarm and sprinklers separate permits... | $225,000 |
| Jul 19, 2010 | Completed final sign-off Sep 2010 | 275 Sacramento St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements-4th floor-12 relocate, remove 1. 6th floor-49 relocate, 4 remove. 7th floor-4 relocateDetails
relocate fire sprinkler heads per tenant improvements-4th floor-12 relocate, remove 1. 6th floor-49 relocate, 4 remove. 7th floor-4 relocate | $1,290 |
| Jul 2, 2010 | Completed final sign-off Sep 2010 | 275 Sacramento St | Field Construction Inc. | 4th, 6th & 7th floors-demo of (e) non structural walls, millwork, ceiling & finishes. new non struct walls, millwork, ceiling & finishes. no change in occupancy, use or square feet. m.e.p, sprklers, fire alarm under seperate permit. note: there is a change of use on 7th floor only from b to b, a2.Details
4th, 6th & 7th floors-demo of (e) non structural walls, millwork, ceiling & finishes. new non struct walls, millwork, ceiling & finishes. no change in occupancy, use or square feet. m.e.p, sprklers, fire alarm under seperate permit. note: there is a change of use on 7th floor only from b to b, a2. | $525,000 |
| Jan 30, 2007 | Never finaled issued Jan 2007, no final | 275 Sacramento St | to erect electrical signDetails
to erect electrical sign | ||
| Apr 19, 2005 | Completed final sign-off May 2005 | 275 Sacramento St | R L H Fire Protection Inc | oti 2 - 6th floor, sp.Details
oti 2 - 6th floor, sp. | $500 |
| Apr 7, 2005 | Completed final sign-off May 2005 | 275 Sacramento St | oti-1 6th floor el lsDetails
oti-1 6th floor el ls | $28,000 | |
| Jul 16, 2004 | Completed final sign-off Dec 2004 | 275 Sacramento St | Bcci Construction Company | oti-1 6/f el,sp,me,lsDetails
oti-1 6/f el,sp,me,ls | $15,000 |
| Mar 22, 2004 | Completed final sign-off Apr 2004 | 275 Sacramento St | modify (e)lobby entry doors,removal of magnelic locks & install new exit device (panic hardware)Details
modify (e)lobby entry doors,removal of magnelic locks & install new exit device (panic hardware) | $8,700 | |
| Feb 12, 2004 | Expired or cancelled expired Jun 2010 | 275 Sacramento St | Martinelli Environmental Graph | erect non-electric single faced wall signDetails
erect non-electric single faced wall sign | |
| Apr 15, 2003 | Expired or cancelled expired Jan 2004 | 275 Sacramento St | Bcci Construction Company | renew:l200103204771 & 200104116556 for final inspection onlyDetails
renew:l200103204771 & 200104116556 for final inspection only | |
| Apr 7, 2003 | Completed final sign-off Sep 2003 | 275 Sacramento St | Dpr Construction Inc | minor alterations to roof ferrace under previousing approved app#9807375sDetails
minor alterations to roof ferrace under previousing approved app#9807375s | $68,000 |
| Apr 1, 2003 | Expired or cancelled expired Dec 2005 | 275 Sacramento St | Allied Heating & Air Conditioning | install new vav zones & re-balance floors 3,4 & 5. volume of air to each floor to remain unchanged.Details
install new vav zones & re-balance floors 3,4 & 5. volume of air to each floor to remain unchanged. | $108,490 |
| Mar 19, 2003 | Completed final sign-off Sep 2003 | 275 Sacramento St | Dpr Construction Inc | planning review of satellite dish installationDetails
planning review of satellite dish installation | $65,000 |
| Mar 10, 2003 | Expired or cancelled expired Jan 2004 | 275 Sacramento St | Dpr Construction Inc | interior wall demolition, non-str'l only on floors 3 to 5 only. construction separate permit.Details
interior wall demolition, non-str'l only on floors 3 to 5 only. construction separate permit. | $15,000 |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | to renew signoff of#200108135913 for work on the 5th floorDetails
to renew signoff of#200108135913 for work on the 5th floor | |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | renew & sign on 200103013223 &200103124037 for work on 8th flr for finalDetails
