C & C General Engineering Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2003 to Jun 2026
- Last 24 months
- 3 permits filed
134 permits since 2000: 100 completed, 3 in progress, 23 never finaled, 8 expired or cancelled.
Of the 23 never-finaled permits, 7 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 134.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2026 | In progress issued Jul 2026 | 6001 California St | revision to permit 202602206263. remodel grocery store layout at basement, first, second (mezzanine), and roof. upgrade 1st floor level framing, expand 2nd floor, new equipment at roof. upgrade accessible requirements.Details
revision to permit 202602206263. remodel grocery store layout at basement, first, second (mezzanine), and roof. upgrade 1st floor level framing, expand 2nd floor, new equipment at roof. upgrade accessible requirements. | $20,000 |
| Apr 17, 2026 | In progress issued Aug 2026 | 819 Garfield St | remodel (e) ground floor adding 2 bedrooms, 1 bathroom, 1 family room with 2 burner kitchette @ ground floor as per planDetails
remodel (e) ground floor adding 2 bedrooms, 1 bathroom, 1 family room with 2 burner kitchette @ ground floor as per plan | $50,000 |
| Jan 21, 2025 | Completed final sign-off Apr 2025 | 19 Vienna St | revision to pa# 202409231363. interior layout per inspector requrest. no room count change.Details
revision to pa# 202409231363. interior layout per inspector requrest. no room count change. | |
| Sep 23, 2024 | Completed final sign-off Apr 2025 | 19 Vienna St | 2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear.Details
2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear. | $100,000 |
| Sep 5, 2024 | Completed final sign-off Mar 2025 | 1467 Vallejo St | rev 202402145920 (mep permits) to include 1467 vallejo st address and 1467 vallejo st #a/b per otc manager david jDetails
rev 202402145920 (mep permits) to include 1467 vallejo st address and 1467 vallejo st #a/b per otc manager david j | |
| Aug 21, 2024 | Completed final sign-off Aug 2024 | 2134 Polk St | rev 202212309589- to docuemnt final as built conditions, exit signs, front facade (e) awning structure w/new cover, front access door and egress service door to public right of way w/ no auto door openerDetails
rev 202212309589- to docuemnt final as built conditions, exit signs, front facade (e) awning structure w/new cover, front access door and egress service door to public right of way w/ no auto door opener | $1,000 |
| May 24, 2024 | Completed final sign-off Aug 2024 | 1467 Vallejo St | revision to pa# 2022-1230-9589 to document as built conditions. modify toilet locations at 2nd story. adjust floor plan at 2nd fl. document easements & exits throughout easements to public right of wayDetails
revision to pa# 2022-1230-9589 to document as built conditions. modify toilet locations at 2nd story. adjust floor plan at 2nd fl. document easements & exits throughout easements to public right of way | $40,000 |
| Feb 14, 2024 | Completed final sign-off Mar 2025 | 2134 Polk St | mep deferred submittal under original permit # 202212309589.Details
mep deferred submittal under original permit # 202212309589. | |
| Jan 10, 2024 | Completed final sign-off Aug 2024 | 2140 Polk St | revision to pa# 202212309589. structural revision based on (e) field condition, exposed during construction. provide (n) doors at deli area and update equipment layout. add a new bathroom and a new roof hatch and ladder at second floor.Details
revision to pa# 202212309589. structural revision based on (e) field condition, exposed during construction. provide (n) doors at deli area and update equipment layout. add a new bathroom and a new roof hatch and ladder at second floor. | $1,000 |
| Jan 5, 2024 | In progress issued Jan 2024 | 920 North Point St | to obtain final inspection for work approved under pa# 201809059186. all work is complete.Details
to obtain final inspection for work approved under pa# 201809059186. all work is complete. | |
| Dec 19, 2023 | Completed final sign-off Aug 2024 | 2140 Polk St | revision to pa# 202211146482, proposed changes to door types at front facade and replace front door at #2140.Details
revision to pa# 202211146482, proposed changes to door types at front facade and replace front door at #2140. | $3,000 |
