Jeffrey Evans
- License
- C32430
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hkit Architects
- Based in
- Oakland
- On San Francisco permits
- Jun 2023 to Jul 2026
5 permits since 2000 (architect on 5 permits): 4 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Guzman Construction Group Inc. (5)
- Engineers
- Stephen R De Jesse (2), Christopher Jordan Malabed
- Authorized agents
- Zachary Tang (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 5
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | Completed final sign-off Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924Details
temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924 | $10,000 |
| May 27, 2026 | Completed final sign-off Oct 2026 | 1100 Ellis St | Guzman Construction Group Inc. | 1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain.Details
1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain. | $100,000 |
| Apr 17, 2026 | Completed final sign-off Oct 2026 | 1100 Ellis St | Guzman Construction Group Inc. | 1/fl-reconfiguration of (e) admin offices and classroom. a unisex restroom will be made accessibleDetails
1/fl-reconfiguration of (e) admin offices and classroom. a unisex restroom will be made accessible | $340,536 |
| Dec 21, 2023 | In progress issued Oct 2025 | 1055 Ellis St | Guzman Construction Group Inc. | alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator.Details
alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator. | $1,600,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide 2 new conference rooms in (e) lobby space.Details
provide 2 new conference rooms in (e) lobby space. | $186,000 |