Block 1199, lot 009
1530 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 4,710 sq ft
- Lot
- 3,781 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2025 | Completed final sign-off Jun 2025 | 1530 Hayes St | De Brus Construction Inc | to obtain final inspection for work approved under pa#200508160424 and pa#200508241136. all work is complete. (cc8580)Details
to obtain final inspection for work approved under pa#200508160424 and pa#200508241136. all work is complete. (cc8580) | |
| Mar 26, 2025 | Completed final sign-off Jun 2025 | 1530 Hayes St | De Brus Construction Inc | to comply with physical inspetion report cc-8580Details
to comply with physical inspetion report cc-8580 | |
| Jul 6, 2022 | Completed final sign-off Jun 2023 | 1530 Hayes St | De Brus Construction Inc | voluntary strengthening on ground fl, add steel moment frame/plywood shear walls. remove fireplace on ground floor, remove (e) posts/add new framing in garage. replace garage doors in kind w/wood garage doors, no change in size.Details
voluntary strengthening on ground fl, add steel moment frame/plywood shear walls. remove fireplace on ground floor, remove (e) posts/add new framing in garage. replace garage doors in kind w/wood garage doors, no change in size. | $100,000 |
| Jan 23, 2020 | Completed final sign-off Jun 2020 | 1532 Hayes St | Rua Woods Construction Inc | refresh master bath with wall hung toilet and inline drain (5x5 sq). hall bath -install new vanity and led cans sq is 6'x8' sq.Details
refresh master bath with wall hung toilet and inline drain (5x5 sq). hall bath -install new vanity and led cans sq is 6'x8' sq. | $1,000 |
| Jan 10, 2020 | Completed final sign-off Jan 2020 | 1530 Hayes St | Rua Woods Construction Inc | administrative permit to document the legal use of the building as a 4-story, 2 residential units. this is determination is based on a review of city records and a site visit. no work under this permit.Details
administrative permit to document the legal use of the building as a 4-story, 2 residential units. this is determination is based on a review of city records and a site visit. no work under this permit. | |
| Nov 21, 2016 | Completed final sign-off Dec 2016 | 1530 Hayes St | Rua Woods Construction Inc | install 4 new skylights in reference to app#201611183106 per inspectors request to document as built conditions. u-factor shall be 0.32 maxDetails
install 4 new skylights in reference to app#201611183106 per inspectors request to document as built conditions. u-factor shall be 0.32 max | $1,000 |
| Nov 18, 2016 | Completed final sign-off Dec 2016 | 1530 Hayes St | Rua Woods Construction Inc | revision to 201610180593 bld new storage closets. relocating (e) wall to enclose (e) vent pipe, replace (e) wall in kind enclosing heat vents, add fire rated sheetrock. all work in attic.Details
revision to 201610180593 bld new storage closets. relocating (e) wall to enclose (e) vent pipe, replace (e) wall in kind enclosing heat vents, add fire rated sheetrock. all work in attic. | $2,000 |
| Oct 18, 2016 | Completed final sign-off Dec 2016 | 1530 Hayes St | Rua Woods Construction Inc | replace 2 (e) windows on top floor with marvin full wood double hung windows (with ogee lugs on front), replace (e) inoperable skylights with operable skylights, no change to roof form.Details
replace 2 (e) windows on top floor with marvin full wood double hung windows (with ogee lugs on front), replace (e) inoperable skylights with operable skylights, no change to roof form. | $6,000 |
| Dec 10, 2013 | Completed final sign-off Dec 2013 | 1530 Hayes St | Nash's Construction | demo existing metal and tile exterior staircase. replace with wood framed victorian type stairs. same width & length.Details
demo existing metal and tile exterior staircase. replace with wood framed victorian type stairs. same width & length. | $2,500 |
| Jul 30, 2012 | Never finaled issued Jul 2012, no final | 1530 Hayes St | street spaceDetails
street space | ||
| Aug 24, 2005 | Expired or cancelled expired Jun 2025 | 1530 Hayes St | Kinann & Associates Construction | replace door & window with french door, remove portion of wall. fill opening,Details
replace door & window with french door, remove portion of wall. fill opening, | $5,000 |
| Aug 16, 2005 | Expired or cancelled expired Jun 2025 | 1530 Hayes St | Kinann Cnstruction | install new window, tile and sheetrock in bathroom.Details
install new window, tile and sheetrock in bathroom. | $18,000 |
| Feb 27, 2004 | Completed final sign-off Apr 2004 | 1530 Hayes St | remove/replace dry rotted deck/landing/stairs (widen/relocate to comply w/current code)Details
remove/replace dry rotted deck/landing/stairs (widen/relocate to comply w/current code) | $15,000 | |
| Jul 30, 2003 | Completed final sign-off Aug 2003 | 1530 Hayes St | Fidelity Roof Company | reroofingDetails
reroofing | $8,000 |
| May 3, 2001 | Completed final sign-off May 2001 | 1530 Hayes St | install (redhead)anchor bolts @ 4ft spacing. voluntary seismic upgrade.Details
install (redhead)anchor bolts @ 4ft spacing. voluntary seismic upgrade. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rua Woods Construction Inc (5), De Brus Construction Inc (3), Fidelity Roof Company, Kinann & Associates Construction, Kinann Cnstruction, Nash's Construction
- Architects
- Matt Baran
- Engineers
- Peter Yu
- Authorized agent-otherss
- David Kenneally, Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.