| Nov 15, 2023 | Completed final sign-off Aug 2025 | 221 Bay Shore Bl | abe improvement (abe# 202001271320) - mandatory disability access improvement. install power door operator and technical infeasibility request to comply w/ abe ordinance 51-16.Details
abe improvement (abe# 202001271320) - mandatory disability access improvement. install power door operator and technical infeasibility request to comply w/ abe ordinance 51-16. | $4,000 |
| Nov 14, 2023 | Completed final sign-off Jan 2024 | 2363 42nd Av | revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts.Details
revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts. | $4,000 |
| Sep 29, 2023 | Completed final sign-off Nov 2024 | 1195 Tennessee St | basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes.Details
basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes. | $45,000 |
| Jan 23, 2023 | Completed final sign-off Jan 2024 | 2363 42nd Av | revision to pa #2022-0809-0165: revise strong wall detail at rear of the house.Details
revision to pa #2022-0809-0165: revise strong wall detail at rear of the house. | |
| Jan 19, 2023 | Completed final sign-off Jan 2023 | 700 36th Av | to obtain final inspection for work approved under pa# renew pa# 201909111314 & 201803204151. all work is complete.Details
to obtain final inspection for work approved under pa# renew pa# 201909111314 & 201803204151. all work is complete. | |
| Dec 30, 2022 | Completed final sign-off Mar 2025 | 2140 Polk St | all work to be done at interior only. remodel interior ground fl & 2nd fl grocery store plan. modify (e) equipements locations, relocate interior stairs, modify isle shelving & sales counters to be accesible. upgrade 2nd flr toilet rm to be more accessible.Details
all work to be done at interior only. remodel interior ground fl & 2nd fl grocery store plan. modify (e) equipements locations, relocate interior stairs, modify isle shelving & sales counters to be accesible. upgrade 2nd flr toilet rm to be more accessible. | $140,000 |
| Nov 14, 2022 | Completed final sign-off Aug 2024 | 2140 Polk St | modify entry door at 2134 polk st. add new door at back of 2140 polk st, means of egress to public-right-of-way, expand existing grocery store at 2140 polk st to adjacent 2134 polk st space. ref pa# - abe 201904087390Details
modify entry door at 2134 polk st. add new door at back of 2140 polk st, means of egress to public-right-of-way, expand existing grocery store at 2140 polk st to adjacent 2134 polk st space. ref pa# - abe 201904087390 | $20,000 |
| Aug 25, 2022 | Completed final sign-off Sep 2025 | 609 43rd Av | interior layout rev to pa201911147280: swap (e0 kitchen & (e) dining areas with (e) living areas. reduce egress window size in bedroom #2.Details
interior layout rev to pa201911147280: swap (e0 kitchen & (e) dining areas with (e) living areas. reduce egress window size in bedroom #2. | |
| Aug 9, 2022 | Completed final sign-off Jan 2024 | 2363 42nd Av | 1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater.Details
1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater. | $100,000 |
| Apr 28, 2022 | Completed final sign-off Apr 2022 | 2227 Polk St | install new awning.Details
install new awning. | $5,000 |
| Apr 28, 2022 | Completed final sign-off Apr 2022 | 2227 Polk St | install one non-illuminated single faced wall sign: "bonita"Details
install one non-illuminated single faced wall sign: "bonita" | $600 |
| Mar 7, 2022 | Completed final sign-off Nov 2022 | 320 Ofarrell St | remove partial sheetrock wall to repair water supply pipe leak. repair (e) quarry tile kitchen floor because of water damage. to comply with complaint #202184351 (all replacement in kind)Details
remove partial sheetrock wall to repair water supply pipe leak. repair (e) quarry tile kitchen floor because of water damage. to comply with complaint #202184351 (all replacement in kind) | $5,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 2227 Polk St | existing bar/restaurant to be remodeled into restaurant(bonita) remove extg bar and provide seating for new dining area modify partial layout.Details
existing bar/restaurant to be remodeled into restaurant(bonita) remove extg bar and provide seating for new dining area modify partial layout. | $40,000 |
