Block 2350, lot 001G
2300 22nd Ave
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 2
- Units
- 6
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 4,520 sq ft
- Lot
- 2,692 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off Oct 2025 | 2300 22nd Av | De Brus Construction Inc | revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a.Details
revision to 201709016796 r1 per field inspector's request, document location of water heater and furnaces for each unit 1st fl, eero windows for bedrooms on each unit 1st floor. no material change to previously approved p/a. | |
| Apr 16, 2024 | Completed final sign-off May 2024 | 2300 22nd Av | Firemex Solutions Inc. | revision to approved fire sprinkler plans pa# 2023-0706-1560 due to cancellation of south side of building as-built plans to modify sprinkler coverage to accommodate phase 1 architectural plans. phase 2 will require an additional sprinkler permit to be able to finalize phase 2.Details
revision to approved fire sprinkler plans pa# 2023-0706-1560 due to cancellation of south side of building as-built plans to modify sprinkler coverage to accommodate phase 1 architectural plans. phase 2 will require an additional sprinkler permit to be able to finalize phase 2. | |
| Nov 17, 2023 | Completed final sign-off May 2024 | 2300 22nd Av | Poly-On Security System Inc. | upgrade the (e) fire alarm system by replacing it with (1) addressable fire alarm unit (1) wireless communicator next to facu (4) addressable smoke detectors (3) addressable manual pull station (2) horn strobes (2) address monitor module (1) addressable control module (14) low frequency horns at allDetails
upgrade the (e) fire alarm system by replacing it with (1) addressable fire alarm unit (1) wireless communicator next to facu (4) addressable smoke detectors (3) addressable manual pull station (2) horn strobes (2) address monitor module (1) addressable control module (14) low frequency horns at all | $20,000 |
| Jul 20, 2023 | Completed final sign-off Nov 2023 | 2300 22nd Av | De Brus Construction Inc | revision to 201709016796. remove new footing from approved permit. eisting footing in good condition to remain.Details
revision to 201709016796. remove new footing from approved permit. eisting footing in good condition to remain. | |
| Jul 6, 2023 | Completed final sign-off May 2024 | 2300 22nd Av | Firemex Solutions Inc. | install automatic fire sprinkler system per nfpa 13 and 2" underground. ref to 201710030267Details
install automatic fire sprinkler system per nfpa 13 and 2" underground. ref to 201710030267 | $25,100 |
| Oct 7, 2022 | Completed final sign-off Dec 2022 | 2300 22nd Av | G R C Roofing Inc. | reroofingDetails
reroofing | $36,400 |
| Apr 4, 2022 | Completed final sign-off Jun 2022 | 2300 22nd Av | Casman Construction Inc | unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors.Details
unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors. | $30,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2300 22nd Av | Casman Construction Inc | unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paintDetails
unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paint | $25,000 |
| Oct 3, 2017 | Never finaled issued Jan 2023, no final | 2300 22nd Av | De Brus Construction Inc | selective demo and build back of (n) adu per ordiance #162-16. soft story under bp#201708316609. previous adu under #201709016796 (#7 and #8)Details
selective demo and build back of (n) adu per ordiance #162-16. soft story under bp#201708316609. previous adu under #201709016796 (#7 and #8) | $55,000 |
| Sep 1, 2017 | Completed final sign-off Nov 2025 | 2300 22nd Av | De Brus Construction Inc | selective demo of ground flr area in preparation for (n) adu's per ord no 162-16. mep & fire/life safety under separate permit.Details
selective demo of ground flr area in preparation for (n) adu's per ord no 162-16. mep & fire/life safety under separate permit. | $250,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2023 | 2300 22nd Av | De Brus Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 2, 2010 | Completed final sign-off Jan 2011 | 2300 22nd Av | D G M L Construction Inc | #4 - remove kitchen cabinets & replace with new ones, remove tile in bathroom with new traver tile. install new dishwasher, new toilet, new sink.Details
#4 - remove kitchen cabinets & replace with new ones, remove tile in bathroom with new traver tile. install new dishwasher, new toilet, new sink. | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.