Block 2358, lot 012
2395 29th Ave
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 4
- Units
- 15
- Rooms
- 7 bedrooms, 15 bathrooms
- Building
- 12,367 sq ft
- Lot
- 3,249 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off May 2026 | 2395 29th Av | De Brus Construction Inc | dry rot repairs 100 sq ft, street visible, stucco removal between ground flr and 1st flr. repairs in kindDetails
dry rot repairs 100 sq ft, street visible, stucco removal between ground flr and 1st flr. repairs in kind | $5,000 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 2395 29th Av | Itu Construction | unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances.Details
unit #2: replace bathroom vanity, toilet, tile and bathroom shower valve. replace kitchen cabinets and applicances. | $25,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2019 | 2395 29th Av | Crime Watch Security Sys Llc | as built for fire alarm app#201906123227. add 2 more low frequency sounders in sleeping areas.Details
as built for fire alarm app#201906123227. add 2 more low frequency sounders in sleeping areas. | $1,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 2391 29th Av | per pa #201802222037s, add two addresses tp adi at b;pcl 2358, lot 012 as: 2391, 2393 29th ave.Details
per pa #201802222037s, add two addresses tp adi at b;pcl 2358, lot 012 as: 2391, 2393 29th ave. | ||
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 2391 29th Av | administration permit for change address on pa #201802222037s from 2395 29th ave to 2391, 2393 29th ave.Details
administration permit for change address on pa #201802222037s from 2395 29th ave to 2391, 2393 29th ave. | ||
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 2395 29th Av | Itu Construction | revision to app#201802222037. incorporate new hvac system.Details
revision to app#201802222037. incorporate new hvac system. | |
| Jun 12, 2019 | Completed final sign-off May 2025 | 2395 29th Av | Crime Watch Security Sys Llc | upgrading existing fire alarm system to include sprinkler monitoring and install low frequency sounders in all sleeping areas per sffc section 1103.7.6.1. ref pa #201802222037, ref sprinkler pa #201903114923.Details
upgrading existing fire alarm system to include sprinkler monitoring and install low frequency sounders in all sleeping areas per sffc section 1103.7.6.1. ref pa #201802222037, ref sprinkler pa #201903114923. | $27,000 |
| May 16, 2019 | Completed final sign-off Nov 2019 | 2395 29th Av | Itu Construction | revision to app#201804277595 and 201804277596 to create ada compliant restroom to commercial space, currently undergoing mandatory soft story retrofit. n/a for maherDetails
revision to app#201804277595 and 201804277596 to create ada compliant restroom to commercial space, currently undergoing mandatory soft story retrofit. n/a for maher | |
| Apr 10, 2019 | Completed final sign-off Oct 2019 | 2395 29th Av | Jim Parr Dba Plumbing | revision to 201903114923, install 2" dedicated fire service per nfpa 24. no other changes to systemDetails
revision to 201903114923, install 2" dedicated fire service per nfpa 24. no other changes to system | |
| Mar 11, 2019 | Completed final sign-off Oct 2019 | 2395 29th Av | Jim Parr Dba Plumbing | install new automatic wet-pipe sprinkler system to cover 1st floor new adu units and garage. nine new sprinklers per nfpa 13. also install new 2-inch comb fire service off of 6-inch main on 29th ave. per nfpa 24. ref pa #201802222037Details
install new automatic wet-pipe sprinkler system to cover 1st floor new adu units and garage. nine new sprinklers per nfpa 13. also install new 2-inch comb fire service off of 6-inch main on 29th ave. per nfpa 24. ref pa #201802222037 | $25,000 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 2395 29th Av | street spaceDetails
street space | ||
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 2395 29th Av | streetspaceDetails
streetspace | ||
| May 17, 2018 | Never finaled issued May 2018, no final | 2395 29th Av | Itu Construction | revision to 201803224343 for units 6 and 10. install 250 watt electric resistant heater to 1 bedroom existing heaters to remainDetails
revision to 201803224343 for units 6 and 10. install 250 watt electric resistant heater to 1 bedroom existing heaters to remain | |
| May 10, 2018 | Never finaled issued May 2018, no final | 2395 29th Av | Itu Construction | revision to 201802272341 units 1 and 3 remove 750 watt electric heater. install 250 and 500 watt electric restance heaterDetails
revision to 201802272341 units 1 and 3 remove 750 watt electric heater. install 250 and 500 watt electric restance heater | |
| Apr 27, 2018 | Completed final sign-off Nov 2019 | 2395 29th Av | Itu Construction | mandatory soft story retrofit per sfebc chapter 4d cebc appx a4 commercial residential ref - 201804277596Details
mandatory soft story retrofit per sfebc chapter 4d cebc appx a4 commercial residential ref - 201804277596 | $25,000 |
| Apr 27, 2018 | Completed final sign-off Nov 2019 | 2395 29th Av | Itu Construction | mandatory soft story retrofit per sfebc chapter 4d cebc appx a4 residential commercial ref - 201804277595Details
mandatory soft story retrofit per sfebc chapter 4d cebc appx a4 residential commercial ref - 201804277595 | $125,000 |
| Mar 22, 2018 | Never finaled filed Mar 2018, never issued | 2395 29th Av | interior remodel of apts. 6 and 10 (change from one-bdmm to two-bdm) with replacement of two existing vinyl windows with aluminum-clad-wood dh with true-divided-lite windows with grid patternDetails