| Aug 17, 2021 | Completed final sign-off May 2022 | 2255 Chestnut St | modify storefront and entry at east side. unify the facade to match extg facade at 2257 chestnut street at west side. for the approved bonita restaurant expansion/revision per permit #202106182790Details
modify storefront and entry at east side. unify the facade to match extg facade at 2257 chestnut street at west side. for the approved bonita restaurant expansion/revision per permit #202106182790 | $10,000 |
| Jun 18, 2021 | Completed final sign-off May 2022 | 2255 Chestnut St | expand (e) restaurant, "bonita", into adjacent vacant tenant space, new bathroom & storage & prep areaDetails
expand (e) restaurant, "bonita", into adjacent vacant tenant space, new bathroom & storage & prep area | $100,000 |
| Sep 10, 2020 | Completed final sign-off Apr 2025 | 64 Beaver St | revision to bpa#201901099953. facade remodel, remove (e) rounded bay window, replace w/squared off bay window, same sq. ft. as (e). minor window adjustments in sizing, minor changes to floor plans. no changen to unit size/deckDetails
revision to bpa#201901099953. facade remodel, remove (e) rounded bay window, replace w/squared off bay window, same sq. ft. as (e). minor window adjustments in sizing, minor changes to floor plans. no changen to unit size/deck | $50,000 |
| Jul 20, 2020 | Completed final sign-off Jul 2021 | 1827 Irving St | reparing store front in-kind due to vehicle accident. low wall with tile & glass panel. no structural damage.Details
reparing store front in-kind due to vehicle accident. low wall with tile & glass panel. no structural damage. | $8,000 |
| Jun 23, 2020 | Never finaled issued Jun 2020, no final | 64 Beaver St | street spaceDetails
street space | |
| Nov 14, 2019 | Completed final sign-off Apr 2026 | 609 43rd Av | legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living roomDetails
legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living room | $60,000 |
| Nov 12, 2019 | Completed final sign-off Nov 2019 | 3860 26th St | unit #6: remodel kitchen & bathroom. same layoutDetails
unit #6: remodel kitchen & bathroom. same layout | $12,000 |
| Aug 5, 2019 | Completed final sign-off Aug 2019 | 1851 44th Av | to obtain a final inspecton for work approved under pa200808199552 & pa200809161791. all work is complete.Details
to obtain a final inspecton for work approved under pa200808199552 & pa200809161791. all work is complete. | |
| Jul 19, 2019 | Completed final sign-off Sep 2019 | 1362 Stockton St | title 24 lighting compliance, ref pa 201903084747Details
title 24 lighting compliance, ref pa 201903084747 | $3,000 |
| Apr 12, 2019 | Never finaled issued Feb 2020, no final | 920 North Point St | revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of houseDetails
revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of house | |
| Mar 8, 2019 | Completed final sign-off Jul 2019 | 1362 Stockton St | rearange counter configuraion, install (n) dumbwaiter, remodel (e) add bathroomDetails
rearange counter configuraion, install (n) dumbwaiter, remodel (e) add bathroom | $20,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 900 North Point St | street spaceDetails
street space | |
| Jan 23, 2019 | Completed final sign-off May 2019 | 3690 18th St | relocate extg handicapped toilet for seismic upgrade, modify walls. seismic upgrade under seperate permit (201802010154).Details
relocate extg handicapped toilet for seismic upgrade, modify walls. seismic upgrade under seperate permit (201802010154). | $5,000 |
| Jan 10, 2019 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | revision to 201804095888 replace (e) permiter * interior masonry w/new concrete foundationDetails
revision to 201804095888 replace (e) permiter * interior masonry w/new concrete foundation | $25,000 |
| Dec 27, 2018 | Completed final sign-off Nov 2020 | 1559 24th Av | 1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skyltsDetails
1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skylts | $95,000 |
| Oct 16, 2018 | Completed final sign-off May 2019 | 702 Valencia St | minor demo of existing pizza over only - no other work.Details
minor demo of existing pizza over only - no other work. | $2,940 |
| Sep 5, 2018 | Never finaled issued Apr 2019, no final | 920 North Point St | revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage levelDetails
revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage level | $100,000 |
| Jul 2, 2018 | Expired or cancelled expired Jul 2021 | 49 Drumm St | to obtain final inspection for work approved under pa #201607223133, 201510301349, & 201606240873. all work is completeDetails
to obtain final inspection for work approved under pa #201607223133, 201510301349, & 201606240873. all work is complete | |
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 1825 Irving St | repair and replace damaged storefront in kindDetails
repair and replace damaged storefront in kind | $10,000 |
| May 24, 2018 | Completed final sign-off Jun 2019 | 625 Kearny St | change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a **Details
change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a ** | $10,000 |
| Apr 12, 2018 | Expired or cancelled cancelled Feb 2019 | 3860 26th St | revise pa# 2017/08/15/4922. convert storage to adu per ord# 162-16 @ ground floor. (per mandatory seismic retrofitting under sfebc chapter 4d) ** maher: n/a **Details
revise pa# 2017/08/15/4922. convert storage to adu per ord# 162-16 @ ground floor. (per mandatory seismic retrofitting under sfebc chapter 4d) ** maher: n/a ** | $15,000 |
| Apr 9, 2018 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitionsDetails
remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitions | $160,000 |
| Mar 15, 2018 | Completed final sign-off Jun 2018 | 431 Clement St | change tiles at front facade.Details
change tiles at front facade. | $8,000 |
| Mar 13, 2018 | Completed final sign-off Aug 2018 | 2261 Chestnut St | to comply with nov #201720921 - replace existing internal blower to new blower at roof to existing type 1 hood - blower installed - needs to be relocated. balance (e) make up air w/ new exhaust blower. n/a for maher.Details
to comply with nov #201720921 - replace existing internal blower to new blower at roof to existing type 1 hood - blower installed - needs to be relocated. balance (e) make up air w/ new exhaust blower. n/a for maher. | $1,000 |
| Feb 27, 2018 | Completed final sign-off Aug 2018 | 320 Ofarrell St | t.i. extg retail store convert to to-go tea shop. add small kitchen, prep area. n/a for maher. no exterior work or changes.Details
t.i. extg retail store convert to to-go tea shop. add small kitchen, prep area. n/a for maher. no exterior work or changes. | $95,000 |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 56 Saint Charles Av | residential interior remodel on 2nd fl and addition of habitable space on ground fl. all work limited to within existing bldg envelope. new 2 bed, 1 home office, 1 media area, 3 bathrooms on ground fl. new 2 bath on second floor, water heater, exhaust fanDetails
residential interior remodel on 2nd fl and addition of habitable space on ground fl. all work limited to within existing bldg envelope. new 2 bed, 1 home office, 1 media area, 3 bathrooms on ground fl. new 2 bath on second floor, water heater, exhaust fan | $80,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2018 | 431 Clement St | tenant improvement to new ownership. replace (e) cooking, equipment, w/new, construct new ada toilet room & re-tile flooring.Details
tenant improvement to new ownership. replace (e) cooking, equipment, w/new, construct new ada toilet room & re-tile flooring. | $80,000 |
| Oct 10, 2017 | Completed final sign-off Aug 2018 | 1825 Irving St | 1st floor. remodel (e) pizza restaurant. join both units, tenant spaces, 1825 & 1827, by partial wall removal. install (n) equipment at restaurant less than 49 occupantDetails
1st floor. remodel (e) pizza restaurant. join both units, tenant spaces, 1825 & 1827, by partial wall removal. install (n) equipment at restaurant less than 49 occupant | $180,000 |
| Aug 28, 2017 | Completed final sign-off Sep 2017 | 3860 26th St | unit #3: remodel (e) kitchen, same layout.Details
unit #3: remodel (e) kitchen, same layout. | $4,800 |
| Aug 25, 2017 | Completed final sign-off Sep 2017 | 215 Kenwood Wy | modify (e) stairs to attic (4th fl level). repair stair - remove upper winder & rebuild upper portion.Details
modify (e) stairs to attic (4th fl level). repair stair - remove upper winder & rebuild upper portion. | $2,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out.Details
revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out. | $4,000 |
| Aug 17, 2017 | Completed final sign-off Aug 2017 | 500 Rockdale Dr | repair outside stucco.Details
repair outside stucco. | $8,000 |
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 3860 26th St | interior remodel, add a half bathroom and storage at ground floor.Details
interior remodel, add a half bathroom and storage at ground floor. | $15,000 |
| Jul 28, 2017 | Completed final sign-off Aug 2018 | 1827 Irving St | convert (e) bathroom to ada compliant, remodel (e) storage room.Details
convert (e) bathroom to ada compliant, remodel (e) storage room. | $15,000 |
| Jul 26, 2017 | Completed final sign-off Sep 2019 | 1423 27th Av | rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard.Details
rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard. | $150,000 |
| Apr 20, 2017 | Expired or cancelled cancelled Jan 2026 | 91 Drumm St | tenant improvement - replace (e) cooking equipment with new & re-tile flooring. remove (e) storage room @ ground floor restaurant.Details
tenant improvement - replace (e) cooking equipment with new & re-tile flooring. remove (e) storage room @ ground floor restaurant. | $120,000 |
| Apr 12, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/fDetails
interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/f | $180,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 604 Church St | remodel unit on 2/f at rear: remodel kitchen & bathroom.Details
remodel unit on 2/f at rear: remodel kitchen & bathroom. | $12,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2018 | 791 Haight St | remodel extg retail space to be remodeled to retail food grocery. upgrade door opener at extg entry door, new counters, extg handi cap toilet interior work only. remove & replace storefront.Details
remodel extg retail space to be remodeled to retail food grocery. upgrade door opener at extg entry door, new counters, extg handi cap toilet interior work only. remove & replace storefront. | $20,000 |
| Mar 3, 2017 | Completed final sign-off Dec 2017 | 3860 26th St | structural revision to permit application # 2015-1208-4473. soft story retrofit.Details
structural revision to permit application # 2015-1208-4473. soft story retrofit. | |
| Dec 1, 2016 | Completed final sign-off Mar 2017 | 1256 34th Av | remove (e) partition wall between kitchen & diningDetails
remove (e) partition wall between kitchen & dining | $1,800 |
| Oct 18, 2016 | Completed final sign-off Jan 2018 | 776 Haight St | revision to 201601046320: modify interior plam, new outlets, rebuild storefront & facade due to dryrot/decay inkind. replace partial foundation at east side of bldg.Details
revision to 201601046320: modify interior plam, new outlets, rebuild storefront & facade due to dryrot/decay inkind. replace partial foundation at east side of bldg. | $25,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 500 Rockdale Dr | revision to permit 201510089217; re-arrange kitchen, dining rm, two bedrms, two bathrms, & re-wire electrical in living rm, dining rm & upgrade partial ceiling framing. all work at 2nd flr.Details
revision to permit 201510089217; re-arrange kitchen, dining rm, two bedrms, two bathrms, & re-wire electrical in living rm, dining rm & upgrade partial ceiling framing. all work at 2nd flr. | $2,000 |
| Sep 23, 2016 | Completed final sign-off Nov 2016 | 1970 Innes Av | tentant improvement: new toilets & urinals - relocate heaterDetails
tentant improvement: new toilets & urinals - relocate heater | $6,000 |
| Jul 22, 2016 | Never finaled issued Jul 2016, no final | 47 Drumm St | revision to pa# 201602109206, 201510301349,201616240873 to change address from 49 drumm st. for these permits to 47 drumm st. also pp20160309584, & e201606147561Details
revision to pa# 201602109206, 201510301349,201616240873 to change address from 49 drumm st. for these permits to 47 drumm st. also pp20160309584, & e201606147561 | |
| Jul 15, 2016 | Completed final sign-off Nov 2016 | 2684 San Bruno Av | t.i. to replace extg cooking equipments with new. construct new ada toilet room and retile flooring.Details
t.i. to replace extg cooking equipments with new. construct new ada toilet room and retile flooring. | $90,000 |
