Ingrid Stinchcomb
- License
- C44759
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C44759 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Fma Engineering
- Based in
- Overland Park
- On San Francisco permits
- Apr 2016 to Jul 2017
2 permits since 2000 (engineer on 2 permits): 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ltci Ltd
- Architects
- Mark A Gastinger
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2017 | Expired or cancelled withdrawn Nov 2025 | 1000 Van Ness Av | theater auditorium #3 interior remodel. provide nw elect. & mech. for nw project system in booth & nw speakers in the auditorium. nw projector/view port windows. nw row platforms, stair & knee walls for new recliner seating and new finishes in the audiorium. nw interior auditorium entry & signage.Details
theater auditorium #3 interior remodel. provide nw elect. & mech. for nw project system in booth & nw speakers in the auditorium. nw projector/view port windows. nw row platforms, stair & knee walls for new recliner seating and new finishes in the audiorium. nw interior auditorium entry & signage. | $580,000 | |
| Apr 18, 2016 | Never finaled issued Jul 2016, no final | 135 04th St | Ltci Ltd | suite 300 - cinema tenant interior remodel for auditorium #13 within an existing mall bldg.Details
suite 300 - cinema tenant interior remodel for auditorium #13 within an existing mall bldg. | $250,000 |