interior remodel of apts. 6 and 10 (change from one-bdmm to two-bdm) with replacement of two existing vinyl windows with aluminum-clad-wood dh with true-divided-lite windows with grid pattern | ||
| Mar 22, 2018 | Completed final sign-off Jul 2018 | 2395 29th Av | Itu Construction | interior renovation and finishes at extg dwelling units 6 and 10 (at levels 3 and 4) and associated structural framing. perform dry rot repair. replace window n/a for maherDetails
interior renovation and finishes at extg dwelling units 6 and 10 (at levels 3 and 4) and associated structural framing. perform dry rot repair. replace window n/a for maher | $30,000 |
| Feb 27, 2018 | Never finaled issued Mar 2018, no final | 2395 29th Av | Itu Construction | interior renovation and finishes at (e) dwelling units 1 and 3 at levels 2 & 3. replace window in kind. ** maher: n/a **Details
interior renovation and finishes at (e) dwelling units 1 and 3 at levels 2 & 3. replace window in kind. ** maher: n/a ** | $20,000 |
| Feb 22, 2018 | Completed final sign-off Nov 2019 | 2395 29th Av | Itu Construction | add (2) new accessory dwelling units to garages at level one, per ordinance no 162-16 and 162-17.Details
add (2) new accessory dwelling units to garages at level one, per ordinance no 162-16 and 162-17. | $145,000 |
| Feb 24, 2017 | Completed final sign-off Aug 2017 | 2395 29th Av | Electric Tech Construction Inc | modify existing att micro site, replace 2 existing antennas with 2 new antennas at new location on roof, remove 6 rru 22s, 2 rruws & 1 rxait cabinet, add 4 new rru-11s, 2 rrus-32, 4 diplexers & 1 gps antenna. n/a ordinance #155-13Details
modify existing att micro site, replace 2 existing antennas with 2 new antennas at new location on roof, remove 6 rru 22s, 2 rruws & 1 rxait cabinet, add 4 new rru-11s, 2 rrus-32, 4 diplexers & 1 gps antenna. n/a ordinance #155-13 | $20,000 |
| Jan 6, 2017 | Completed final sign-off Feb 2017 | 2395 29th Av | Triton Tower Inc | to obtain a final inspection for work already approved under pa# 2010005253183, all work is completeDetails
to obtain a final inspection for work already approved under pa# 2010005253183, all work is complete | |
| Apr 5, 2011 | Never finaled issued Apr 2011, no final | 2395 29th Av | Mashal Builders & Contractors Inc | #5- kitchen remodeling, no walls will be removed, no windows to be changed, lighting will meet title 24 code. no door & no ceiling work on this permit.Details
#5- kitchen remodeling, no walls will be removed, no windows to be changed, lighting will meet title 24 code. no door & no ceiling work on this permit. | $9,500 |
| May 25, 2010 | Never finaled issued Jun 2010, no final | 2395 29th Av | Cba Site Services Inc. | a modification to an (e) unmanned telecomunication facility consisting of removing & replacing an (e) gsm 1900 cabinet & adding 1-(n) 3815 &2-(n) rru's (remote radio units) w/ fiber lines.Details
a modification to an (e) unmanned telecomunication facility consisting of removing & replacing an (e) gsm 1900 cabinet & adding 1-(n) 3815 &2-(n) rru's (remote radio units) w/ fiber lines. | $22,000 |
| May 7, 2009 | Completed final sign-off Oct 2009 | 2395 29th Av | Cba Site Services Inc. | modification to e unmanned telecommunication facility consisting of installing a n rbs 3518 radio cabinet. adding 4 new remeote radio units rrus, and adding 2 n batter backup cabinets with battery unitsDetails
modification to e unmanned telecommunication facility consisting of installing a n rbs 3518 radio cabinet. adding 4 new remeote radio units rrus, and adding 2 n batter backup cabinets with battery units | $4,800 |
| May 26, 2006 | Expired or cancelled cancelled Sep 2007 | 2395 29th Av | insallation of 2 microcell antennas with the associated equipment cabinet at grade level.Details
insallation of 2 microcell antennas with the associated equipment cabinet at grade level. | $45,000 | |
| Apr 14, 2006 | Never finaled issued Apr 2006, no final | 2395 29th Av | California Constrution Co | reroofingDetails
reroofing | $18,000 |
| Dec 16, 2004 | Completed final sign-off Jul 2005 | 2395 29th Av | Buchanan General Contracting Co | installation & operation of (1) pair of omni antennas mounted to an (e) bldg. the associatedDetails
installation & operation of (1) pair of omni antennas mounted to an (e) bldg. the associated | $60,000 |
| Aug 18, 2004 | Completed final sign-off Sep 2004 | 2395 29th Av | Frankie English Dba Doe Mabuhay Builders | cry rot repair in facing side of building.Details
cry rot repair in facing side of building. | $5,000 |
| Mar 8, 2004 | Never finaled issued Mar 2004, no final | 2395 29th Av | re enforce front of building for seismicDetails
re enforce front of building for seismic | $15,000 | |
| Oct 14, 2003 | Completed final sign-off Apr 2004 | 2395 29th Av | Jjj & K Inc./Dba: Alexander Company | replace 105 windows size for size. same place &location. visible from street, wood to vinyl.Details
replace 105 windows size for size. same place &location. visible from street, wood to vinyl. | $40,000 |
| Jun 23, 2003 | Never finaled issued Jun 2003, no final | 2395 29th Av | paint walls, refinish hardwood floors, tile bathroom, repair wall hangings, towel rack,pole in closeDetails
paint walls, refinish hardwood floors, tile bathroom, repair wall hangings, towel rack,pole in close | $1,125 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.