Block 0310, lot 021
135 Post St
- City’s use
- Commercial Retail
- Built
- 1908
- Stories
- 6
- Rooms
- 11 bathrooms
- Building
- 66,964 sq ft
- Lot
- 12,249 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 135 Post St | 5/f: install 3 framery pods to (e) office space. no alterations to layout or change of use.Details
5/f: install 3 framery pods to (e) office space. no alterations to layout or change of use. | $5,000 | |
| Nov 17, 2021 | Completed final sign-off Oct 2022 | 135 Post St | change of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgradeDetails
change of use: land use designation from retail to office on 3/f, 4/f, 5/f, 6/f pursuant to pc motions 20927 & 20928. no occupancy under this permit. no work propsed, all life safety, egress and ada review under future t.i. no cfc for this permit until future ti is issued. subject to seimic upgrade | ||
| Jan 26, 2021 | Completed final sign-off May 2021 | 34 Maiden Ln | True North Signs & Graphic Services | install (3) evacuation signs. interior signs.Details
install (3) evacuation signs. interior signs. | $1,125 |
| Dec 10, 2020 | Completed final sign-off Feb 2021 | 34 Maiden Ln | Pioneer Fire Inc. | relocate (10) uprights, relocate (66) concealers, add (3) concealers, remove (6) pendents.Details
relocate (10) uprights, relocate (66) concealers, add (3) concealers, remove (6) pendents. | $42,500 |
| Nov 4, 2020 | Never finaled issued Dec 2020, no final | 135 Post St | Everon Llc | bldg # 2020-0901-3195 3rd floor: (17) ceiling mount horn/strobes, (13) ceiling mount strobes, (1) new control relay for a/v shutdown, (1) new optical smoke detectorDetails
bldg # 2020-0901-3195 3rd floor: (17) ceiling mount horn/strobes, (13) ceiling mount strobes, (1) new control relay for a/v shutdown, (1) new optical smoke detector | $16,000 |
| Nov 4, 2020 | Never finaled issued Feb 2021, no final | 135 Post St | Everon Llc | bldg #2020-0901-3199. 4th fl: (17) ceiling mount horn/strobes, (18) ceiling mount strobes, (1) new control relay for a/vshutdown, (1) new optical smoke detector.Details
bldg #2020-0901-3199. 4th fl: (17) ceiling mount horn/strobes, (18) ceiling mount strobes, (1) new control relay for a/vshutdown, (1) new optical smoke detector. | $15,000 |
| Oct 27, 2020 | Completed final sign-off Mar 2021 | 34 Maiden Ln | Eco Fire Sprinklers Inc | relocate (10) and add (3) pendent sprinklers in area of work for tenant improvement.Details
relocate (10) and add (3) pendent sprinklers in area of work for tenant improvement. | $6,000 |
| Oct 22, 2020 | Completed final sign-off Dec 2020 | 135 Post St | Everon Llc | bldg #2020-0107-1334. 3rd floor restroom: (2) new ceiling horn/strobes. 4th floor restroom: (2) new ceiling horn/strobes.Details
bldg #2020-0107-1334. 3rd floor restroom: (2) new ceiling horn/strobes. 4th floor restroom: (2) new ceiling horn/strobes. | $10,000 |
| Oct 10, 2020 | Expired or cancelled cancelled Jan 2026 | 135 Post St | demo or removal of 1st floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017Details
demo or removal of 1st floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017 | $130,000 | |
| Oct 10, 2020 | Expired or cancelled cancelled Jan 2026 | 135 Post St | demo or removal of 2nd floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017Details
demo or removal of 2nd floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017 | $130,000 | |
| Oct 10, 2020 | Expired or cancelled cancelled Jan 2026 | 135 Post St | demo of existing dumb waiter and existing grand stairs floors 1 & 2. strutural infill of atrium and dumb waiter shaft. no changes to storefront or basement.Details
demo of existing dumb waiter and existing grand stairs floors 1 & 2. strutural infill of atrium and dumb waiter shaft. no changes to storefront or basement. | $145,000 | |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 135 Post St | Red Hawk Fire & Security Ca Llc | 1st fl lobby: (2) new wall horn/strobes replace (1) existing wall horn/strobes with new replace (1) pull station with new, replace (2) existing smoke detectors with new. ref #202001313265Details