renew & sign on 200103013223 &200103124037 for work on 8th flr for final | |
| Dec 6, 2002 | Completed final sign-off Jun 2003 | 275 Sacramento St | Bcci Construction Company | this permit for final signoff#200104066274 work in the lobbyDetails
this permit for final signoff#200104066274 work in the lobby | |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | renew#200105179483&200203295584 for work on floors 1,3,4,5,6,7,&8 to finalDetails
renew#200105179483&200203295584 for work on floors 1,3,4,5,6,7,&8 to final | |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | renew app 200102071557 & 200103013250- for work on the 6th flr for final inspection onlyDetails
renew app 200102071557 & 200103013250- for work on the 6th flr for final inspection only | |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | renew permit app 200103013222 & 200103093891- for work on 7th floor, for final inspectionDetails
renew permit app 200103013222 & 200103093891- for work on 7th floor, for final inspection | |
| Aug 13, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | fire sprinkler pre-action system work on 5th floor. this is an "as built" drawing for the fire dept.Details
fire sprinkler pre-action system work on 5th floor. this is an "as built" drawing for the fire dept. | $8,000 |
| May 17, 2001 | Expired or cancelled expired Nov 2001 | 275 Sacramento St | Bcci Construction Company | fire alarm shop drawings for work on the 7th & 8th flsDetails
fire alarm shop drawings for work on the 7th & 8th fls | $18,000 |
| Apr 19, 2001 | Expired or cancelled expired Oct 2001 | 275 Sacramento St | Tyco Integrated Security | access control system on stairwells for 6 flrs 3-8, interface w/lock pwr by l/s systm to unlk doorsDetails
access control system on stairwells for 6 flrs 3-8, interface w/lock pwr by l/s systm to unlk doors | $10,000 |
| Apr 11, 2001 | Expired or cancelled expired Sep 2001 | 275 Sacramento St | Bcci Construction Company | revision to 200103204771 additional work at pre action system on the 5th floorDetails
revision to 200103204771 additional work at pre action system on the 5th floor | $2,500 |
| Apr 6, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | lobby finishes and minor construction on the ground fl including mechanical/elec. (n) bldg. 1st timeDetails
lobby finishes and minor construction on the ground fl including mechanical/elec. (n) bldg. 1st time | $100,000 |
| Apr 3, 2001 | Expired or cancelled expired Aug 2001 | 275 Sacramento St | to erect non-electrical signDetails
to erect non-electrical sign | ||
| Mar 29, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | fire alarm installation on floors 3,4,5,and 6Details
fire alarm installation on floors 3,4,5,and 6 | $60,000 |
| Mar 20, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | fire sprinkler work calculated on floors 8,7,6,5,4,3,gr floorDetails
fire sprinkler work calculated on floors 8,7,6,5,4,3,gr floor | $100,000 |
| Mar 12, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | oti-2 8th floor ms elDetails
oti-2 8th floor ms el | $125,000 |
| Mar 9, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | oti-2, 7th fl,ltg mechDetails
oti-2, 7th fl,ltg mech | $150,000 |
| Mar 1, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | structural work for skylite (int) on the 6th floor, oti assocated w/this is 200010131081-20010107155Details
structural work for skylite (int) on the 6th floor, oti assocated w/this is 200010131081-20010107155 | $18,000 |
| Mar 1, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | oti-1, 8th floor, el, me, ls, spDetails
oti-1, 8th floor, el, me, ls, sp | $300,000 |
| Mar 1, 2001 | Expired or cancelled expired Sep 2002 | 275 Sacramento St | Bcci Construction Company | oti-1, 7th floor, el, me, l/s & spDetails
