J A N Environmental Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Feb 2020
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2020 | Completed final sign-off May 2020 | 1380 Greenwich St | unit #211 - f&i twelve (12) new can lights, repair bathtub drain, install new bathroom flooring. repair in-kind. no structural work.Details
unit #211 - f&i twelve (12) new can lights, repair bathtub drain, install new bathroom flooring. repair in-kind. no structural work. | $7,500 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 1574 Innes Av | revision to pa # 2018-0615-2046. relocate stacked washer/dryer from existing laundry to entry hall. cap off existing laundry connections for plumbing and electrical. run new dryer duct to rear yard.Details
revision to pa # 2018-0615-2046. relocate stacked washer/dryer from existing laundry to entry hall. cap off existing laundry connections for plumbing and electrical. run new dryer duct to rear yard. | $2,000 |
| Jun 25, 2018 | Completed final sign-off Apr 2019 | 1574 Innes Av | revision to 201806152046 to add additional work wall at property line at stairway area to be replace and upgrade to 1 hr construction. also, clarify that pa 201806152046 is to comply with nov 201482021Details
revision to 201806152046 to add additional work wall at property line at stairway area to be replace and upgrade to 1 hr construction. also, clarify that pa 201806152046 is to comply with nov 201482021 | $2,000 |
| Jun 15, 2018 | Completed final sign-off Apr 2019 | 1574 Innes Av | enclose interior open stairway/remove kitchen window. app new wall and entry door. 3'1" behind grill door. resolve violation for unpermitted kitchen and bath remodel and rear windows. replace 4 windows at rear, remodel kitchen & one bath roomDetails
enclose interior open stairway/remove kitchen window. app new wall and entry door. 3'1" behind grill door. resolve violation for unpermitted kitchen and bath remodel and rear windows. replace 4 windows at rear, remodel kitchen & one bath room | $50,000 |
| Apr 30, 2018 | Completed final sign-off Jun 2018 | 4 Norwich St | repair and replace less than 50% of (e) wood deck.Details
repair and replace less than 50% of (e) wood deck. | $20,000 |
| May 1, 2017 | Completed final sign-off Oct 2017 | 469 South Van Ness Av | dry rot repair to south and east exterior walls. not visible from street common areaDetails
dry rot repair to south and east exterior walls. not visible from street common area | $18,000 |
| Apr 5, 2017 | Completed final sign-off Oct 2017 | 469 South Van Ness Av | demo wood siding on 2 sides of bldg & install in-kind horizontal wood siding at exposed wall. not visible from street. n/a maherDetails
demo wood siding on 2 sides of bldg & install in-kind horizontal wood siding at exposed wall. not visible from street. n/a maher | $48,000 |
| Feb 16, 2017 | Never finaled issued Feb 2017, no final | 3157 Steiner St | roof repair less than 50%Details
roof repair less than 50% | $2,000 |
| Feb 10, 2017 | Expired or cancelled disapproved Nov 2018 | 3157 Steiner St | this project consists of a 505 sf vertical addition to create a (n) 3rd floormezzanine, work to include the creation of (n) roof decks and (n) stair to roof.Details
this project consists of a 505 sf vertical addition to create a (n) 3rd floormezzanine, work to include the creation of (n) roof decks and (n) stair to roof. | $160,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 394 Pacific Av | construct new ada shower room and upgrade extg non-conforming sink in women's bathroom t0 ada compliant sink, all work on 5th floor only. n/a for maherDetails
construct new ada shower room and upgrade extg non-conforming sink in women's bathroom t0 ada compliant sink, all work on 5th floor only. n/a for maher | $10,000 |
| Dec 18, 2015 | Completed final sign-off Feb 2017 | 814 Montgomery St | revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add (n) skylight. n/a for maher ordinance 155-13.Details
revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add (n) skylight. n/a for maher ordinance 155-13. | |
| Dec 8, 2015 | Completed final sign-off Mar 2017 | 814 Montgomery St | new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinanceDetails
new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinance | $300,000 |
