Back to kitchen remodel contractors
C & C General Engineering Inc.
- Based in
- Millbrae
- On San Francisco permits
- Nov 2003 to Jun 2026
- Last 24 months
- 3 permits filed
134 permits since 2000: 100 completed, 3 in progress, 23 never finaled, 8 expired or cancelled.
Of the 23 never-finaled permits, 7 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 28 completed, 3 never finaled, 2 expired or cancelled. Typically 29 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2024 | Completed final sign-off Apr 2025 | 19 Vienna St | 2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear.Details
2nd floor relocate and remodel kitchen and add 1 (n) bathroom. 1st floor convert (e) garage to home theater, (e) family room into 2 (n) bedrooms. remodel (1) bathroom, add 1(n) bathroom, 1(n) laundry room, replace (2) vinly windows at rear. | $100,000 |
| Nov 14, 2023 | Completed final sign-off Jan 2024 | 2363 42nd Av | revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts.Details
revision to approved permit# 202208090165: 1/f - relocate interior door to garage. replace garage door. wsher/dryer relocated from 2nd floor. 2/f - add a shower. revise bath #1 and kitchen layouts. | $4,000 |
| Aug 25, 2022 | Completed final sign-off Sep 2025 | 609 43rd Av | interior layout rev to pa201911147280: swap (e0 kitchen & (e) dining areas with (e) living areas. reduce egress window size in bedroom #2.Details
interior layout rev to pa201911147280: swap (e0 kitchen & (e) dining areas with (e) living areas. reduce egress window size in bedroom #2. | |
| Aug 9, 2022 | Completed final sign-off Jan 2024 | 2363 42nd Av | 1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater.Details
1/f: remodel bathroom. enlarge foyer internal connect ro 2/f. sheetrock garage. 2/f: reconfigure layout. add 1 (n) bath. remodel kitchen. add rear less than 10' tall deck. exterior: add 2 (n) skylights on roof. replace windows at rear. install radient floor heat. replace tankless water heater. | $100,000 |
| Mar 7, 2022 | Completed final sign-off Nov 2022 | 320 Ofarrell St | remove partial sheetrock wall to repair water supply pipe leak. repair (e) quarry tile kitchen floor because of water damage. to comply with complaint #202184351 (all replacement in kind)Details
remove partial sheetrock wall to repair water supply pipe leak. repair (e) quarry tile kitchen floor because of water damage. to comply with complaint #202184351 (all replacement in kind) | $5,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2026 | 609 43rd Av | legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living roomDetails
legalize existing dwelling unit per ordinance 43-14, new unit included bedroom, bath, kitchen & living room | $60,000 |
| Nov 12, 2019 | Completed final sign-off Nov 2019 | 3860 26th St | unit #6: remodel kitchen & bathroom. same layoutDetails
unit #6: remodel kitchen & bathroom. same layout | $12,000 |
| Apr 12, 2019 | Never finaled issued Feb 2020, no final | 920 North Point St | revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of houseDetails
revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of house | |
| Dec 27, 2018 | Completed final sign-off Nov 2020 | 1559 24th Av | 1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skyltsDetails
1/f-add 2 (n) baths, 2 (n) bedrms, 1 (n) home theater w/ bar sink, sheetrock at garage. 2/f-add 1 (n) bath, remodel kitchen & bath, relocate (e) stair. exterior- replace 2 casement windows, vinyl & patio doors to (e) openings at rear. in-fill 2/f center court, relocate 3 (e) skylights, ad 2 skylts | $95,000 |
| Sep 5, 2018 | Never finaled issued Apr 2019, no final | 920 North Point St | revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage levelDetails
revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage level | $100,000 |
| May 24, 2018 | Completed final sign-off Jun 2019 | 625 Kearny St | change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a **Details
change of use, two office space into two residential units. add one kitchen, one full bath, & two bathrooms in each dwelling unit. add 170 sq ft roof deck & 1 full bath. *** maher: n/a ** | $10,000 |
| Apr 9, 2018 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitionsDetails
remodel (e) two unit bldg. 3 stories, r-3 occupancy, type v b, remodel & relocate kitchens & bathrooms, add bathrooms re-arrange floor plan partitions | $160,000 |
| Feb 27, 2018 | Completed final sign-off Aug 2018 | 320 Ofarrell St | t.i. extg retail store convert to to-go tea shop. add small kitchen, prep area. n/a for maher. no exterior work or changes.Details
t.i. extg retail store convert to to-go tea shop. add small kitchen, prep area. n/a for maher. no exterior work or changes. | $95,000 |
| Aug 28, 2017 | Completed final sign-off Sep 2017 | 3860 26th St | unit #3: remodel (e) kitchen, same layout.Details
unit #3: remodel (e) kitchen, same layout. | $4,800 |
| Aug 18, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out.Details
revision to bpa#201704123815. relocate full bathroom, laundry at ground floor. relocate living room, bathroom , kitchen at 2nd floor per plan. no exterior changes - reconfigure lay out. | $4,000 |
| Jul 26, 2017 | Completed final sign-off Sep 2019 | 1423 27th Av | rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard.Details
rev. to pa#201308265168, re-layout 3 bathrooms, add (n) 3 level interior elevator & skylight, revise interior stairway. 2/f- remodel kitchen, 2 (e) bath, add (n) half bath. g/f- add (n) bedroom, office, theater, 1 (n) bath, remodel (e) bath. replace (2) vinyl windows, add side door to rear yard. | $150,000 |
| Apr 12, 2017 | Completed final sign-off Jun 2018 | 160 Bonview St | interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/fDetails