1st fl lobby: (2) new wall horn/strobes replace (1) existing wall horn/strobes with new replace (1) pull station with new, replace (2) existing smoke detectors with new. ref #202001313265 | $8,000 |
| Sep 1, 2020 | Expired or cancelled cancelled Jan 2026 | 34 Maiden Ln | Novo Construction Inc | 4th flr. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep.Details
4th flr. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep. | $772,540 |
| Sep 1, 2020 | Expired or cancelled cancelled Jan 2026 | 34 Maiden Ln | Novo Construction Inc | 3rd flr. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep.Details
3rd flr. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep. | $772,540 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 34 Maiden Ln | True North Signs & Graphic Services | 2 evvac plaques for lobby, remodel onlyDetails
2 evvac plaques for lobby, remodel only | $680 |
| Aug 3, 2020 | Never finaled filed Aug 2020, never issued | 34 Maiden Ln | street space | ||
| Jun 22, 2020 | Never finaled issued Jul 2020, no final | 135 Post St | street spaceDetails
street space | ||
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 34 Maiden Ln | Eco Fire Sprinklers Inc | install 12 pendent sprinklers in area of work for tenant improvement 201902193287. maher n/aDetails
install 12 pendent sprinklers in area of work for tenant improvement 201902193287. maher n/a | $600 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 135 Post St | street spaceDetails
street space | ||
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 34 Maiden Ln | demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a **Details
demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a ** | $100,000 | |
| Jan 31, 2020 | Completed final sign-off May 2021 | 34 Maiden Ln | C C I Commercial Construction & Improv | 1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maherDetails
1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maher | $80,000 |
| Jan 7, 2020 | Never finaled issued Mar 2020, no final | 34 Maiden Ln | C C I Commercial Construction & Improv | demo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kindDetails
demo and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kind | $60,000 |
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 135 Post St | Red Hawk Fire & Security Ca Llc | demo of (e) devices on 3rd & 4th fls. 3rd fl. demo 15 notification devices, 1 smoke det. 4th fl: demo 12 notification devices, 3 smoke det.Details
demo of (e) devices on 3rd & 4th fls. 3rd fl. demo 15 notification devices, 1 smoke det. 4th fl: demo 12 notification devices, 3 smoke det. | $15,000 |
| Feb 20, 2019 | Completed final sign-off Jul 2021 | 34 Maiden Ln | C C I Commercial Construction & Improv | 3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per planDetails
3rd flr. prepare space for tenant improvement work. remove interior partition walls, ceiling heights, soffits and wall cladding. remove (e) mechanical equipment, hvac shaft, plumbing to riser shaft and cap all unused lines. install lighting per plan. patch polish and seal concrete floor per plan | $60,000 |
| Feb 19, 2019 | Completed final sign-off Jul 2021 | 34 Maiden Ln | C C I Commercial Construction & Improv | prepare space for t.i. work. remove interior partition walls, ceiling lights, sofitts and wall cladding. remove extg mechanical equipment. hvac shaft, plmg to riser shaft and capp all unsued lines. install lghtg per plan, patch, polish and seal concrete floor per plan. n/a for maherDetails
prepare space for t.i. work. remove interior partition walls, ceiling lights, sofitts and wall cladding. remove extg mechanical equipment. hvac shaft, plmg to riser shaft and capp all unsued lines. install lghtg per plan, patch, polish and seal concrete floor per plan. n/a for maher | $60,000 |
| Aug 16, 2018 | Completed final sign-off Apr 2019 | 135 Post St | Emcor Services/Mesa Energy Systems Inc | rooftop: a/c unit replacements, like for like, in-kind (2xa/c + 2 condensors). maher n/a.Details
