Back to bathroom remodel contractors
C & C General Engineering Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2003 to Jun 2026
- Last 24 months
- 3 permits filed
134 permits since 2000: 100 completed, 3 in progress, 23 never finaled, 8 expired or cancelled.
Of the 23 never-finaled permits, 7 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 29 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 29 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2026 | In progress issued Aug 2026 | 819 Garfield St | remodel (e) ground floor adding 2 bedrooms, 1 bathroom, 1 family room with 2 burner kitchette @ ground floor as per planDetails
remodel (e) ground floor adding 2 bedrooms, 1 bathroom, 1 family room with 2 burner kitchette @ ground floor as per plan | $50,000 |
| Sep 23, 2024 | Completed final sign-off Apr 2025 | 19 Vienna St | 2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear.Details
2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear. | $100,000 |
| Jan 10, 2024 | Completed final sign-off Aug 2024 | 2140 Polk St | revision to pa# 202212309589. structural revision based on (e) field condition, exposed during construction. provide (n) doors at deli area and update equipment layout. add a new bathroom and a new roof hatch and ladder at second floor.Details
revision to pa# 202212309589. structural revision based on (e) field condition, exposed during construction. provide (n) doors at deli area and update equipment layout. add a new bathroom and a new roof hatch and ladder at second floor. | $1,000 |
| Nov 14, 2023 | Completed final sign-off Jan 2024 | 2363 42nd Av | revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts.Details
revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts. | $4,000 |
| Sep 29, 2023 | Completed final sign-off Nov 2024 | 1195 Tennessee St | basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes.Details
basement: non-structural interior alteration (creation of 1 bedroom, 1 media room, 1 laundry room and 1 bathroom). no vertical or horizontal changes. no exterior changes. | $45,000 |
| Aug 9, 2022 | Completed final sign-off Jan 2024 | 2363 42nd Av | 1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater.Details
1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater. | $100,000 |
| Jun 18, 2021 | Completed final sign-off May 2022 | 2255 Chestnut St | expand (e) restaurant, "bonita", into adjacent vacant tenant space, new bathroom & storage & prep areaDetails
expand (e) restaurant, "bonita", into adjacent vacant tenant space, new bathroom & storage & prep area | $100,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2026 | 609 43rd Av | legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living roomDetails
legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living room | $60,000 |
| Nov 12, 2019 | Completed final sign-off Nov 2019 | 3860 26th St | unit #6: remodel kitchen & bathroom. same layoutDetails
unit #6: remodel kitchen & bathroom. same layout | $12,000 |
| Mar 8, 2019 | Completed final sign-off Jul 2019 | 1362 Stockton St | rearange counter configuraion, install (n) dumbwaiter, remodel (e) add bathroomDetails
rearange counter configuraion, install (n) dumbwaiter, remodel (e) add bathroom | $20,000 |
| Dec 27, 2018 | Completed final sign-off Nov 2020 | 1559 24th Av | 1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skyltsDetails
1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skylts | $95,000 |
| May 24, 2018 | Completed final sign-off Jun 2019 | 625 Kearny St | change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a **Details
change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a ** | $10,000 |
| Apr 9, 2018 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitionsDetails
remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitions | $160,000 |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 56 Saint Charles Av | residential interior remodel on 2nd fl and addition of habitable space on ground fl. all work limited to within existing bldg envelope. new 2 bed, 1 home office, 1 media area, 3 bathrooms on ground fl. new 2 bath on second floor, water heater, exhaust fanDetails
residential interior remodel on 2nd fl and addition of habitable space on ground fl. all work limited to within existing bldg envelope. new 2 bed, 1 home office, 1 media area, 3 bathrooms on ground fl. new 2 bath on second floor, water heater, exhaust fan | $80,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out.Details
revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out. | $4,000 |
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 3860 26th St | interior remodel, add a half bathroom and storage at ground floor.Details
interior remodel, add a half bathroom and storage at ground floor. | $15,000 |
| Jul 28, 2017 | Completed final sign-off Aug 2018 | 1827 Irving St | convert (e) bathroom to ada compliant, remodel (e) storage room.Details
convert (e) bathroom to ada compliant, remodel (e) storage room. | $15,000 |
| Jul 26, 2017 | Completed final sign-off Sep 2019 | 1423 27th Av | rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard.Details
rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard. | $150,000 |
| Apr 12, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/fDetails
interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/f | $180,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 604 Church St | remodel unit on 2/f at rear: remodel kitchen & bathroom.Details
