Permit GraphShortlistSan Francisco building permits since 2000

Ryan Michael Huber

License
38996
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
Firm
Henderson Engineers
Based in
Lenexa
On San Francisco permits
May 2019 to May 2019

1 permit since 2000 (engineer on 1 permit): 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
W. L. Butler Construction Inc

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 1, 2019Completed
final sign-off May 2020
789 Mission StW. L. Butler Construction Inc2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a.
Details
Permit
201905019404
Permit issued
Jun 25, 2019
Final sign-off
May 22, 2020

2/f: (e) water closet replacement and installation of vacuum waste piping system. repair/replace finishes as necessary. maher n/a.

Open the permit page

$300,000