rooftop: a/c unit replacements, like for like, in-kind (2xa/c + 2 condensors). maher n/a. | $35,000 |
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 135 Post St | Red Hawk Fire & Security Ca Llc | replace existing fire alarm control panel and remote led annunciator. n/a for maher.Details
replace existing fire alarm control panel and remote led annunciator. n/a for maher. | $60 |
| Jul 6, 2015 | Completed final sign-off Aug 2016 | 135 Post St | Red Hawk Fire & Security Ca Llc | replacing extg fire alarm panel and remote led annunciator, emergency panel. n/a for maherDetails
replacing extg fire alarm panel and remote led annunciator, emergency panel. n/a for maher | $4,500 |
| Feb 26, 2015 | Completed final sign-off May 2015 | 135 Post St | Red Hawk Fire & Security Ca Llc | add 1 smoke detector, 1 monitoring module, 1 relay, interfacing fire with access system. t.i. pa#201501095366. n/a ordinance #155-13Details
add 1 smoke detector, 1 monitoring module, 1 relay, interfacing fire with access system. t.i. pa#201501095366. n/a ordinance #155-13 | $5,500 |
| Feb 17, 2015 | Completed final sign-off Jul 2015 | 135 Post St | J A N Environmental Construction | suite #600:relocate bathroom doors. n/a for the maherDetails
suite #600:relocate bathroom doors. n/a for the maher | $2,000 |
| Jan 9, 2015 | Completed final sign-off Jul 2015 | 135 Post St | J A N Environmental Construction | install new 6'-0" double door with fail safe at 6th floor elevator lobby.in compliance with sfbc section 1008.1.4.6. approval of locks on elevator lobby doors check list. n/a maher ordinanceDetails
install new 6'-0" double door with fail safe at 6th floor elevator lobby.in compliance with sfbc section 1008.1.4.6. approval of locks on elevator lobby doors check list. n/a maher ordinance | $2,000 |
| Sep 26, 2014 | Completed final sign-off Oct 2014 | 135 Post St | Potter Fire Protection | re-locate (2) existing fire sprinklers. reference appl.# 2014-08-15-3970; maher n/aDetails
re-locate (2) existing fire sprinklers. reference appl.# 2014-08-15-3970; maher n/a | $1,050 |
| Aug 15, 2014 | Completed final sign-off Nov 2014 | 135 Post St | San Francisco Commercial Builders Inc | demolition of one interior non-load bearing partition. construction of one non-load bearing wall, new lighting and switches, new finish millwork. n/a for maher.Details
demolition of one interior non-load bearing partition. construction of one non-load bearing wall, new lighting and switches, new finish millwork. n/a for maher. | $6,000 |
| Nov 26, 2012 | Completed final sign-off Dec 2012 | 135 Post St | Aquamatic Fire Protection | add 2 extended coverage pendent sprinklers for new ceiling height walls. relocate 2 exhisting extended coverage pendant sprinklers for new ceiling height walls. ref 201211194492Details
add 2 extended coverage pendent sprinklers for new ceiling height walls. relocate 2 exhisting extended coverage pendant sprinklers for new ceiling height walls. ref 201211194492 | $4,600 |
| Nov 26, 2012 | Completed final sign-off Jan 2013 | 135 Post St | Fire Detection Unlimited | 6th floor:modify fire alarm system for t.i. add 10 horn/stobe.4 strobes,total 14/ t.i. #201211194492 1 new power supply.Details
6th floor:modify fire alarm system for t.i. add 10 horn/stobe.4 strobes,total 14/ t.i. #201211194492 1 new power supply. | $6,000 |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 135 Post St | Doyle Construction Inc. | demolition & construction of non load bearing partitions, relocation of plumbing, millwork, light fixtures, new finishes. elec, plumbing & life safety separate permit.Details
demolition & construction of non load bearing partitions, relocation of plumbing, millwork, light fixtures, new finishes. elec, plumbing & life safety separate permit. | $256,000 |
| Jun 8, 2012 | Completed final sign-off Aug 2012 | 135 Post St | Red Hawk Fire & Security Ca Llc | 1st floor-add 3 strobes & relocate 1 horn/strobeDetails
