Back to bathroom remodel contractors
J A N Environmental Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Feb 2020
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2020 | Completed final sign-off May 2020 | 1380 Greenwich St | unit #211 - f&i twelve (12) new can lights, repair bathtub drain, install new bathroom flooring. repair in-kind. no structural work.Details
unit #211 - f&i twelve (12) new can lights, repair bathtub drain, install new bathroom flooring. repair in-kind. no structural work. | $7,500 |
| Jun 15, 2018 | Completed final sign-off Apr 2019 | 1574 Innes Av | enclose interior open stairway/remove kitchen window. app new wall and entry door. 3'1" behind grill door. resolve violation for unpermitted kitchen and bath remodel and rear windows. replace 4 windows at rear, remodel kitchen & one bath roomDetails
enclose interior open stairway/remove kitchen window. app new wall and entry door. 3'1" behind grill door. resolve violation for unpermitted kitchen and bath remodel and rear windows. replace 4 windows at rear, remodel kitchen & one bath room | $50,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 394 Pacific Av | construct new ada shower room and upgrade extg non-conforming sink in women's bathroom t0 ada compliant sink, all work on 5th floor only. n/a for maherDetails
construct new ada shower room and upgrade extg non-conforming sink in women's bathroom t0 ada compliant sink, all work on 5th floor only. n/a for maher | $10,000 |
| Dec 8, 2015 | Completed final sign-off Mar 2017 | 814 Montgomery St | new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinanceDetails
new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinance | $300,000 |
| May 27, 2015 | Never finaled issued Jun 2015, no final | 225 Valencia St | new ada shower in extg ada bathrooms on 1st and 2nd floor. n/a for the maher.Details
new ada shower in extg ada bathrooms on 1st and 2nd floor. n/a for the maher. | $20,000 |
| Apr 23, 2015 | Completed final sign-off Dec 2015 | 1539 Mckinnon Av | renovate 2nd floor. new kitchen, bathrooms, electrical, plmg, windows and skylights. remove wall between kitchen, living room and dining room. install support beam and required footings and supports. demo lathe and plaster. install insulation and new sheet rock.Details
renovate 2nd floor. new kitchen, bathrooms, electrical, plmg, windows and skylights. remove wall between kitchen, living room and dining room. install support beam and required footings and supports. demo lathe and plaster. install insulation and new sheet rock. | $180,000 |
| Feb 17, 2015 | Completed final sign-off Jul 2015 | 135 Post St | suite #600:relocate bathroom doors. n/a for the maherDetails
suite #600:relocate bathroom doors. n/a for the maher | $2,000 |