remodel unit on 2/f at rear: remodel kitchen & bathroom. | $12,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 43 Hillcrest Ct | remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor.Details
remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor. | $30,000 |
| Mar 18, 2016 | Completed final sign-off Apr 2017 | 1401 Cayuga Av | legalize (e) bathroom, bedroom, storage room, laundry & family room. all work at ground floor.Details
legalize (e) bathroom, bedroom, storage room, laundry & family room. all work at ground floor. | $46,200 |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 49 Drumm St | remove partition walls, bathroom & sinks - provide new hc/ada toilet & new partition walls. maher naDetails
remove partition walls, bathroom & sinks - provide new hc/ada toilet & new partition walls. maher na | $16,000 |
| Sep 8, 2015 | Completed final sign-off May 2016 | 2475 19th Av | add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street.Details
add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street. | $45,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 70 Williams Av | add two bedrooms, 1 full bath, 1 home theater. replace vinyl window at back and pato door on ground floor.Details
add two bedrooms, 1 full bath, 1 home theater. replace vinyl window at back and pato door on ground floor. | $35,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 1367 41st Av | clear violation# 201459361, replace kitchen cabinet, counter top, install new appliances, replace (n) led insert, retiles to 2 bathroom,, 1 powder room, replace plumbing fixtures inc. w.c., faucet trim.Details
clear violation# 201459361, replace kitchen cabinet, counter top, install new appliances, replace (n) led insert, retiles to 2 bathroom,, 1 powder room, replace plumbing fixtures inc. w.c., faucet trim. | $12,000 |
| Mar 21, 2014 | Completed final sign-off Nov 2014 | 59 Cole St | interior remodeling: remodel existing kitchen and two bath rooms at 2nd floor of existing building. demolish non-bearing wall to make larger kitchen.Details
interior remodeling: remodel existing kitchen and two bath rooms at 2nd floor of existing building. demolish non-bearing wall to make larger kitchen. | $15,000 |
| Sep 26, 2013 | Completed final sign-off Apr 2014 | 2126 30th Av | comply w/nov# 201323701. 2nd floor: add new wood deck, patio doors, repl windows @ rear. repair & replace dry rot floor joists & wall @ rear. grd floor: add 2 new bathrooms, 3 bedrms, 1 office & home theater. relocate furnace & install new tankless water heater, repl windows.Details
comply w/nov# 201323701. 2nd floor: add new wood deck, patio doors, repl windows @ rear. repair & replace dry rot floor joists & wall @ rear. grd floor: add 2 new bathrooms, 3 bedrms, 1 office & home theater. relocate furnace & install new tankless water heater, repl windows. | $75,000 |
| Jul 23, 2013 | Completed final sign-off Apr 2014 | 2126 30th Av | 2nd floor: remodel kitchen, remodel bathroom, add one & a half bath. add home office. install (1) new skylight.Details
2nd floor: remodel kitchen, remodel bathroom, add one & a half bath. add home office. install (1) new skylight. | $45,000 |
| Apr 29, 2013 | Completed final sign-off Feb 2014 | 1367 41st Av | ground floor-remodel bathroom, legalize (e) habitable space, add new home theater. replace 1 patio door & 4 windows in back.Details
ground floor-remodel bathroom, legalize (e) habitable space, add new home theater. replace 1 patio door & 4 windows in back. | $48,000 |
| Jan 23, 2012 | Completed final sign-off Mar 2013 | 542 Divisadero St | repair extg ftg and beams at extg retail space upgrade entry, bathroom toilet and path of travel at handicap accessibility.new concrete slab on slab on grade(n) store front (restore (e) facade beloww (e) plywood.Details
repair extg ftg and beams at extg retail space upgrade entry, bathroom toilet and path of travel at handicap accessibility.new concrete slab on slab on grade(n) store front (restore (e) facade beloww (e) plywood. | $12,000 |
| Aug 11, 2011 | Completed final sign-off Oct 2012 | 211 08th Av | interior remodel of ground floor unit (211 8th ave.): convert bathroom into master suite; rearrange living, dinning & kitchen; new storage room and add new bathroom.Details
interior remodel of ground floor unit (211 8th ave.): convert bathroom into master suite; rearrange living, dinning & kitchen; new storage room and add new bathroom. | $75,000 |
| Feb 19, 2010 | Completed final sign-off Jun 2010 | 210 Santa Ana Av | on 2nd. flr.: convert (e) closets into new bath for master bedroom; remodel (e) bath & kitchen; new plumbing & electrical fixtures.Details
on 2nd. flr.: convert (e) closets into new bath for master bedroom; remodel (e) bath & kitchen; new plumbing & electrical fixtures. | $20,000 |
| May 9, 2007 | Completed final sign-off Jun 2007 | 797 Hampshire St | replace bathtub faucets + bathtub overflow on 2nd floor bathroom. change tile. (repair leak from bathtub into kitchen) & to comply with nov#200796017. replace 12 windows, elimimate mold formation.Details
replace bathtub faucets + bathtub overflow on 2nd floor bathroom. change tile. (repair leak from bathtub into kitchen) & to comply with nov#200796017. replace 12 windows, elimimate mold formation. | $5,000 |