Anindya Dutta
- Listed as
- engineer
- On San Francisco permits
- Oct 2018 to Jul 2022
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 19, 2022 | Completed final sign-off Dec 2023 | 185 Berry St | Cameron Builders Inc. | remodel to ste 180 to replace the hawkeye scanner with a new starguide scanner, relocate soiled utility and biohazard rooms, convert soiled utility room to patient preparation room + mri equipment replacement in suite 190Details
remodel to ste 180 to replace the hawkeye scanner with a new starguide scanner, relocate soiled utility and biohazard rooms, convert soiled utility room to patient preparation room + mri equipment replacement in suite 190 | $500,000 |
| Aug 9, 2021 | Never finaled issued Feb 2022, no final | 185 Berry St | Cameron Builders Inc. | suite 180c: demo of int. partitions, & int. drywall layer & selected furring channels of demising partition & ext. walls, flooring & ceiling systems & unused me systems. construction of complete (n) int. ti to house 2 (n) mri, equip. rm control rm, staff break rm, & modification to mep, plumb & elecDetails
suite 180c: demo of int. partitions, & int. drywall layer & selected furring channels of demising partition & ext. walls, flooring & ceiling systems & unused me systems. construction of complete (n) int. ti to house 2 (n) mri, equip. rm control rm, staff break rm, & modification to mep, plumb & elec | $2,000,000 |
| Oct 12, 2018 | Completed final sign-off Oct 2018 | 191 Sutter St | Amone Corp | revision to approved pa #201806081370, changes to mezzanine demo. revision to s1.1 keeping wall (not demoing it)Details
revision to approved pa #201806081370, changes to mezzanine demo. revision to s1.1 keeping wall (not demoing it) |