Block 0737, lot 001
1055 Ellis St
- City’s use
- Commercial Misc
- Lot
- 32,996 sq ft
- Zoning
- RM4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
50 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | Completed final sign-off Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924Details
temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924 | $10,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 1055 Ellis St | Corporate Sign Systems | install 5 evacuation maps inside building.Details
install 5 evacuation maps inside building. | $895 |
| Feb 9, 2026 | Completed final sign-off Aug 2026 | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | 3rd floor: add upright sprinklers (3). add pendent sprinklers (129). add sidewall sprinklers (12). total- 144. ref permit 2025.1001.6481Details
3rd floor: add upright sprinklers (3). add pendent sprinklers (129). add sidewall sprinklers (12). total- 144. ref permit 2025.1001.6481 | $74,160 |
| Jan 21, 2026 | In progress issued Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924.Details
revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924. | |
| Oct 24, 2025 | In progress issued Nov 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide soil shoring at (n) elevator shoring + foundation. ref pa 202312212924.Details
provide soil shoring at (n) elevator shoring + foundation. ref pa 202312212924. | |
| Oct 1, 2025 | In progress issued Jan 2026 | 1055 Ellis St | Guzman Construction Group Inc. | (n) entrance to the third floor of the la salle building and remnovation of the interior thrid floor of the la salle building to include non structural demo of interior partitions and finishes and mep systems to be replaced with new. no work in the public right of way and not facing street.Details
(n) entrance to the third floor of the la salle building and remnovation of the interior thrid floor of the la salle building to include non structural demo of interior partitions and finishes and mep systems to be replaced with new. no work in the public right of way and not facing street. | $5,000,000 |
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 1055 Ellis St | Johnson Controls Fire | provide new (2) duct smoke detectors, (2) remote test stations, and (1) speaker strobe. ref permit 202410213333Details
provide new (2) duct smoke detectors, (2) remote test stations, and (1) speaker strobe. ref permit 202410213333 | $3,500 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 1055 Ellis St | Rcm Fire Protection Inc. | to modify existing fire sprinklers to accomodate new ceiling and walls.Details
to modify existing fire sprinklers to accomodate new ceiling and walls. | $7,000 |
| Jan 17, 2025 | Completed final sign-off Feb 2025 | 1055 Ellis St | International Fire Equipment Co Incorpor | remove existing sprinklers from elevator hoistway & machine room for sffd 2022 ab #2.01 (addendum d)Details
remove existing sprinklers from elevator hoistway & machine room for sffd 2022 ab #2.01 (addendum d) | $3,000 |
| Jan 13, 2025 | Completed final sign-off Mar 2025 | 1055 Ellis St | Pyro-Comm Systems, Inc. | 9 smoke detectors, 3 relay module to be provided for elevator modernization. voluntary project.Details
9 smoke detectors, 3 relay module to be provided for elevator modernization. voluntary project. | $4,000 |
| Oct 21, 2024 | In progress issued Mar 2025 | 1055 Ellis St | Guzman Construction Group Inc. | conversion of existing classroom into training room with recovery equipment and an office.Details
conversion of existing classroom into training room with recovery equipment and an office. | $375,000 |
| Jul 11, 2024 | In progress issued Jul 2024 | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | tenant improvement to the existing fire sprinkler system. add 3 and remove 2 sprinklers. ref pa 202306150165Details
tenant improvement to the existing fire sprinkler system. add 3 and remove 2 sprinklers. ref pa 202306150165 | $1,800 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 1055 Ellis St | Young's Roofing, Inc. | reroofingDetails
reroofing | $19,415 |