| Jul 8, 2016 | Completed final sign-off Sep 2016 | 2684 San Bruno Av | parital (e) wall (interior) & equipment to be removed. vacan space per ab-017.Details
parital (e) wall (interior) & equipment to be removed. vacan space per ab-017. | $9,000 |
| Jun 30, 2016 | Never finaled issued Jun 2017, no final | 1423 27th Av | street spaceDetails
street space | |
| Jun 24, 2016 | Never finaled issued Jul 2016, no final | 49 Drumm St | revision to ref pa 2016 0210 9206 lighting t24 only maher naDetails
revision to ref pa 2016 0210 9206 lighting t24 only maher na | $8,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 43 Hillcrest Ct | remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor.Details
remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor. | $30,000 |
| Jun 1, 2016 | Completed final sign-off Jul 2017 | 388 Fulton St | change of use from retail to restaurant use. add a type 41 liquor licenseDetails
change of use from retail to restaurant use. add a type 41 liquor license | |
| Jun 1, 2016 | Completed final sign-off Mar 2017 | 229 Gennessee St | unit legalization ordinance# 43-14. legalize (e) illegal unit on ground floor. ordinance# 33-16 see detail on back.Details
unit legalization ordinance# 43-14. legalize (e) illegal unit on ground floor. ordinance# 33-16 see detail on back. | $20,000 |
| May 13, 2016 | Never finaled issued May 2016, no final | 4809 Mission St | to obtain final inspection for work approved under pa 2001-0908-7866 & 2001-0821-6557. all work is completeDetails
to obtain final inspection for work approved under pa 2001-0908-7866 & 2001-0821-6557. all work is complete | |
| Apr 22, 2016 | Completed final sign-off Dec 2016 | 215 Kenwood Wy | repair & replace exterior rear staircase wall in kind (dry rot).Details
repair & replace exterior rear staircase wall in kind (dry rot). | $4,000 |
| Mar 29, 2016 | Never finaled issued Apr 2016, no final | 4809 Mission St | revision to pa 2007-0316-6413, modify as approved plans & windows, modify windows to fusible link - reflect (e) as built conditionsDetails
revision to pa 2007-0316-6413, modify as approved plans & windows, modify windows to fusible link - reflect (e) as built conditions | |
| Mar 18, 2016 | Completed final sign-off Apr 2017 | 1401 Cayuga Av | legalize (e) bathroom, bedroom, storage room, laundry & family room. all work at ground floor.Details
legalize (e) bathroom, bedroom, storage room, laundry & family room. all work at ground floor. | $46,200 |
| Mar 15, 2016 | Never finaled issued Mar 2016, no final | 4809 Mission St | to obtain final inspection for work approved under app#200703166413 and 201407292460. all work is complete.Details
to obtain final inspection for work approved under app#200703166413 and 201407292460. all work is complete. | |
| Feb 26, 2016 | Never finaled issued May 2016, no final | 151 Sanchez St | repair/rebuilt extg deck and staircase with new in kind at rear of bldgDetails
repair/rebuilt extg deck and staircase with new in kind at rear of bldg | $8,000 |
| Feb 10, 2016 | Completed final sign-off Oct 2022 | 49 Drumm St | existing 2 story office bldg over basement, gr fl to be converted to limited retaurant. new type 1 hood, hadicap toilet, provide service area prep area and storage, entry doors. structural work under separate permit. n/a maher ord. 155-13Details
existing 2 story office bldg over basement, gr fl to be converted to limited retaurant. new type 1 hood, hadicap toilet, provide service area prep area and storage, entry doors. structural work under separate permit. n/a maher ord. 155-13 | $60,000 |
| Jan 4, 2016 | Completed final sign-off Jan 2018 | 776 Haight St | relocate toilet. infill below extg habitable space. provide 1 hour wall at p.l. remove walls. add footing. per plan.Details
relocate toilet. infill below extg habitable space. provide 1 hour wall at p.l. remove walls. add footing. per plan. | $10,000 |
| Dec 8, 2015 | Completed final sign-off Dec 2017 | 3860 26th St | 1st fl: install 3 moment frames,Details
1st fl: install 3 moment frames, | $60,000 |
| Nov 17, 2015 | Expired or cancelled expired Feb 2020 | 4801 Mission St | retaining wall @ rear easement area & concrete slab for walkwayDetails
retaining wall @ rear easement area & concrete slab for walkway | $5,000 |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 49 Drumm St | remove partition walls, bathroom & sinks - provide new hc/ada toilet & new partition walls. maher naDetails