1st floor-add 3 strobes & relocate 1 horn/strobe | $5,000 |
| May 30, 2012 | Completed final sign-off Jun 2012 | 135 Post St | Potter Fire Protection | relocate 3 fire sprinklers for new and ceiling construction.Details
relocate 3 fire sprinklers for new and ceiling construction. | $1,500 |
| May 18, 2012 | Completed final sign-off Aug 2012 | 135 Post St | San Francisco Commercial Builders Inc | relocation of existing hvac registers. reference building application #2012-0424-8955.Details
relocation of existing hvac registers. reference building application #2012-0424-8955. | $1,500 |
| Apr 24, 2012 | Completed final sign-off Aug 2012 | 135 Post St | San Francisco Commercial Builders Inc | int remodel of (e) retail space "gumps" for use as 3 unisex fitting rooms ( 1 of 3 rooms to meet handicap accessible reqs) includ 4 new walls (non-strtuc, non-bearing), new doors, lighting at each fitting rm, relocation of (e) hvac registers as necessary & req'd. removal of 2 doors,counter/casework.Details
int remodel of (e) retail space "gumps" for use as 3 unisex fitting rooms ( 1 of 3 rooms to meet handicap accessible reqs) includ 4 new walls (non-strtuc, non-bearing), new doors, lighting at each fitting rm, relocation of (e) hvac registers as necessary & req'd. removal of 2 doors,counter/casework. | $30,000 |
| Aug 10, 2011 | Never finaled issued Aug 2011, no final | 135 Post St | street spaceDetails
street space | ||
| Mar 31, 2011 | Never finaled issued Mar 2011, no final | 135 Post St | Diversified Fire Products | fire alarm system - 4 horn/strobes, 1 strobeDetails
fire alarm system - 4 horn/strobes, 1 strobe | $3,000 |
| Feb 10, 2011 | Never finaled issued Feb 2011, no final | 135 Post St | Premier Structures Inc | #550- renovation of 5th floor space. 2 partitions added, front entry door relocated, lighting for rcp shown. no work to elevators & stairs.Details
#550- renovation of 5th floor space. 2 partitions added, front entry door relocated, lighting for rcp shown. no work to elevators & stairs. | $65,000 |
| Mar 16, 2006 | Completed final sign-off Apr 2006 | 135 Post St | Bcci Construction Company | divide 2 existing offices in half to creat 4 offices & install counter top.Details
divide 2 existing offices in half to creat 4 offices & install counter top. | $16,000 |
| Apr 17, 2003 | Completed final sign-off Feb 2004 | 135 Post St | selective demolition of jewelry counter & expansion of jewelry counter.Details
selective demolition of jewelry counter & expansion of jewelry counter. | $135,000 | |
| Apr 13, 2001 | Expired or cancelled expired Aug 2001 | 34 Maiden Ln | street space permitDetails
street space permit | ||
| Aug 15, 2000 | Expired or cancelled expired Dec 2000 | 135 Post St | street spaceDetails
street space | ||
| Jul 27, 2000 | Expired or cancelled expired Nov 2000 | 34 Maiden Ln | street space useDetails
street space use | ||
| May 17, 2000 | Expired or cancelled expired Sep 2000 | 135 Post St | revision to pa#20000114155Details
revision to pa#20000114155 | ||
| Feb 10, 2000 | Expired or cancelled expired Jun 2000 | 135 Post St | oti-2 sp 3/fDetails
oti-2 sp 3/f | $2,200 | |
| Jan 14, 2000 | Expired or cancelled expired Jan 2001 | 135 Post St | oti:2 : el, ls, sp 3rd flDetails
oti:2 : el, ls, sp 3rd fl | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Red Hawk Fire & Security Ca Llc (6), C C I Commercial Construction & Improv (4), Everon Llc (3), San Francisco Commercial Builders Inc (3), Eco Fire Sprinklers Inc (2), J A N Environmental Construction (2), Novo Construction Inc (2), Potter Fire Protection (2), True North Signs & Graphic Services (2), Aquamatic Fire Protection, Bcci Construction Company, Diversified Fire Products, Doyle Construction Inc., Emcor Services/Mesa Energy Systems Inc, Fire Detection Unlimited, Pioneer Fire Inc., Premier Structures Inc
- Architects
- Wz Architecture (5), Pa Pui Iris Chan (2), Tony Pantaleoni (2), Karim Kaher Hammad
- Engineers
- Dorel Anghel
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.