C & C General Engineering Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2003 to Jun 2026
- Last 24 months
- 3 permits filed
134 permits since 2000: 100 completed, 3 in progress, 23 never finaled, 8 expired or cancelled.
Of the 23 never-finaled permits, 7 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 8 completed, 2 never finaled. Typically 32 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2022 | Completed final sign-off Mar 2025 | 2140 Polk St | all work to be done at interior only. remodel interior ground fl & 2nd fl grocery store plan. modify (e) equipements locations, relocate interior stairs, modify isle shelving & sales counters to be accesible. upgrade 2nd flr toilet rm to be more accessible.Details
all work to be done at interior only. remodel interior ground fl & 2nd fl grocery store plan. modify (e) equipements locations, relocate interior stairs, modify isle shelving & sales counters to be accesible. upgrade 2nd flr toilet rm to be more accessible. | $140,000 |
| Dec 27, 2018 | Completed final sign-off Nov 2020 | 1559 24th Av | 1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skyltsDetails
1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skylts | $95,000 |
| Aug 25, 2017 | Completed final sign-off Sep 2017 | 215 Kenwood Wy | modify (e) stairs to attic (4th fl level). repair stair - remove upper winder & rebuild upper portion.Details
modify (e) stairs to attic (4th fl level). repair stair - remove upper winder & rebuild upper portion. | $2,000 |
| Jul 26, 2017 | Completed final sign-off Sep 2019 | 1423 27th Av | rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard.Details
rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard. | $150,000 |
| Apr 12, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/fDetails
interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/f | $180,000 |
| Apr 22, 2016 | Completed final sign-off Dec 2016 | 215 Kenwood Wy | repair & replace exterior rear staircase wall in kind (dry rot).Details
repair & replace exterior rear staircase wall in kind (dry rot). | $4,000 |
| Feb 26, 2016 | Never finaled issued May 2016, no final | 151 Sanchez St | repair/rebuilt extg deck and staircase with new in kind at rear of bldgDetails
repair/rebuilt extg deck and staircase with new in kind at rear of bldg | $8,000 |
| Oct 8, 2015 | Completed final sign-off Jun 2017 | 500 Rockdale Dr | 1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per planDetails
1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per plan | $100,000 |
| Dec 16, 2014 | Never finaled issued Jan 2015, no final | 592 Guerrero St | remove e partition walls. rebuild e non conforming stairDetails
remove e partition walls. rebuild e non conforming stair | $2,000 |
| Nov 6, 2003 | Completed final sign-off Feb 2004 | 42 Bruce Av | repair front stairway (outside).Details
repair front stairway (outside). | $2,000 |