Block 0175, lot 016
70 Gold St
- City’s use
- Commercial Retail
- Built
- 1910
- Stories
- 2
- Units
- 2
- Rooms
- 1 bathroom
- Building
- 9,700 sq ft
- Lot
- 6,250 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 17, 2022 | Expired or cancelled cancelled Jan 2026 | 70 Gold St | minor alteration for commercial offices. ground floor work only. mep scopes are design-build and under separate permit. no change of use of floor area proposed.Details
minor alteration for commercial offices. ground floor work only. mep scopes are design-build and under separate permit. no change of use of floor area proposed. | $600,000 | |
| May 18, 2016 | Never finaled issued May 2016, no final | 814 Montgomery St | street spaceDetails
street space | ||
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 814 Montgomery St | Magnum Construction Group Inc | all 3 fl: extend fire sprinkler head for new ada restroom @ remodel area. ref #2015-1204-4446. n/a maher ordinanceDetails
all 3 fl: extend fire sprinkler head for new ada restroom @ remodel area. ref #2015-1204-4446. n/a maher ordinance | $3,000 |
| Mar 18, 2016 | Completed final sign-off Apr 2016 | 814 Montgomery St | Fire Detection Unlimited | replacing flex with emt for the existing 2nd floor fire alarm devices. ref pa 2015-1208-4446Details
replacing flex with emt for the existing 2nd floor fire alarm devices. ref pa 2015-1208-4446 | $2,390 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 814 Montgomery St | Schmitt Heating Co Inc | replace (2) heat pumps on 2nd floor and reduct as necessary. reduct (3) existing package units to accomodate new floor plans. maher naDetails
replace (2) heat pumps on 2nd floor and reduct as necessary. reduct (3) existing package units to accomodate new floor plans. maher na | $32,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 814 Montgomery St | street spaceDetails
street space | ||
| Dec 18, 2015 | Never finaled filed Dec 2015, never issued | 814 Montgomery St | revision to 201512084446. reconfigure 1st fl mens bathDetails
revision to 201512084446. reconfigure 1st fl mens bath | ||
| Dec 18, 2015 | Completed final sign-off Feb 2017 | 814 Montgomery St | J A N Environmental Construction | revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add (n) skylight. n/a for maher ordinance 155-13.Details
revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add (n) skylight. n/a for maher ordinance 155-13. | |
| Dec 8, 2015 | Completed final sign-off Mar 2017 | 814 Montgomery St | J A N Environmental Construction | new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinanceDetails
new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinance | $300,000 |
| Sep 22, 2015 | Never finaled issued Sep 2015, no final | 814 Montgomery St | J A N Environmental Construction | selective demo - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher naDetails
selective demo - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher na | $10,000 |
| Apr 3, 2012 | Never finaled issued Apr 2012, no final | 90 Gold St | no work done, change type of construction & stories per building inspector request. type iii-b, 3 stories over basement. ref. to pa#201203125863 & 201203216545Details
no work done, change type of construction & stories per building inspector request. type iii-b, 3 stories over basement. ref. to pa#201203125863 & 201203216545 | ||
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 90 Gold St | basement - new lighting title-24, ref pa #2012.03.12.5863.Details
basement - new lighting title-24, ref pa #2012.03.12.5863. | $20,000 | |
| Mar 19, 2012 | Never finaled issued Mar 2012, no final | 90 Gold St | O'connor Plumbing & Fire Protection | relocate 5 existing heads and add 3 new sprinker heads in basement only, includes 2 flexheads.Details
relocate 5 existing heads and add 3 new sprinker heads in basement only, includes 2 flexheads. | $1,500 |
| Mar 12, 2012 | Completed final sign-off Jul 2012 | 90 Gold St | non load bearing partition walls door/windows, new electrical outlets & fixtures. new hvac system. small kitchen remodel.Details
