Ian Dunn
- License
- C27241
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C27241 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Openscope Studio
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Oct 2026
50 permits since 2000 (architect on 48 permits, authorized agent-others on 1 permit, engineer on 1 permit): 15 completed, 10 in progress, 12 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Appetite For Construction Inc (4), Precision Gen. Comm Contractors Inc (3), Fidelity Roof Company (2), Heuer Inc (2), L E C A Construction Llc (2), Xspace Builder (2), A/C Construction, Bay C T Construction Inc., Bay City Plumbing, Curtis Edward Dennison Landscapre Inc, Hildebrand Renovation, Itu Construction, John Sutti & Associates, Inc., Little Feet Renovation, Lmnop-Design Inc., Mrcc, Nerland Building And Restoration, Northern Sun Associates, Peak General Contractors Inc, Silverman Green Development, Trim Fit Constr. - O'reilly Engineering, Western Contractors
- Engineers
- Donald David (4), Dustin Muhn (3), David Hensel
- Authorized agents
- Dennison Curtis
Where they worked
- Single-family 8
- Multi-family (2-family, apartments) 30
- Commercial 9
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress filed Oct 2026, not yet issued | 466 Frederick St | construct a 2-story, 2 dwelling unit, type v structure at the rear of the property.Details
construct a 2-story, 2 dwelling unit, type v structure at the rear of the property. | $320,000 | |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 65 Ramona Av | revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard....Details
revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard.... | ||
| Apr 24, 2026 | In progress issued Jun 2026 | 57 Winfield St | Appetite For Construction Inc | revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath.Details
revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath. | $27,000 |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 263 Lee Av | demolish existing type 5b, 1-story church. | $50,000 | |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 263 Lee Av | erect new 3-story, type 5b, 3-unit residential building with 1-unit on level 2, 1-unit on level 3 and 1-adu on ground floor per state adu program.Details
erect new 3-story, type 5b, 3-unit residential building with 1-unit on level 2, 1-unit on level 3 and 1-adu on ground floor per state adu program. | $1,188,036 | |
| Jan 22, 2026 | In progress issued Mar 2026 | 57 Winfield St | Appetite For Construction Inc | replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced.Details
replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced. | $70,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 57 Winfield St | Appetite For Construction Inc | reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2.Details
reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2. | $125,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 57 Winfield St | Appetite For Construction Inc | add a laundry room to the garage & relocate existing washer & dryer.Details
add a laundry room to the garage & relocate existing washer & dryer. | $8,000 |
| Aug 29, 2025 | Completed final sign-off Jun 2026 | 2770 Lombard St | Precision Gen. Comm Contractors Inc | revision to pa #2019-1230-0982 revision 5 removes the east court from the scope of work.Details
revision to pa #2019-1230-0982 revision 5 removes the east court from the scope of work. | |
| Nov 7, 2024 | Completed final sign-off Jun 2026 | 2770 Lombard St | Precision Gen. Comm Contractors Inc | rev 201912300982- stairs to be repaired in kind.( less than 50%)Details
rev 201912300982- stairs to be repaired in kind.( less than 50%) | |
| Nov 17, 2023 | In progress issued Dec 2023 | 1964 Post St | Silverman Green Development | unit #3: bathroom remodel, no layout change, relocate kitchen to central living space add stackable washer/dryer, move electrical sub-panel from inside closet, wire kitchen, laundry. (n) office at kitchen.Details
unit #3: bathroom remodel, no layout change, relocate kitchen to central living space add stackable washer/dryer, move electrical sub-panel from inside closet, wire kitchen, laundry. (n) office at kitchen. | $40,000 |
| Sep 2, 2022 | Never finaled issued May 2023, no final | 418 Union St | Xspace Builder | the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4).Details
the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4). | $93,000 |
| Jul 12, 2022 | In progress issued Feb 2024 | 65 Ramona Av | Peak General Contractors Inc | remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear.Details
remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear. | $99,886 |
| Jul 11, 2022 | Never finaled issued Aug 2023, no final | 418 Union St | Xspace Builder | remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment.Details
remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment. | $365,000 |
| Jul 11, 2022 | Never finaled filed Jul 2022, never issued | 1318 Page St | addition of stair connecting garage at level 1 to upper unit at level 2; expand & remodel the kitchen at level 2, to remodel the bathroom at level 2, expand and remodel bedroom & ensuite bathroom at level 3, expand deck at level 4; add 1 adu at level 1 per ordinance 162-16 under separate permit.Details