interior remodel, add a (n) bedroom, masterroom & full bath, convert storage to a gym room at g/f, remodel (e) kitchen, relocate (e) bath, add a (n) study and create interior stair at 2/f | $180,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2017 | 604 Church St | remodel unit on 2/f at rear: remodel kitchen & bathroom.Details
remodel unit on 2/f at rear: remodel kitchen & bathroom. | $12,000 |
| Dec 1, 2016 | Completed final sign-off Mar 2017 | 1256 34th Av | remove (e) partition wall between kitchen & diningDetails
remove (e) partition wall between kitchen & dining | $1,800 |
| Oct 14, 2016 | Completed final sign-off Jun 2017 | 500 Rockdale Dr | revision to permit 201510089217; re-arrange kitchen, dining rm, two bedrms, two bathrms, & re-wire electrical in living rm, dining rm & upgrade partial ceiling framing. all work at 2nd flr.Details
revision to permit 201510089217; re-arrange kitchen, dining rm, two bedrms, two bathrms, & re-wire electrical in living rm, dining rm & upgrade partial ceiling framing. all work at 2nd flr. | $2,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 43 Hillcrest Ct | remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor.Details
remodel existing kitchen, two bathroom, remvoe hall closet & re-wire elect in living room, dining room & upgrade partial ceiling framing. all work at 2nd floor. | $30,000 |
| Oct 8, 2015 | Completed final sign-off Jun 2017 | 500 Rockdale Dr | 1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per planDetails
1) relocate (e) kitchen, remodel (e) bathrm and add 1 new bathrm at 2/f per plan 2) reconfigure (e) side bay window and relocate (e) interior stair at 2/f per plan. 3) 3 new bedrms, 2 bathrms and 1 family rm to be constructed as g/f. 4) replace (e) windows per plan | $100,000 |
| Sep 8, 2015 | Completed final sign-off May 2016 | 2475 19th Av | add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street.Details
add 2 bedrooms, 2 bathrooms, 1 computer room, remove rear deck @ ground floor. add 1 bedroom, add 2 bathrooms, 1 office room, relocate kitchen & study room @ main (2nd) floor. all work interior, no work on street. | $45,000 |
| May 18, 2015 | Never finaled issued Jun 2015, no final | 725 Grant Av | interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl.Details
interior remodel of an extg a-2 occup restaurant on single floor only on grade at waverly place(bldg 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl. | $400,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 1367 41st Av | clear violation# 201459361, replace kitchen cabinet, counter top, install new appliances, replace (n) led insert, retiles to 2 bathroom,, 1 powder room, replace plumbing fixtures inc. w.c., faucet trim.Details
clear violation# 201459361, replace kitchen cabinet, counter top, install new appliances, replace (n) led insert, retiles to 2 bathroom,, 1 powder room, replace plumbing fixtures inc. w.c., faucet trim. | $12,000 |
| Mar 21, 2014 | Completed final sign-off Nov 2014 | 59 Cole St | interior remodeling: remodel existing kitchen and two bath rooms at 2nd floor of existing building. demolish non-bearing wall to make larger kitchen.Details
interior remodeling: remodel existing kitchen and two bath rooms at 2nd floor of existing building. demolish non-bearing wall to make larger kitchen. | $15,000 |
| Jul 23, 2013 | Completed final sign-off Apr 2014 | 2126 30th Av | 2nd floor: remodel kitchen, remodel bathroom, add one & a half bath. add home office. install (1) new skylight.Details
2nd floor: remodel kitchen, remodel bathroom, add one & a half bath. add home office. install (1) new skylight. | $45,000 |
| Aug 11, 2011 | Completed final sign-off Oct 2012 | 211 08th Av | interior remodel of ground floor unit (211 8th ave.): convert bathroom into master suite; rearrange living, dinning & kitchen; new storage room and add new bathroom.Details
interior remodel of ground floor unit (211 8th ave.): convert bathroom into master suite; rearrange living, dinning & kitchen; new storage room and add new bathroom. | $75,000 |
| Feb 19, 2010 | Completed final sign-off Jun 2010 | 210 Santa Ana Av | on 2nd. flr.: convert (e) closets into new bath for master bedroom; remodel (e) bath & kitchen; new plumbing & electrical fixtures.Details
on 2nd. flr.: convert (e) closets into new bath for master bedroom; remodel (e) bath & kitchen; new plumbing & electrical fixtures. | $20,000 |
| Apr 28, 2009 | Completed final sign-off Oct 2009 | 336 Ofarrell St | move kitchen and buffet area to another portion of the restaurant. build ramp to make all public areas of restaurant accessibleDetails
move kitchen and buffet area to another portion of the restaurant. build ramp to make all public areas of restaurant accessible | $50,000 |
| Jan 22, 2009 | Expired or cancelled expired May 2010 | 579 33rd Av | add partition wall between kitchen & dining rm at 2nd fl, re-arange bathrms location & delect storage rm at ground fl. revision under appl#200808118828.Details
add partition wall between kitchen & dining rm at 2nd fl, re-arange bathrms location & delect storage rm at ground fl. revision under appl#200808118828. | $8,000 |
| Jun 21, 2007 | Completed final sign-off Aug 2007 | 1682 Post St | reinstall (e) kitchen equipments after finish flooring. hood and ansul system will be under separate permit.Details
reinstall (e) kitchen equipments after finish flooring. hood and ansul system will be under separate permit. | $5,000 |
| May 9, 2007 | Completed final sign-off Jun 2007 | 797 Hampshire St | replace bathtub faucets + bathtub overflow on 2nd floor bathroom. change tile. (repair leak from bathtub into kitchen) & to comply with nov#200796017. replace 12 windows, elimimate mold formation.Details
replace bathtub faucets + bathtub overflow on 2nd floor bathroom. change tile. (repair leak from bathtub into kitchen) & to comply with nov#200796017. replace 12 windows, elimimate mold formation. | $5,000 |