oti-1, 7th floor, el, me, l/s & sp | $300,000 |
| Feb 16, 2001 | Expired or cancelled expired Jun 2001 | 275 Sacramento St | street spaceDetails
street space | ||
| Feb 8, 2001 | Expired or cancelled expired Jun 2001 | 275 Sacramento St | add platform above the intermediate landing of level 7th to meet osha requirements (ladder not to exDetails
add platform above the intermediate landing of level 7th to meet osha requirements (ladder not to ex | $2,000 | |
| Feb 7, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-2 6th flr, ltg. mechDetails
oti-2 6th flr, ltg. mech | $350,000 |
| Feb 7, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-2 5th floor ltg,mechDetails
oti-2 5th floor ltg,mech | $350,000 |
| Jan 31, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-1 6th flr ,el,me,l/s & spDetails
oti-1 6th flr ,el,me,l/s & sp | $600,000 |
| Jan 31, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-1 5th floor, el, me, l/s & spDetails
oti-1 5th floor, el, me, l/s & sp | $600,000 |
| Jan 26, 2001 | Completed final sign-off Aug 2001 | 275 Sacramento St | revise to appln #9807375/s5 combine 2 smoke control zones into 1 zone (1st floor & nd floor)Details
revise to appln #9807375/s5 combine 2 smoke control zones into 1 zone (1st floor & nd floor) | ||
| Jan 17, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-2 3/f el me oti1 = 200101109528Details
oti-2 3/f el me oti1 = 200101109528 | $350,000 |
| Jan 11, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-1 4th fl/ electrical, mechanicalDetails
oti-1 4th fl/ electrical, mechanical | $350,000 |
| Jan 10, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | oti-1 3rd floor, electrical, mechanical,sprinkler, lifesaftyDetails
oti-1 3rd floor, electrical, mechanical,sprinkler, lifesafty | $600,000 | |
| Jan 10, 2001 | Completed final sign-off Dec 2002 | 275 Sacramento St | Bcci Construction Company | oti-1 4th floor mehcanical, lifesafty, electrical,sprinklerDetails
oti-1 4th floor mehcanical, lifesafty, electrical,sprinkler | $600,000 |
| Dec 27, 2000 | Completed final sign-off Mar 2002 | 275 Sacramento St | Kimberlite Corporation | install fire alarm communicator for alarm panel approved under app#9807375s5 at g/f in e rm.Details
install fire alarm communicator for alarm panel approved under app#9807375s5 at g/f in e rm. | $1,000 |
| Dec 18, 2000 | Expired or cancelled withdrawn Jul 2001 | 290 Front St | revise fire alarm system per plansDetails
revise fire alarm system per plans | ||
| Nov 30, 2000 | Completed final sign-off Aug 2001 | 275 Sacramento St | revision to app #9807375/s5Details
revision to app #9807375/s5 | ||
| Nov 8, 2000 | Completed final sign-off Sep 2001 | 290 Front St | correct address fr 265 sacramento to 290 front(#9924183s, 2000: 09019481/09069720 revi 09019481Details
correct address fr 265 sacramento to 290 front(#9924183s, 2000: 09019481/09069720 revi 09019481 | $12,000 | |
| Oct 16, 2000 | Expired or cancelled expired Mar 2002 | 265 Sacramento St | Fluoresco Lighting & Sign | sign permit-electric , wall , single faced.Details
sign permit-electric , wall , single faced. | |
| Sep 6, 2000 | Completed final sign-off Mar 2002 | 265 Sacramento St | provide sprinklers per planDetails
provide sprinklers per plan | ||
| Sep 1, 2000 | Completed final sign-off Mar 2002 | 265 Sacramento St | provide fire alarm system per plansDetails
provide fire alarm system per plans | ||
| Jul 5, 2000 | Completed final sign-off Aug 2001 | 275 Sacramento St | provide exterior curtain wall site permit under app #9807375/sDetails
provide exterior curtain wall site permit under app #9807375/s | ||
| Mar 22, 2000 | Completed final sign-off Mar 2002 | 265 Sacramento St | retail space first time tenant build outDetails
retail space first time tenant build out | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.