Daaron Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 20 permits filed
59 permits since 2000: 41 completed, 13 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 5 completed, 3 in progress, 1 expired or cancelled. Typically 17 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Sep 2026 | 358 Dolores St | remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.lDetails
remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.l | $43,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2025 | 339 Waller St | rear facade:339-343 waller st.to comply w/ housing violation #201074550 item#3 & #4 structural repair of existing 3-story rear sunroom structure (in kind not to exceed 50% replacement)replace shingle of rear facade w/hardie plank siding. remove 4th floor rear deckDetails
rear facade:339-343 waller st.to comply w/ housing violation #201074550 item#3 & #4 structural repair of existing 3-story rear sunroom structure (in kind not to exceed 50% replacement)replace shingle of rear facade w/hardie plank siding. remove 4th floor rear deck | $46,000 |
| Oct 7, 2024 | In progress issued Oct 2024 | 1133 19th St | replace anchorage of (e) glass guardrails at (4) decks. partial foundation upgrade of front bay adj to mississippi stDetails
replace anchorage of (e) glass guardrails at (4) decks. partial foundation upgrade of front bay adj to mississippi st | $48,000 |
| Jun 13, 2023 | Completed final sign-off Jul 2023 | 218 11th Av | rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window.Details
rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window. | $8,000 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 783 28th Av | new deck over (e) roof located in southeast corner of rear structure over 2/f. removal of (1) rear window. no expansion of building envelope and deck is located in allowable bldg area. new solid parapet wall adj. to neighbor's bldg wall.Details
new deck over (e) roof located in southeast corner of rear structure over 2/f. removal of (1) rear window. no expansion of building envelope and deck is located in allowable bldg area. new solid parapet wall adj. to neighbor's bldg wall. | $30,000 |
| Apr 13, 2023 | In progress issued Apr 2026 | 678 Green St | existing front cantilever balcony to be replaced due to structural steel decay. decorative corbel to be replaced w/terra cotta. ballustrades, handrail, decorative band & deck to be reconstructed out of gfrp (glass fiber reinforced polymer) to replicate decorative features, finish & texture w/sfDetails
existing front cantilever balcony to be replaced due to structural steel decay. decorative corbel to be replaced w/terra cotta. ballustrades, handrail, decorative band & deck to be reconstructed out of gfrp (glass fiber reinforced polymer) to replicate decorative features, finish & texture w/sf | $58,000 |
| Feb 25, 2019 | Completed final sign-off May 2021 | 563 06th Av | create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roofDetails
create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roof | $50,000 |
| Oct 15, 2018 | Expired or cancelled expired Mar 2026 | 599 Texas St | remove/replace (e) deck in backyard, replacing (2) (e) windows with french doors & remove (e) doorDetails
remove/replace (e) deck in backyard, replacing (2) (e) windows with french doors & remove (e) door | $10,000 |
| Jul 6, 2018 | Completed final sign-off Jan 2019 | 479 Vallejo St | repair framing & guardrail connections for 2 decks. pour new foundation below enclosed building area currently on blocksDetails
repair framing & guardrail connections for 2 decks. pour new foundation below enclosed building area currently on blocks | $25,000 |