Daaron Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 20 permits filed
59 permits since 2000: 41 completed, 13 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 2901 Geary Bl | 1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included.Details
1/fl- ti of an (e) ground level retail space. change of use from retail to pilates studio. (n) interior non structural partitions, finishes, lighting, millwork, a new stair and second exit. associated plumbing, mechanical , and electrical work is included. | $393,600 |
| Aug 17, 2026 | In progress issued Sep 2026 | 358 Dolores St | remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.lDetails
remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.l | $43,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 358 Dolores St | common area replacement of dry rot damaged/non-conforming 3 story wood framed rear exterior egress stairDetails
common area replacement of dry rot damaged/non-conforming 3 story wood framed rear exterior egress stair | $32,000 |
| Jul 7, 2026 | In progress issued Sep 2026 | 11 Kenneth Rexroth Pl | revision to bpa# 202210053814: update exterior stair configuration to roof deck. remove spiral stair to crawl space level. update elevator shaft & mechanical room. framing revision for stair. switch to tension cable for roof deckDetails
revision to bpa# 202210053814: update exterior stair configuration to roof deck. remove spiral stair to crawl space level. update elevator shaft & mechanical room. framing revision for stair. switch to tension cable for roof deck | |
| Jun 9, 2026 | In progress issued Aug 2026 | 619 Cayuga Av | remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers.Details
remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers. | $75,000 |
| May 21, 2026 | In progress issued Sep 2026 | 72 07th Av | revision to pa# 202512313048: remove lvl strengthening of existing girder due to stud wall support underneath girder. remove voluntary 2nd floor shear wall adj. to stair due to mep interference.Details
revision to pa# 202512313048: remove lvl strengthening of existing girder due to stud wall support underneath girder. remove voluntary 2nd floor shear wall adj. to stair due to mep interference. | |
| Mar 13, 2026 | In progress issued Apr 2026 | 2906 Cesar Chavez St | remove & replace (e) stair. replace w/new stair as per sec.1881.(a) and sec.188Details
remove & replace (e) stair. replace w/new stair as per sec.1881.(a) and sec.188 | $10,000 |
| Dec 31, 2025 | In progress issued Jan 2026 | 72 07th Av | convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floorDetails
convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floor | $108,000 |
| Oct 21, 2025 | Completed final sign-off Nov 2025 | 188 Noe St | revision to pa 202505166613 common entry stair replacement stair replacement to match existing stair riser height & tread; reattached to new guardrailDetails
revision to pa 202505166613 common entry stair replacement stair replacement to match existing stair riser height & tread; reattached to new guardrail | |
| Oct 14, 2025 | In progress issued Oct 2025 | 2479 Francisco St | exploritory holes to find source of interior leaks on multiple levels.Details
exploritory holes to find source of interior leaks on multiple levels. | $2,000 |
| Oct 7, 2025 | Expired or cancelled cancelled Jan 2026 | 190 Noe St | revision to 202508112736: replace 1 bathroom window, non street facing, existing opening no alterations to frame.Details
revision to 202508112736: replace 1 bathroom window, non street facing, existing opening no alterations to frame. | $400 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 188 Noe St | structural revision to bpa 202505166613 (entry stair). upgrade entry stair landing beam/framing, 2 support posts and 2 corner footings. minor modification to terrazzo stair support.Details
structural revision to bpa 202505166613 (entry stair). upgrade entry stair landing beam/framing, 2 support posts and 2 corner footings. minor modification to terrazzo stair support. | $6,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 678 Green St | exploratory demolition for sampling/replication of balcony components (guardrail, balustrades, balcony and corbels) to facilitate repair under bpa 202304135635. destructive evacuation/testing of guardrail & ballstrade. non-destructive/visual examiniations of balcony band/corbezsDetails