| Mar 8, 2024 | In progress issued Mar 2024 | 1055 Ellis St | Pyro-Comm Systems, Inc. | 2 smoke detectors, 2 wall horn strobes to be added to provide proper coverage ref pa# 2023-0615-0165Details
2 smoke detectors, 2 wall horn strobes to be added to provide proper coverage ref pa# 2023-0615-0165 | $1,500 |
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | 1st and 2nd floors :extg fire sprinkler system t.i. add 3 pendents sprinklers on 1st floor. add 3 pendent sprinklers on 2nd floor. ref pa#202312152604Details
1st and 2nd floors :extg fire sprinkler system t.i. add 3 pendents sprinklers on 1st floor. add 3 pendent sprinklers on 2nd floor. ref pa#202312152604 | $4,000 |
| Dec 21, 2023 | In progress issued Oct 2025 | 1055 Ellis St | Guzman Construction Group Inc. | alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator.Details
alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator. | $1,600,000 |
| Dec 15, 2023 | In progress issued Jan 2024 | 1055 Ellis St | Guzman Construction Group Inc. | lobby: provide electrical, mechanical, and plumbing work for 2 new conference rooms in existing lobby space. ref ti permit 202306150165Details
lobby: provide electrical, mechanical, and plumbing work for 2 new conference rooms in existing lobby space. ref ti permit 202306150165 | $42,000 |
| Aug 24, 2023 | Never finaled issued Aug 2023, no final | 1055 Ellis St | Pyro-Comm Systems, Inc. | fire alarm as builts: as builts to show (6) added duct detectors. pa ref# 20230620932Details
fire alarm as builts: as builts to show (6) added duct detectors. pa ref# 20230620932 | |
| Jul 21, 2023 | Completed final sign-off Jul 2023 | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | 1/f: relocate 26 sprinkler heads for classrooms at sacred heartDetails
1/f: relocate 26 sprinkler heads for classrooms at sacred heart | $5,536 |
| Jul 21, 2023 | Never finaled issued Jul 2023, no final | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | ductwork modification & reroute new fsd's; ref pa# 202305318916Details
ductwork modification & reroute new fsd's; ref pa# 202305318916 | $60,000 |
| Jun 27, 2023 | Never finaled issued Jun 2023, no final | 1055 Ellis St | Pyro-Comm Systems, Inc. | 5-wall horn strobes will be provided for proper coverage, ref pa# 202305318916Details
5-wall horn strobes will be provided for proper coverage, ref pa# 202305318916 | $2,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide 2 new conference rooms in (e) lobby space.Details
provide 2 new conference rooms in (e) lobby space. | $186,000 |
| May 31, 2023 | Never finaled issued Jun 2023, no final | 1055 Ellis St | Build Group Inc. | removal of (e) offices for new classrooms. new wall and paint, salvage (e) doors, interior windows, and lighting. renovate (e) restrooms to be accessible. enlarge above to provide clear floor space at low drinking fountains. mep & lif safety under separate permits.Details
removal of (e) offices for new classrooms. new wall and paint, salvage (e) doors, interior windows, and lighting. renovate (e) restrooms to be accessible. enlarge above to provide clear floor space at low drinking fountains. mep & lif safety under separate permits. | $186,000 |
| Apr 11, 2019 | Completed final sign-off Apr 2019 | 1055 Ellis St | Potter Fire Protection | add 5 fire sprinklers under mezzanines (3) no ref paDetails
add 5 fire sprinklers under mezzanines (3) no ref pa | $2,500 |
| May 31, 2018 | Never finaled issued May 2018, no final | 1055 Ellis St | Guzman Construction Group Inc. | revision to 201705197113 which was to convert large storage room to lab space - as builts change the doors configuration in the robotics lab in room 002.Details
revision to 201705197113 which was to convert large storage room to lab space - as builts change the doors configuration in the robotics lab in room 002. | |
| May 19, 2017 | Never finaled issued Jun 2017, no final | 1055 Ellis St | Guzman Construction Group Inc. | b/f -convert large storage room to lab/classroom space, used occ load factor of 20, 2nd exit not required, but provided.Details
b/f -convert large storage room to lab/classroom space, used occ load factor of 20, 2nd exit not required, but provided. | $2,500 |
