Block 0305, lot 001
605 Post St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 6
- Units
- 35
- Rooms
- 37 bathrooms
- Building
- 19,410 sq ft
- Lot
- 3,206 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | Completed final sign-off Aug 2026 | 605 Post St | D & K Construction &Painting Company Inc | revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage.Details
revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage. | |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 605 Post St | D & K Construction &Painting Company Inc | convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operationDetails
convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operation | $35,000 |
| Dec 9, 2025 | In progress issued Mar 2026 | 555 Taylor St | Rcm Fire Protection Inc. | upgrade existing fire aalrm system one for one, add new low frequency notification devices inse all sleeping rooms & living rooms to meet the sf 75 db @ the pilow ordinace,existing elevator has only primary reclal functions.Details
upgrade existing fire aalrm system one for one, add new low frequency notification devices inse all sleeping rooms & living rooms to meet the sf 75 db @ the pilow ordinace,existing elevator has only primary reclal functions. | $60,000 |
| May 21, 2025 | Completed final sign-off Oct 2025 | 551 Taylor St | F C Company | replace front glass in kind. (front visible from street). u-factor <=0.58Details
replace front glass in kind. (front visible from street). u-factor <=0.58 | $2,000 |
| Nov 4, 2011 | Never finaled issued Nov 2011, no final | 555 Taylor St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Feb 28, 2008 | Never finaled issued Feb 2008, no final | 555 Taylor St | Bay Concrete Construction | revision to pa# 2007.12.04.9621. repair of (e) sidewalk. modification to structural details in response to exposed on-site conditionDetails
revision to pa# 2007.12.04.9621. repair of (e) sidewalk. modification to structural details in response to exposed on-site condition | |
| Dec 4, 2007 | Completed final sign-off Aug 2008 | 555 Taylor St | change to approved application 20010115205 change to second floor framing at bar change to bathroomsDetails
change to approved application 20010115205 change to second floor framing at bar change to bathrooms | $1,000 | |
| Dec 4, 2007 | Completed final sign-off Sep 2008 | 555 Taylor St | remove & replace sidewalk above basement along post st., infill existing service hatch on taylor st.Details
remove & replace sidewalk above basement along post st., infill existing service hatch on taylor st. | $50,000 | |
| Oct 11, 2007 | Completed final sign-off Aug 2008 | 555 Taylor St | reframe (e) mezzanine level and remodel bathrooms as part of the handicap improvements. no increase of mezzanine and 1st floor areas. replave entry door to be ada compliant.Details
reframe (e) mezzanine level and remodel bathrooms as part of the handicap improvements. no increase of mezzanine and 1st floor areas. replave entry door to be ada compliant. | $45,000 | |
| Aug 4, 2005 | Never finaled issued Aug 2005, no final | 555 Taylor St | renew building permit 200412131227Details
renew building permit 200412131227 | ||
| Jan 31, 2005 | Completed final sign-off Apr 2005 | 555 Taylor St | ada upgrade of entry door hardware as reqd by 20% rule for repair of ceiling on earlier permit refDetails
ada upgrade of entry door hardware as reqd by 20% rule for repair of ceiling on earlier permit ref | $9,000 | |
| Dec 13, 2004 | Expired or cancelled expired Apr 2005 | 555 Taylor St | Bryan Hodes Gen Contracto | 1 hr ceiling; emergency repair-storage rm, maintain occupancy, separation (plans under separate permDetails
1 hr ceiling; emergency repair-storage rm, maintain occupancy, separation (plans under separate perm | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D & K Construction &Painting Company Inc (2), Bay Concrete Construction, Bryan Hodes Gen Contracto, F C Company, Rcm Fire Protection Inc.
- Architects
- Francisco Matos (2), John Duffy Architect
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.