non load bearing partition walls door/windows, new electrical outlets & fixtures. new hvac system. small kitchen remodel. | $50,000 | |
| Nov 15, 2010 | Completed final sign-off Mar 2011 | 814 Montgomery St | B B J Electric, Inc | revision to pa# 2010*-0908-0452-modification to plan previously approved, alterations to matrix for sequence of operationDetails
revision to pa# 2010*-0908-0452-modification to plan previously approved, alterations to matrix for sequence of operation | |
| Sep 8, 2010 | Completed final sign-off Mar 2011 | 814 Montgomery St | B B J Electric, Inc | fire alarm for elevator recall. demo existing sprinkler monitor and connect to new panelDetails
fire alarm for elevator recall. demo existing sprinkler monitor and connect to new panel | $5,200 |
| Aug 23, 2010 | Completed final sign-off Mar 2011 | 814 Montgomery St | Jim Parr Dba Plumbing | install 2 fire sprinkler heads top/bottom. elevator shaftDetails
install 2 fire sprinkler heads top/bottom. elevator shaft | $1,800 |
| Aug 18, 2010 | Never finaled issued Aug 2010, no final | 814 Montgomery St | street spaceDetails
street space | ||
| Jul 15, 2010 | Completed final sign-off Mar 2011 | 814 Montgomery St | Trim Fit Constr. - O'reilly Engineering | selective domolition for exploratory purposes on all 3 floors, plus basement. no structural walls removed. 100 sq. ft. of total wall opening per floor. all work within tenant space only and will be on-bearing walls only.Details
selective domolition for exploratory purposes on all 3 floors, plus basement. no structural walls removed. 100 sq. ft. of total wall opening per floor. all work within tenant space only and will be on-bearing walls only. | $12,000 |
| Jun 29, 2010 | Completed final sign-off Sep 2010 | 814 Montgomery St | Qualogy Constrution Inc. | new non bearing partition wall on 3rd level, relocation of e door on 2nd level, new rated infill wall and new non rated furred out walls on 1st levelDetails
new non bearing partition wall on 3rd level, relocation of e door on 2nd level, new rated infill wall and new non rated furred out walls on 1st level | $30,000 |
| Jun 28, 2010 | Completed final sign-off Mar 2011 | 814 Montgomery St | install new elevator in existing building. new elevator will remove accessibility issue between floors. work also includes replacement of some windows, doors in atrium, minor alterations @third floor & new skylight @ top of elevator shaft. sprinkler work and tenant improvement by separate permitDetails
install new elevator in existing building. new elevator will remove accessibility issue between floors. work also includes replacement of some windows, doors in atrium, minor alterations @third floor & new skylight @ top of elevator shaft. sprinkler work and tenant improvement by separate permit | $90,000 | |
| Jun 22, 2010 | Completed final sign-off Sep 2010 | 814 Montgomery St | Qualogy Constrution Inc. | interior demo of non bearing walls only on 1st, 2nd and 3rd floors. ti under separate permit.Details
interior demo of non bearing walls only on 1st, 2nd and 3rd floors. ti under separate permit. | $20,000 |
| May 9, 2008 | Never finaled issued May 2008, no final | 820 Montgomery St | street space permit only.Details
street space permit only. | ||
| Jul 30, 2004 | Never finaled issued Jul 2004, no final | 814 Montgomery St | Michael Fellman Siding & Roofing | reroofingDetails
reroofing | $7,800 |
| Jan 28, 2000 | Completed final sign-off Mar 2000 | 814 Montgomery St | revise pa#9902756-revise layout for grd floor women bathrmDetails
revise pa#9902756-revise layout for grd floor women bathrm |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- J A N Environmental Construction (3), B B J Electric, Inc (2), Qualogy Constrution Inc. (2), Fire Detection Unlimited, Jim Parr Dba Plumbing, Magnum Construction Group Inc, Michael Fellman Siding & Roofing, O'connor Plumbing & Fire Protection, Schmitt Heating Co Inc, Trim Fit Constr. - O'reilly Engineering
- Architects
- Anthony Pantaleoni (2), Paul Tang, Ronald Wallace
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.