| Aug 2, 2016 | Completed final sign-off Apr 2018 | 1055 Ellis St | Pyro-Comm Systems, Inc. | existing fire alarm head end equipment to be removed and replace with new. head end equip onlyDetails
existing fire alarm head end equipment to be removed and replace with new. head end equip only | $15,000 |
| Apr 1, 2016 | Completed final sign-off Jul 2016 | 1055 Ellis St | Westates Mechanical Corporation Inc | 2nd flr: remove 30 sidewalls & pendent heads. install 24 new pendents heads in class rooms 205, 206 & 207. ref pa 2016-0323-2825Details
2nd flr: remove 30 sidewalls & pendent heads. install 24 new pendents heads in class rooms 205, 206 & 207. ref pa 2016-0323-2825 | $12,360 |
| Mar 23, 2016 | Completed final sign-off Aug 2016 | 1055 Ellis St | Guzman Construction Group Inc. | 2nd flr: remodel of existing classrooms; replace flooring, ceiling, repaint, replace cabinets, replace lights, replace electrical, replace sinks.Details
2nd flr: remodel of existing classrooms; replace flooring, ceiling, repaint, replace cabinets, replace lights, replace electrical, replace sinks. | $600,000 |
| May 29, 2015 | Completed final sign-off Aug 2015 | 1055 Ellis St | Westates Mechanical Corporation Inc | 2nd flr: remove sidewall and install 32 pendents. ref pa 2015 0330 2158Details
2nd flr: remove sidewall and install 32 pendents. ref pa 2015 0330 2158 | $16,448 |
| Mar 30, 2015 | Completed final sign-off Aug 2015 | 1055 Ellis St | Cahill Contractors Inc | remodel of four laboratory classrooms at level 2.Details
remodel of four laboratory classrooms at level 2. | $530,000 |
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 1055 Ellis St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system replace 16 sprinklers on second floor- removing class ii standpipe on second floor.Details
existing fire sprinkler system replace 16 sprinklers on second floor- removing class ii standpipe on second floor. | $8,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 1055 Ellis St | street space & mta permitDetails
street space & mta permit | ||
| May 21, 2014 | Completed final sign-off Aug 2014 | 1055 Ellis St | Cahill Contractors Inc | t.i. of 3 extg classrooms in extg bldg located on 2nd floor include remodeling of 3 classrooms into 2.Details
t.i. of 3 extg classrooms in extg bldg located on 2nd floor include remodeling of 3 classrooms into 2. | $280,000 |
| Jan 10, 2014 | Never finaled issued Jan 2014, no final | 1055 Ellis St | Johnson Controls Security Solutions Llc | like for like dialer install for facp monitoring fire alarm. trouble and supervisory exchange old for new dialer unimode 5Details
like for like dialer install for facp monitoring fire alarm. trouble and supervisory exchange old for new dialer unimode 5 | $2,600 |
| Apr 25, 2013 | Completed final sign-off Aug 2013 | 1055 Ellis St | Cahill Contractors Inc | remodel of 4 classrooms into 3 classrooms. new partitions, ceiling, flooring, lights and raditors.Details
remodel of 4 classrooms into 3 classrooms. new partitions, ceiling, flooring, lights and raditors. | $245,000 |
| Jan 8, 2008 | Completed final sign-off May 2008 | 1055 Ellis St | Stripe Inc. Dba Garnett Sign Studio | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | |
| May 17, 2007 | Never finaled issued May 2007, no final | 1055 Ellis St | replace (e) exterior windows: to be aluminum, matching operation og (e); (e) wood trim at exterior to remain; new window frames to color finish with insulated glass. no structural work.Details
replace (e) exterior windows: to be aluminum, matching operation og (e); (e) wood trim at exterior to remain; new window frames to color finish with insulated glass. no structural work. | $115,000 | |
| Jul 21, 2006 | Completed final sign-off Dec 2006 | 1055 Ellis St | Cahill Contractors Inc | install duct work @ fitness area for treat and ventilation, add exhaust at locker rooms. 1/f, 2/fDetails
install duct work @ fitness area for treat and ventilation, add exhaust at locker rooms. 1/f, 2/f | $61,000 |
| Jul 18, 2006 | Completed final sign-off Dec 2006 | 1055 Ellis St | Simplex Grinnell | 1st floor - a f/a t.i. adding hte following. 1 nac panel, 2 10-amp h battery, 1 duct detector, 2 relay 1am, 2 relays, 9 spkr strobe multi-cd, 8 strobe multi-cd.Details