exploratory demolition for sampling/replication of balcony components (guardrail, balustrades, balcony and corbels) to facilitate repair under bpa 202304135635. destructive evacuation/testing of guardrail & ballstrade. non-destructive/visual examiniations of balcony band/corbezs | $10,000 |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 190 Noe St | bathroom remodel, new tub, sink vanity, floor and wall tiles.Details
bathroom remodel, new tub, sink vanity, floor and wall tiles. | $30,000 |
| May 16, 2025 | Completed final sign-off Nov 2025 | 188 Noe St | replacement and upgrade of (e) 1 story brink entry stair; new terrazo steps,wood framed stair walls & reinforced concrete foundations. upgrade stair handrail ref sfbc 1011.12.3 and sfpw 723.2Details
replacement and upgrade of (e) 1 story brink entry stair; new terrazo steps,wood framed stair walls & reinforced concrete foundations. upgrade stair handrail ref sfbc 1011.12.3 and sfpw 723.2 | $42,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2025 | 339 Waller St | rear facade:339-343 waller st.to comply w/ housing violation #201074550 item#3 & #4 structural repair of existing 3-story rear sunroom structure (in kind not to exceed 50% replacement)replace shingle of rear facade w/hardie plank siding. remove 4th floor rear deckDetails
rear facade:339-343 waller st.to comply w/ housing violation #201074550 item#3 & #4 structural repair of existing 3-story rear sunroom structure (in kind not to exceed 50% replacement)replace shingle of rear facade w/hardie plank siding. remove 4th floor rear deck | $46,000 |
| Mar 3, 2025 | Completed final sign-off May 2025 | 418 Mississippi St | remove stucco rougly 200 sf (less than 50%) on 2nd floor lightwell. replace with (n) stucco. not visible from street.Details
remove stucco rougly 200 sf (less than 50%) on 2nd floor lightwell. replace with (n) stucco. not visible from street. | $30,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 94 Los Palmos Dr | remodel (2) baths and hall at 2nd floor. add skylight. no exterior work visible from street.Details
remodel (2) baths and hall at 2nd floor. add skylight. no exterior work visible from street. | $50,000 |
| Dec 13, 2024 | In progress issued Jul 2025 | 11 Kenneth Rexroth Pl | rear horizontal addition. replace & enlarge (e) exterior stair, install 3 story elevator. add 255 sq. ft. private roof deck for top unit (11 kenneth). new spiral stair to crawl space level, relocate water heater. sprinkler per nfpa13 inside 11 kenneth pl under separate permit.Details
rear horizontal addition. replace & enlarge (e) exterior stair, install 3 story elevator. add 255 sq. ft. private roof deck for top unit (11 kenneth). new spiral stair to crawl space level, relocate water heater. sprinkler per nfpa13 inside 11 kenneth pl under separate permit. | $38,000 |
| Oct 7, 2024 | In progress issued Oct 2024 | 1133 19th St | replace anchorage of (e) glass guardrails at (4) decks. partial foundation upgrade of front bay adj to mississippi stDetails
replace anchorage of (e) glass guardrails at (4) decks. partial foundation upgrade of front bay adj to mississippi st | $48,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2024 | 2139 Polk St | unit #b change of use from nail salon to fitness studio (n) lighting, non bearing wall. patch & repair & paint. accessibility upgrades to interior floor & entry door hardware & operatorsDetails
unit #b change of use from nail salon to fitness studio (n) lighting, non bearing wall. patch & repair & paint. accessibility upgrades to interior floor & entry door hardware & operators | $56,577 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 673 04th Av | revision to permit 202307061565. revise garage beam to steel. modify footings.Details
revision to permit 202307061565. revise garage beam to steel. modify footings. | |
| Nov 16, 2023 | Completed final sign-off Mar 2024 | 301 Winfield St | revision to bpa#202009224687 to delete stair from 3/f to upper terrace of yard, change shingles to cement plaster @ rear elevationDetails
