Block 7380, lot 010
50 Thomas More Way
- City’s use
- Commercial Misc
- Built
- 1954
- Stories
- 2
- Rooms
- 1 bathroom
- Lot
- 75,001 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2025 | Completed final sign-off Jun 2025 | 50 Thomas More Wy | Beam Construction Enterprises Inc | installation of two bioretention facilities. no change to site grading. work funded by sfpuc green infrastructure program. plumbing inspection division review only for changes to exterior storm drain pipingDetails
installation of two bioretention facilities. no change to site grading. work funded by sfpuc green infrastructure program. plumbing inspection division review only for changes to exterior storm drain piping | $750,000 |
| Jul 25, 2022 | Completed final sign-off Jul 2023 | 50 Thomas More Wy | Rcm Fire Protection Inc. | add 3 sprinkler heads due to new ceiling and wallDetails
add 3 sprinkler heads due to new ceiling and wall | $3,000 |
| Jul 16, 2020 | Completed final sign-off Jul 2023 | 50 Thomas More Wy | installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework.Details
installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework. | $150,000 | |
| Jun 7, 2019 | Completed final sign-off Aug 2019 | 50 Thomas More Wy | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $80,500 |
| May 7, 2019 | Never finaled issued Jun 2019, no final | 50 Thomas More Wy | Build Group Inc. | voluntary structural upgradeDetails
voluntary structural upgrade | $400,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 50 Thomas More Wy | Red Hawk Fire & Security Ca Llc | emergency fire aarm panel replacement. revise all existing circuits.Details
emergency fire aarm panel replacement. revise all existing circuits. | $1,000 |
| Dec 19, 2016 | Completed final sign-off Mar 2017 | 50 Thomas More Wy | Red Hawk Fire & Security Ca Llc | 1/f & mezz: fire alarm t.i: add 7 horn/strobes, 1 smoke detector above power supply, 1 new power supply & modules. ref t.i. pa#201603162255.Details
1/f & mezz: fire alarm t.i: add 7 horn/strobes, 1 smoke detector above power supply, 1 new power supply & modules. ref t.i. pa#201603162255. | $6,000 |
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam.Details
revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam. | |
| Sep 19, 2016 | Never finaled issued Sep 2016, no final | 50 Thomas More Wy | R L H Fire Protection Inc | fire sprinkler t.i. ref app#201603162255. 19 relocated and 21 adds sprinklers.Details
fire sprinkler t.i. ref app#201603162255. 19 relocated and 21 adds sprinklers. | $20,689 |
| Mar 16, 2016 | Never finaled issued Jun 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit.Details
build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit. | $200,000 |
| Mar 9, 2016 | Expired or cancelled cancelled Jan 2026 | 2 Thomas More Wy | build a stage for performing arts inside () gym space. storage will be accomodated next to stage and at a 2nd flr storage space. the use and program was previously approved in ref pa 200501274167.Details
build a stage for performing arts inside () gym space. storage will be accomodated next to stage and at a 2nd flr storage space. the use and program was previously approved in ref pa 200501274167. | $200,000 | |
| Mar 31, 2011 | Never finaled issued Mar 2011, no final | 2 Thomas More Wy | Diversified Fire Products | fire alarm system - add 1 monitor moduleDetails
fire alarm system - add 1 monitor module | $2,000 |
| Oct 8, 2010 | Never finaled issued Oct 2010, no final | 2 Thomas More Wy | International Fire Equip | installation of ul 300 fire stystem into existing kitchenDetails
installation of ul 300 fire stystem into existing kitchen | $3,000 |
| Jan 16, 2008 | Completed final sign-off May 2008 | 2 Thomas More Wy | Nibbi Bros Assoc Inc. | revision to pa# 2005/01/27/4169/s2 to change proposed 4" underground water supply line connecting the city water main to the riser location to 6"Details
revision to pa# 2005/01/27/4169/s2 to change proposed 4" underground water supply line connecting the city water main to the riser location to 6" | $3,500 |
| Dec 4, 2007 | Completed final sign-off May 2008 | 2 Thomas More Wy | Diversified Fire Products | new fire alarm system : 1- facp, 2 syncmods, 5 relays, 1 i/o mod, 17 pulls, 2 power supplies, 9 sds, 1 dd, 1 hd, 37 horn/strobe, 5 strobes, 5 door holders.Details
new fire alarm system : 1- facp, 2 syncmods, 5 relays, 1 i/o mod, 17 pulls, 2 power supplies, 9 sds, 1 dd, 1 hd, 37 horn/strobe, 5 strobes, 5 door holders. | $26,740 |
| Oct 25, 2002 | Completed final sign-off Dec 2003 | 2 Thomas More Wy | Ncci Inc | revision to 2002/02/01/8273.Details
revision to 2002/02/01/8273. | $10,000 |
| Jun 29, 2000 | Completed final sign-off Oct 2000 | 2 Thomas More Wy | Cahill Contractors Inc | widen extg curb cut and gates at extg driveway/modify extg fencingDetails
widen extg curb cut and gates at extg driveway/modify extg fencing | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bach Construction, Inc. (2), Diversified Fire Products (2), Red Hawk Fire & Security Ca Llc (2), Beam Construction Enterprises Inc, Build Group Inc., Cahill Contractors Inc, International Fire Equip, Ncci Inc, Nibbi Bros Assoc Inc., R L H Fire Protection Inc, Rcm Fire Protection Inc., The Lawson Roofing Co Inc.
- Architects
- Paki Kasle-Muthig (2), Robert S. Connelly, Steve Connelly
- Engineers
- Mehdi Karimi (2), Matthew Frantz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.