| Sep 22, 2015 | Never finaled issued Sep 2015, no final | 814 Montgomery St | selective demo - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher naDetails
selective demo - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher na | $10,000 |
| Jul 30, 2015 | Completed final sign-off Oct 2018 | 225 Valencia St | comply with planning violation 2015008952enf. replacement of existing storefront and transom windows. paint existing tiles and doors. replace exterior lights. maher not reqDetails
comply with planning violation 2015008952enf. replacement of existing storefront and transom windows. paint existing tiles and doors. replace exterior lights. maher not req | $10,000 |
| Jul 10, 2015 | Completed final sign-off Aug 2015 | 3243 Pierce St | level (e) brick bench with new brick and replace wood in-kind. replace casework behind bar - patch and repair gyp ceiling.Details
level (e) brick bench with new brick and replace wood in-kind. replace casework behind bar - patch and repair gyp ceiling. | $50,000 |
| Jun 8, 2015 | Expired or cancelled withdrawn Jul 2015 | 225 Valencia St | exterior patch & repair of facade; replacement of tile in-kind; maher n/aDetails
exterior patch & repair of facade; replacement of tile in-kind; maher n/a | $5,000 |
| May 27, 2015 | Never finaled issued Jun 2015, no final | 225 Valencia St | new ada shower in extg ada bathrooms on 1st and 2nd floor. n/a for the maher.Details
new ada shower in extg ada bathrooms on 1st and 2nd floor. n/a for the maher. | $20,000 |
| Apr 23, 2015 | Completed final sign-off Dec 2015 | 1539 Mckinnon Av | renovate 2nd floor. new kitchen, bathrooms, electrical, plmg, windows and skylights. remove wall between kitchen, living room and dining room. install support beam and required footings and supports. demo lathe and plaster. install insulation and new sheet rock.Details
renovate 2nd floor. new kitchen, bathrooms, electrical, plmg, windows and skylights. remove wall between kitchen, living room and dining room. install support beam and required footings and supports. demo lathe and plaster. install insulation and new sheet rock. | $180,000 |
| Apr 15, 2015 | Completed final sign-off Jun 2015 | 225 Valencia St | t.i. subdivide 1st floor into 3 spaces. new private offices on 1st and 2nd floor. n/a for the maherDetails
t.i. subdivide 1st floor into 3 spaces. new private offices on 1st and 2nd floor. n/a for the maher | $20,000 |
| Feb 17, 2015 | Completed final sign-off Jul 2015 | 135 Post St | suite #600:relocate bathroom doors. n/a for the maherDetails
suite #600:relocate bathroom doors. n/a for the maher | $2,000 |
| Jan 9, 2015 | Completed final sign-off Jul 2015 | 135 Post St | install new 6'-0" double door with fail safe at 6th floor elevator lobby.in compliance with sfbc section 1008.1.4.6. approval of locks on elevator lobby doors check list. n/a maher ordinanceDetails
install new 6'-0" double door with fail safe at 6th floor elevator lobby.in compliance with sfbc section 1008.1.4.6. approval of locks on elevator lobby doors check list. n/a maher ordinance | $2,000 |
| Sep 2, 2014 | Expired or cancelled cancelled Jan 2026 | 180 Redwood St | relocate 4 supply ducts, install 1 ceiling exhaustDetails
relocate 4 supply ducts, install 1 ceiling exhaust | $5,200 |
| Aug 29, 2014 | Completed final sign-off Oct 2014 | 180 Redwood St | 3rd floor - remove (e) floor coverings, remove (2) offices, add (3) new offices & a conference room, new lighting in new offices, new flooring surfaces, new windows interior in front of conference room.Details
3rd floor - remove (e) floor coverings, remove (2) offices, add (3) new offices & a conference room, new lighting in new offices, new flooring surfaces, new windows interior in front of conference room. | $189,565 |
| Aug 22, 2014 | Completed final sign-off Aug 2015 | 665 Chestnut St | install a new handicap lift and modify stairs as needed for liftDetails
install a new handicap lift and modify stairs as needed for lift | $35,000 |
| Aug 21, 2014 | Expired or cancelled cancelled Nov 2016 | 3157 Steiner St | alteration to (e) 2-family home. vertical addition to create a (n) 3rd story mezzanine w/ living, wet bar & water closet. project will include a (n) roof deck.Details
alteration to (e) 2-family home. vertical addition to create a (n) 3rd story mezzanine w/ living, wet bar & water closet. project will include a (n) roof deck. | $160,000 |