revision to bpa#202009224687 to delete stair from 3/f to upper terrace of yard, change shingles to cement plaster @ rear elevation | |
| Jun 13, 2023 | Completed final sign-off Jul 2023 | 218 11th Av | rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window.Details
rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window. | $8,000 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 783 28th Av | new deck over (e) roof located in southeast corner of rear structure over 2/f. removal of (1) rear window. no expansion of building envelope and deck is located in allowable bldg area. new solid parapet wall adj. to neighbor's bldg wall.Details
new deck over (e) roof located in southeast corner of rear structure over 2/f. removal of (1) rear window. no expansion of building envelope and deck is located in allowable bldg area. new solid parapet wall adj. to neighbor's bldg wall. | $30,000 |
| Apr 13, 2023 | In progress issued Apr 2026 | 678 Green St | existing front cantilever balcony to be replaced due to structural steel decay. decorative corbel to be replaced w/terra cotta. ballustrades, handrail, decorative band & deck to be reconstructed out of gfrp (glass fiber reinforced polymer) to replicate decorative features, finish & texture w/sfDetails
existing front cantilever balcony to be replaced due to structural steel decay. decorative corbel to be replaced w/terra cotta. ballustrades, handrail, decorative band & deck to be reconstructed out of gfrp (glass fiber reinforced polymer) to replicate decorative features, finish & texture w/sf | $58,000 |
| Mar 16, 2023 | Completed final sign-off Oct 2024 | 1124 Moraga St | interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain.Details
interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain. | $250,000 |
| Mar 10, 2023 | Completed final sign-off Jul 2023 | 783 28th Av | replacing rotted siding with new hardi siding approx 750sf. replacing (8) windows and (1) door in kind. all work at rear of building.Details
replacing rotted siding with new hardi siding approx 750sf. replacing (8) windows and (1) door in kind. all work at rear of building. | $10,000 |
| Feb 17, 2023 | Completed final sign-off Mar 2023 | 38 Nebraska St | in kind removal of existing siding that has dry rot install new waterproofing install new siding.Details
in kind removal of existing siding that has dry rot install new waterproofing install new siding. | $5,000 |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 187 16th Av | rev to pa# 2022-1212-8109 modify cantillver bay strengtheningDetails
rev to pa# 2022-1212-8109 modify cantillver bay strengthening | |
| Dec 12, 2022 | Completed final sign-off Mar 2023 | 187 16th Av | strenthening (3) (e) cantilever bays with steel braces to prevent deflection.Details
strenthening (3) (e) cantilever bays with steel braces to prevent deflection. | $18,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2022 | 742 43rd Av | 2 units: no alteration: bring 2 kitchen and 2 bath to codeDetails
2 units: no alteration: bring 2 kitchen and 2 bath to code | |
| Nov 15, 2021 | Never finaled issued Nov 2021, no final | 218 11th Av | dryrot repair, replace in kind, not visible from street: per correction notice by inspect. work is at rear of building and includes replacement of siding, studs and rim joist as needed.Details
dryrot repair, replace in kind, not visible from street: per correction notice by inspect. work is at rear of building and includes replacement of siding, studs and rim joist as needed. | $3,000 |
| Oct 28, 2021 | Completed final sign-off May 2022 | 185 Haight St | structural revision to 202106152451, reinforce garage header/support. revisions to cantilever support wallDetails
structural revision to 202106152451, reinforce garage header/support. revisions to cantilever support wall | $10,000 |
| Jun 15, 2021 | Completed final sign-off May 2022 | 185 Haight St | widen garage driveway, shift retaining wall supporting structure & front landscaping walls, driveway slope to be reconfigured, no work atpublic right of way.Details
widen garage driveway, shift retaining wall supporting structure & front landscaping walls, driveway slope to be reconfigured, no work atpublic right of way. | $55,000 |
