Back to bathroom remodel contractors
Daaron Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 20 permits filed
59 permits since 2000: 41 completed, 13 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 2 in progress, 1 expired or cancelled. Typically 10 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | In progress issued Aug 2026 | 619 Cayuga Av | remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers.Details
remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers. | $75,000 |
| Dec 31, 2025 | In progress issued Jan 2026 | 72 07th Av | convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floorDetails
convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floor | $108,000 |
| Oct 7, 2025 | Expired or cancelled cancelled Jan 2026 | 190 Noe St | revision to 202508112736: replace 1 bathroom window, non street facing, existing opening no alterations to frame.Details
revision to 202508112736: replace 1 bathroom window, non street facing, existing opening no alterations to frame. | $400 |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 190 Noe St | bathroom remodel, new tub, sink vanity, floor and wall tiles.Details
bathroom remodel, new tub, sink vanity, floor and wall tiles. | $30,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 94 Los Palmos Dr | remodel (2) baths and hall at 2nd floor. add skylight. no exterior work visible from street.Details
remodel (2) baths and hall at 2nd floor. add skylight. no exterior work visible from street. | $50,000 |
| Jun 13, 2023 | Completed final sign-off Jul 2023 | 218 11th Av | rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window.Details
rev to pa# 202012080521: replace wood guardrail at 4th fl. front deck, add wet bar, modification to skylight, (2) rear rooms-office/media, remove bathroom window. | $8,000 |
| Mar 16, 2023 | Completed final sign-off Oct 2024 | 1124 Moraga St | interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain.Details
interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain. | $250,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2022 | 742 43rd Av | 2 units: no alteration: bring 2 kitchen and 2 bath to codeDetails
2 units: no alteration: bring 2 kitchen and 2 bath to code | |
| Apr 13, 2021 | Completed final sign-off Dec 2021 | 345 Texas St | residential rooms down for lower unit(345 texas st - 915 sf) new stair from 2/f to g/f. remodel g/f w/(1) bedroom; (1) bath infill g/f underneath (e) cantilevered popout structure.Details
residential rooms down for lower unit(345 texas st - 915 sf) new stair from 2/f to g/f. remodel g/f w/(1) bedroom; (1) bath infill g/f underneath (e) cantilevered popout structure. | $78,000 |
| Feb 25, 2019 | Completed final sign-off May 2021 | 563 06th Av | create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roofDetails
create additional habitable space on ground level to include (2) bathrooms, a bed rm, family rm, & laundry rm, reconfigure (e) stair to upper level, add outdoor deck on upper level on (e) roof | $50,000 |
| Oct 3, 2018 | Completed final sign-off Feb 2020 | 50 07th Av | revision to app#201802020198. revisions noted below: replace 1 story elevator with 1 story stair. add 1 full bath to 1st floor. renovate 1/2 bath on 2nd floor. replace 7 extg windows, 2 extg doors, add 3 new windows, none visible from street.Details
revision to app#201802020198. revisions noted below: replace 1 story elevator with 1 story stair. add 1 full bath to 1st floor. renovate 1/2 bath on 2nd floor. replace 7 extg windows, 2 extg doors, add 3 new windows, none visible from street. | |
| Jun 9, 2017 | Completed final sign-off Sep 2017 | 530 Crescent Av | bathroom and kitchen remodel: new tiles, vanity, shower, toilet in hall bathroom. new kitchen cabinets, (2) new recessed lights in kitchen ceilingDetails
bathroom and kitchen remodel: new tiles, vanity, shower, toilet in hall bathroom. new kitchen cabinets, (2) new recessed lights in kitchen ceiling | $20,000 |
| Apr 6, 2017 | Completed final sign-off Jul 2017 | 166 Del Vale Av | proposed alterations include conversion of unconditioned garage space and conditioned storage space to conditioned home office space, the addition of an adjoining full bath and replacement of an extg window with a sliding patio door.Details
proposed alterations include conversion of unconditioned garage space and conditioned storage space to conditioned home office space, the addition of an adjoining full bath and replacement of an extg window with a sliding patio door. | $15,750 |
| Feb 15, 2017 | Completed final sign-off Jun 2017 | 2008 Lyon St | bathroom remodel, new vanity, shower, recessed lights and tile. no structural work.Details
bathroom remodel, new vanity, shower, recessed lights and tile. no structural work. | $20,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2018 | 1219 19th St | lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor.Details
lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor. | $87,500 |
| Nov 4, 2016 | Completed final sign-off Jul 2017 | 166 Del Vale Av | bathroom remodel: new shower, vanity, cieling fan and two recessed cans; new tile.Details
bathroom remodel: new shower, vanity, cieling fan and two recessed cans; new tile. | $8,000 |