remove partition walls, bathroom & sinks - provide new hc/ada toilet & new partition walls. maher na | $16,000 |
| Oct 8, 2015 | Completed final sign-off Jun 2017 | 500 Rockdale Dr | 1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per planDetails
1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per plan | $100,000 |
| Oct 2, 2015 | Never finaled issued Oct 2015, no final | 22 Newman St | lower level & 2/f: exploratory drywall demo, approx (4) areas at 50 sq. ft. each. drywall to be reinstalled for final inspection.Details
lower level & 2/f: exploratory drywall demo, approx (4) areas at 50 sq. ft. each. drywall to be reinstalled for final inspection. | $500 |
| Sep 8, 2015 | Completed final sign-off May 2016 | 2475 19th Av | add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street.Details
add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street. | $45,000 |
| Aug 18, 2015 | Never finaled issued Sep 2015, no final | 725 Grant Av | 2nd floor: install hvac system. install 2 type i hoods, 1 type iii hood with exhaust fan and make up air unit. and t-24 compliance. maher naDetails
2nd floor: install hvac system. install 2 type i hoods, 1 type iii hood with exhaust fan and make up air unit. and t-24 compliance. maher na | $50,000 |
| Aug 10, 2015 | Completed final sign-off Mar 2016 | 2305 Irving St | convert extg lychee cafe to bakery store. construct ada toilet room and re-tile flooring. replace type i hood into type ii hood & exh make-up air fan in same location.Details
convert extg lychee cafe to bakery store. construct ada toilet room and re-tile flooring. replace type i hood into type ii hood & exh make-up air fan in same location. | $60,000 |
| May 18, 2015 | Never finaled issued Jun 2015, no final | 725 Grant Av | interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl.Details
interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl. | $400,000 |
| Mar 25, 2015 | Never finaled issued Mar 2015, no final | 725 Grant Av | interior non structural partition and wall demolition for future. remodel 2nd floor restaurant. n/a for the maher. separate ti permit. ab-017 appliesDetails
interior non structural partition and wall demolition for future. remodel 2nd floor restaurant. n/a for the maher. separate ti permit. ab-017 applies | $10,000 |
| Mar 12, 2015 | Never finaled issued Apr 2015, no final | 230 04th St | t.i. of existing ground floor shell space, new interior wall and floor finishes, new walkin coolers & frezzer. plumbing, mechanical and electrical under separate permit. maher n/a.Details
t.i. of existing ground floor shell space, new interior wall and floor finishes, new walkin coolers & frezzer. plumbing, mechanical and electrical under separate permit. maher n/a. | $75,000 |
| Jan 5, 2015 | Completed final sign-off Jun 2015 | 2174 Market St | install new mechanical systems for banquet rooms on 2nd flDetails
install new mechanical systems for banquet rooms on 2nd fl | $18,000 |
| Dec 16, 2014 | Never finaled issued Jan 2015, no final | 592 Guerrero St | remove e partition walls. rebuild e non conforming stairDetails
remove e partition walls. rebuild e non conforming stair | $2,000 |
| Nov 12, 2014 | Completed final sign-off Feb 2016 | 2174 Market St | new shed at rear yeard 100 sqft.Details
new shed at rear yeard 100 sqft. | $7,000 |
| Oct 23, 2014 | Completed final sign-off Apr 2015 | 2174 Market St | revision appl. #2013.1231.5432 & 2013.1231.5434. remodel toilets on 1st floor, 2nd floor and third floor per plans to reflect (e) as built conditions. correction to appl 2013.1231.5432 on story count and type of construction. maher n/a.Details
revision appl. #2013.1231.5432 & 2013.1231.5434. remodel toilets on 1st floor, 2nd floor and third floor per plans to reflect (e) as built conditions. correction to appl 2013.1231.5432 on story count and type of construction. maher n/a. | $11,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 70 Williams Av | add two bedrooms, 1 full bath, 1 home theater. replace vinyl window at back and pato door on ground floor.Details
add two bedrooms, 1 full bath, 1 home theater. replace vinyl window at back and pato door on ground floor. | $35,000 |