| Apr 13, 2021 | Completed final sign-off Dec 2021 | 345 Texas St | residential rooms down for lower unit(345 texas st - 915 sf) new stair from 2/f to g/f. remodel g/f w/(1) bedroom; (1) bath infill g/f underneath (e) cantilevered popout structure.Details
residential rooms down for lower unit(345 texas st - 915 sf) new stair from 2/f to g/f. remodel g/f w/(1) bedroom; (1) bath infill g/f underneath (e) cantilevered popout structure. | $78,000 |
| Nov 3, 2020 | Completed final sign-off Nov 2020 | 563 06th Av | revision to pa 201902253683. remove underpinning 1.5-3. install mat slab between gl 1-3.Details
revision to pa 201902253683. remove underpinning 1.5-3. install mat slab between gl 1-3. | $15,000 |
| Sep 22, 2020 | Completed final sign-off Mar 2024 | 301 Winfield St | horizontal addition level 1-3, add habitable space @ 1st fl connected to fl above w/ new interior stair, add family rm & bathrm, new 2nd fl terrace over addition, new fl office & stair to rear yard.Details
horizontal addition level 1-3, add habitable space @ 1st fl connected to fl above w/ new interior stair, add family rm & bathrm, new 2nd fl terrace over addition, new fl office & stair to rear yard. | $175,000 |
| Jul 22, 2020 | Never finaled issued Sep 2020, no final | 345 Texas St | adu unit on g/f done under pa#202002114175. all structural and voluntary seismic work done under pa#201910225192. replace existing wood shakes and trim on front of the (e) house with 7" high beveled wood siding to match the original 7" high beveled wood siding paint. match the (e) wood trim with newDetails
adu unit on g/f done under pa#202002114175. all structural and voluntary seismic work done under pa#201910225192. replace existing wood shakes and trim on front of the (e) house with 7" high beveled wood siding to match the original 7" high beveled wood siding paint. match the (e) wood trim with new | $35,000 |
| Mar 12, 2020 | Completed final sign-off Dec 2021 | 345 Texas St | replace damaged rear yard retaining wall along northeast property line (bordering 337 texas street)Details
replace damaged rear yard retaining wall along northeast property line (bordering 337 texas street) | $23,000 |
| Feb 27, 2020 | Completed final sign-off Feb 2020 | 50 07th Av | revision to app#201810032138. delete windows, closet, powder room, kitchenette. kitchen door infill master to app#201810032138Details
revision to app#201810032138. delete windows, closet, powder room, kitchenette. kitchen door infill master to app#201810032138 | |
| Oct 22, 2019 | Completed final sign-off Dec 2021 | 345 Texas St | lower extg ground floor slab 12" at rear new ground floor shear walls. no alaterations to exterior or expansion of bldg envelope. new perimeter foundations at rear ground floor lateral upgrade per ab-94 standards.Details
lower extg ground floor slab 12" at rear new ground floor shear walls. no alaterations to exterior or expansion of bldg envelope. new perimeter foundations at rear ground floor lateral upgrade per ab-94 standards. | $80,000 |
| Oct 2, 2019 | Completed final sign-off Feb 2020 | 50 07th Av | revision to minor structural work due to field discovery shear walls at 1st/2nd level not aligned. see detail s-6.6 10/11 for 201810032138Details
revision to minor structural work due to field discovery shear walls at 1st/2nd level not aligned. see detail s-6.6 10/11 for 201810032138 | $1,000 |
| Feb 25, 2019 | Completed final sign-off May 2021 | 563 06th Av | create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roofDetails
create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roof | $50,000 |
| Jan 28, 2019 | Completed final sign-off Aug 2020 | 2242 15th St | replace (e) rear laundry porches in kind (all 3-floors) per plan, existing stairs to remain.Details
replace (e) rear laundry porches in kind (all 3-floors) per plan, existing stairs to remain. | $10,000 |
| Oct 15, 2018 | Expired or cancelled expired Mar 2026 | 599 Texas St | remove/replace (e) deck in backyard, replacing (2) (e) windows with french doors & remove (e) doorDetails
remove/replace (e) deck in backyard, replacing (2) (e) windows with french doors & remove (e) door | $10,000 |