1st floor - a f/a t.i. adding hte following. 1 nac panel, 2 10-amp h battery, 1 duct detector, 2 relay 1am, 2 relays, 9 spkr strobe multi-cd, 8 strobe multi-cd. | $9,558 |
| Jul 6, 2006 | Completed final sign-off Dec 2006 | 1055 Ellis St | Vintage Fire Protection | add 79 new fire sprinklers - fitness centerDetails
add 79 new fire sprinklers - fitness center | $15,800 |
| Mar 7, 2006 | Completed final sign-off Dec 2006 | 1055 Ellis St | Cahill Contractors Inc | partial interior renovation of an existing buiding to include on the 1/fl, a new fitness area, reovation to existing girls locker room w/new ada compliant restroom,shower stall,renovation to 2/fl to include boys locker room with new ada compliant restroom & shower stall.no structural work.Details
partial interior renovation of an existing buiding to include on the 1/fl, a new fitness area, reovation to existing girls locker room w/new ada compliant restroom,shower stall,renovation to 2/fl to include boys locker room with new ada compliant restroom & shower stall.no structural work. | $420,000 |
| Jun 5, 2003 | Completed final sign-off Jun 2004 | 1055 Ellis St | Cahill Contractors Inc | respones to uncovered field conditions under appl#200112175385 with in-kind work, replace 2 (e)cmuDetails
respones to uncovered field conditions under appl#200112175385 with in-kind work, replace 2 (e)cmu | |
| Jan 14, 2003 | Completed final sign-off Jun 2004 | 1055 Ellis St | Cahill Contractors Inc | conversion of kitchen prep space into boys' & girls' toilet rms (ref.200112175385) new partitions,Details
conversion of kitchen prep space into boys' & girls' toilet rms (ref.200112175385) new partitions, | $180,000 |
| Jan 14, 2003 | Completed final sign-off Jun 2004 | 1055 Ellis St | Rosendin Electric, Inc. | new fire alarm systemDetails
new fire alarm system | $96,000 |
| Nov 25, 2002 | Never finaled issued Nov 2002, no final | 1055 Ellis St | street spaceDetails
street space | ||
| Sep 23, 2002 | Completed final sign-off Jun 2004 | 1055 Ellis St | Superior Automatic Sprinkler | fire sprinkler system work:(387) heads. new gymnasium/cafeteria bldg & existing gymnasium/cfeteria bDetails
fire sprinkler system work:(387) heads. new gymnasium/cafeteria bldg & existing gymnasium/cfeteria b | $90,000 |
| May 22, 2002 | Completed final sign-off Nov 2004 | 1055 Ellis St | Cahill Contractors Inc | rev. appl#200112175385 temp. shoringDetails
rev. appl#200112175385 temp. shoring | $20,000 |
| May 1, 2002 | Completed final sign-off Jul 2002 | 1055 Ellis St | partial bldg. demo see pa 200112175385 for new bldg.Details
partial bldg. demo see pa 200112175385 for new bldg. | $150,000 | |
| Dec 17, 2001 | Completed final sign-off Nov 2004 | 1055 Ellis St | Cahill Contractors Inc | to erect 2 story new bldg with 0 dwelling unit, insitutional/gym, cafeteria, educ. bldng)Details
to erect 2 story new bldg with 0 dwelling unit, insitutional/gym, cafeteria, educ. bldng) | $10,540,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Guzman Construction Group Inc. (11), Cahill Contractors Inc (9), Anderson, Rowe & Buckley, Inc. (6), Pyro-Comm Systems, Inc. (5), Westates Mechanical Corporation Inc (2), Build Group Inc., Corporate Sign Systems, International Fire Equipment Co Incorpor, Johnson Controls Fire, Johnson Controls Security Solutions Llc, Potter Fire Protection, Rcm Fire Protection Inc., Rosendin Electric, Inc., Simplex Grinnell, Stripe Inc. Dba Garnett Sign Studio, Superior Automatic Sprinkler, Vintage Fire Protection, Young's Roofing, Inc.
- Architects
- Jeffrey Evans (3), Case Abst Architects Case Abst Architects Llp (2), Daniel Wetherell, Kami Kinkaid, Mike Narouzi
- Engineers
- Stephen R De Jesse (2), Alan Robinson, Alexander Joseph Pacheco, Brian Thomas Chuck, Brian Thomas Turner, Christopher Jackson, Marc Alan Woodman, Rodolfo Bustos
- Authorized agent-otherss
- Zachary Tang (2), Mardeen Gordon
- Designers
- Johnson Controls Fire, Michael Joseph Donahue, Rcm Fire Protection Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.