| Oct 3, 2018 | Completed final sign-off Feb 2020 | 50 07th Av | revision to app#201802020198. revisions noted below: replace 1 story elevator with 1 story stair. add 1 full bath to 1st floor. renovate 1/2 bath on 2nd floor. replace 7 extg windows, 2 extg doors, add 3 new windows, none visible from street.Details
revision to app#201802020198. revisions noted below: replace 1 story elevator with 1 story stair. add 1 full bath to 1st floor. renovate 1/2 bath on 2nd floor. replace 7 extg windows, 2 extg doors, add 3 new windows, none visible from street. | |
| Aug 7, 2018 | Completed final sign-off Jul 2019 | 412 Texas St | replace (e) brick footing w/ reinforced conc. footing seismic retrofit g/f as per calf. existing building code 2016 chapter a-3Details
replace (e) brick footing w/ reinforced conc. footing seismic retrofit g/f as per calf. existing building code 2016 chapter a-3 | $70,000 |
| Jul 6, 2018 | Completed final sign-off Jan 2019 | 479 Vallejo St | repair framing & guardrail connections for 2 decks. pour new foundation below enclosed building area currently on blocksDetails
repair framing & guardrail connections for 2 decks. pour new foundation below enclosed building area currently on blocks | $25,000 |
| Apr 17, 2018 | Completed final sign-off Sep 2018 | 61 Prospect Av | structual revision to pa 2017-0308-0911 (soft story retrofit) replace concrete footings @ proposed shear wallsDetails
structual revision to pa 2017-0308-0911 (soft story retrofit) replace concrete footings @ proposed shear walls | $10,000 |
| Sep 29, 2017 | Completed final sign-off Jun 2018 | 1219 19th St | structural revision to pa #201701177238. memorialize as-built structural work.Details
structural revision to pa #201701177238. memorialize as-built structural work. | |
| Sep 15, 2017 | Completed final sign-off Jun 2018 | 330 Chenery St | replace the siding on the back sides as needed. the front wil nit be replaced. replace anydry rot if found. one of the sides (west facing)is visible to the street.Details
replace the siding on the back sides as needed. the front wil nit be replaced. replace anydry rot if found. one of the sides (west facing)is visible to the street. | $10,000 |
| Jun 9, 2017 | Completed final sign-off Sep 2017 | 530 Crescent Av | bathroom and kitchen remodel: new tiles, vanity, shower, toilet in hall bathroom. new kitchen cabinets, (2) new recessed lights in kitchen ceilingDetails
bathroom and kitchen remodel: new tiles, vanity, shower, toilet in hall bathroom. new kitchen cabinets, (2) new recessed lights in kitchen ceiling | $20,000 |
| Apr 6, 2017 | Completed final sign-off Jul 2017 | 166 Del Vale Av | proposed alterations include conversion of unconditioned garage space and conditioned storage space to conditioned home office space, the addition of an adjoining full bath and replacement of an extg window with a sliding patio door.Details
proposed alterations include conversion of unconditioned garage space and conditioned storage space to conditioned home office space, the addition of an adjoining full bath and replacement of an extg window with a sliding patio door. | $15,750 |
| Mar 8, 2017 | Completed final sign-off Sep 2018 | 61 Prospect Av | soft story lateral upgrade to comply with chapter 34b based on iebc 2012 appendex a-4 calculations.Details
soft story lateral upgrade to comply with chapter 34b based on iebc 2012 appendex a-4 calculations. | $45,000 |
| Feb 15, 2017 | Completed final sign-off Jun 2017 | 2008 Lyon St | bathroom remodel, new vanity, shower, recessed lights and tile. no structural work.Details
bathroom remodel, new vanity, shower, recessed lights and tile. no structural work. | $20,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2018 | 1219 19th St | lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor.Details
lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor. | $87,500 |
| Nov 4, 2016 | Completed final sign-off Jul 2017 | 166 Del Vale Av | bathroom remodel: new shower, vanity, cieling fan and two recessed cans; new tile.Details
bathroom remodel: new shower, vanity, cieling fan and two recessed cans; new tile. | $8,000 |
| Aug 2, 2016 | Completed final sign-off Dec 2016 | 249 Rolph St | repria dry rot under front porch. less than 50%Details
repria dry rot under front porch. less than 50% | $35,000 |