addition of stair connecting garage at level 1 to upper unit at level 2; expand & remodel the kitchen at level 2, to remodel the bathroom at level 2, expand and remodel bedroom & ensuite bathroom at level 3, expand deck at level 4; add 1 adu at level 1 per ordinance 162-16 under separate permit. | $600,000 | |
| Apr 25, 2022 | Never finaled issued Apr 2022, no final | 1964 Post St | Trim Fit Constr. - O'reilly Engineering | unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior.Details
unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior. | $83,131 |
| Apr 25, 2022 | Never finaled filed Apr 2022, never issued | 1964 Post St | unit #3: split into 2 separate units. | $72,859 | |
| Apr 21, 2022 | Expired or cancelled cancelled Jan 2026 | 347 Eddy St | t.i. to add an accessible restroom, add an interior ramp to an (e) retail space and replace (e) store front doorsDetails
t.i. to add an accessible restroom, add an interior ramp to an (e) retail space and replace (e) store front doors | $126,500 | |
| Dec 1, 2021 | Expired or cancelled withdrawn Jan 2026 | 263 Lee Av | erect new 3-story, type vb, 2-unit residential building r-3 occupancy.Details
erect new 3-story, type vb, 2-unit residential building r-3 occupancy. | $600,000 | |
| Dec 1, 2021 | Expired or cancelled withdrawn Jan 2026 | 263 Lee Av | demolish existing type vb, 1-story church. | $42,200 | |
| Dec 18, 2020 | Expired or cancelled withdrawn Aug 2026 | 466 Frederick St | the scope of work is to add 2 detached accessory dwelling units to the rear yard.Details
the scope of work is to add 2 detached accessory dwelling units to the rear yard. | $250,000 | |
| Sep 1, 2020 | Completed final sign-off Nov 2023 | 3745 24th St | Heuer Inc | add 3 adu's to the ground floor per ordinance 162-16.Details
add 3 adu's to the ground floor per ordinance 162-16. | $300,000 |
| Dec 30, 2019 | Completed final sign-off Jun 2026 | 2770 Lombard St | Precision Gen. Comm Contractors Inc, Curtis Edward Dennison Landscapre Inc | exterior improvements: replace concrete paving w/ unit pav, planting, exterior landscape lighting & exterior fountain, paving, steps & railings. install site furnishings. reconfigure (e) irrigation.Details
exterior improvements: replace concrete paving w/ unit pav, planting, exterior landscape lighting & exterior fountain, paving, steps & railings. install site furnishings. reconfigure (e) irrigation. | $250,000 |
| Dec 30, 2019 | Never finaled issued Jan 2020, no final | 2770 Lombard St | installation of exterior ornamentation to restore historical characteristics of the building. maher naDetails
installation of exterior ornamentation to restore historical characteristics of the building. maher na | $75,000 | |
| Oct 9, 2019 | Completed final sign-off Sep 2023 | 927 Capp St | Western Contractors | rear bldg: per ord# 162-16 add one (n) accessory dwelling unit to rear garage bldg (n) sprinklers to (n) unit. voluntary seismic upgrade bpa# 2019-1008-3864.Details
rear bldg: per ord# 162-16 add one (n) accessory dwelling unit to rear garage bldg (n) sprinklers to (n) unit. voluntary seismic upgrade bpa# 2019-1008-3864. | $72,330 |
| Sep 27, 2019 | Never finaled issued Dec 2019, no final | 2770 Lombard St | Fidelity Roof Company | response to notice of enforcement# 2019015839 enf. inkind patch & repair using same material & texture to match (e) condition in preparation for painting. ** maher: n/a **Details
response to notice of enforcement# 2019015839 enf. inkind patch & repair using same material & texture to match (e) condition in preparation for painting. ** maher: n/a ** | $10,000 |
| Sep 27, 2019 | Never finaled issued Dec 2019, no final | 2770 Lombard St | Fidelity Roof Company | response to notice of enforcement# 2019015839 enf. chimney tops removed & rebuilt lower due to structure concerns. chimneys rebuilt using similar design & location preserving look & feel to previously (e). ** maher: n/a **Details
response to notice of enforcement# 2019015839 enf. chimney tops removed & rebuilt lower due to structure concerns. chimneys rebuilt using similar design & location preserving look & feel to previously (e). ** maher: n/a ** | $10,000 |
| Sep 24, 2019 | Never finaled filed Sep 2019, never issued | 661 Anderson St | legalization of dwelling unit installed w/o permit per ord# 43-14. no work to be perfored.Details
legalization of dwelling unit installed w/o permit per ord# 43-14. no work to be perfored. | ||
| Jul 13, 2018 | Expired or cancelled cancelled Nov 2020 | 2770 Lombard St | window replacement. repair & replace of roof, gutters & downspouts. stucco repair. replace exterior paving & planting. fountain repair.Details
window replacement. repair & replace of roof, gutters & downspouts. stucco repair. replace exterior paving & planting. fountain repair. | $2,000,000 | |
| Jun 26, 2018 | Expired or cancelled withdrawn Jun 2022 | 377 Elsie St | Nerland Building And Restoration | rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections.Details
rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections. | $75,000 |
| Jun 5, 2018 | Completed final sign-off Nov 2020 | 466 Frederick St | Heuer Inc | add units per ord 162-16. add 1 bedroom, 1 bath unit to storage area at the rear portion of the basement per adu ordiance# 162-16.Details
add units per ord 162-16. add 1 bedroom, 1 bath unit to storage area at the rear portion of the basement per adu ordiance# 162-16. | $68,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 2395 29th Av | Itu Construction | revision to 201802272341 units 1 and 3 remove 750 watt electric heater. install 250 and 500 watt electric restance heaterDetails
revision to 201802272341 units 1 and 3 remove 750 watt electric heater. install 250 and 500 watt electric restance heater | |
| Feb 6, 2018 | Completed final sign-off Mar 2021 | 2346 Union St | L E C A Construction Llc | separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16.Details
separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16. | $20,000 |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 888 Valencia St | Bay City Plumbing | revision to pa#201704053247 & 201708114616, new stackable washer/dryer & new hot water heater. n/a ordinance #155-13, maher n/a.Details
revision to pa#201704053247 & 201708114616, new stackable washer/dryer & new hot water heater. n/a ordinance #155-13, maher n/a. | $3,000 |
| Sep 26, 2017 | Completed final sign-off Jul 2020 | 517 17th Av | Mrcc | add a (n) dwelling unit at the rear portion of the ground floor (studio unit)Details
add a (n) dwelling unit at the rear portion of the ground floor (studio unit) | $40,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2021 | 2350 Union St | L E C A Construction Llc | front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16.Details
front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16. | $125,000 |
| May 2, 2017 | Completed final sign-off May 2019 | 4495 Mission St | Hildebrand Renovation | change of use. t.i: remove (e) restroom & water heater. new accessible restroom, employee locker rooms, dishwashing room & dry storage room. new secondary storage mezzanine. new serving counter and coffee prep area.Details
change of use. t.i: remove (e) restroom & water heater. new accessible restroom, employee locker rooms, dishwashing room & dry storage room. new secondary storage mezzanine. new serving counter and coffee prep area. | $40,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2018 | 79 09th St | John Sutti & Associates, Inc., Lmnop-Design Inc. | change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors.Details
change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors. | $150,000 |
| Dec 21, 2016 | Expired or cancelled withdrawn Feb 2019 | 57 Rosemont Pl | add two new accessory dwelling units to the rear portion of the garage and basement space per ordinance# 162-16.Details
add two new accessory dwelling units to the rear portion of the garage and basement space per ordinance# 162-16. | $100,000 | |
| Dec 21, 2016 | Completed final sign-off May 2023 | 1553 45th Av | Little Feet Renovation | site permit to add 1 new accessory dwelling unit to garage space per add unit ordinance 162-16. ** maher: n/a **Details
site permit to add 1 new accessory dwelling unit to garage space per add unit ordinance 162-16. ** maher: n/a ** | $50,000 |
| Dec 21, 2016 | Expired or cancelled disapproved Dec 2018 | 550 Moultrie St | site permit to remodel portions of levels 1 & 2 with minor structural work. construct a 1 story addition to the rear of the (e) residence.Details
site permit to remodel portions of levels 1 & 2 with minor structural work. construct a 1 story addition to the rear of the (e) residence. | $30,000 | |
| Sep 29, 2015 | Expired or cancelled cancelled Jan 2026 | 843 Dolores St | #843 - add downstairs shower, remvoe stairs, add sleeping area. #845 - remodel bathrooms, add closet space, enlarge bedroom, extend exterior deck & replace window in ne bedroom with door to deck.Details
#843 - add downstairs shower, remvoe stairs, add sleeping area. #845 - remodel bathrooms, add closet space, enlarge bedroom, extend exterior deck & replace window in ne bedroom with door to deck. | $40,000 | |
| Aug 21, 2015 | Completed final sign-off Apr 2018 | 1826 15th St | Bay C T Construction Inc. | add unit per ordinance #30-15. adding a new dwelling unit to unused storage space behind ground floor garage. not legalizing unit just add a new unitDetails
add unit per ordinance #30-15. adding a new dwelling unit to unused storage space behind ground floor garage. not legalizing unit just add a new unit | $84,000 |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 917 Folsom St | A/C Construction | ground fl: restore concealed window and transom openings with fixed picture windows at primary facade of mixed use building; no other exterior work. n/a maher ordinanceDetails
ground fl: restore concealed window and transom openings with fixed picture windows at primary facade of mixed use building; no other exterior work. n/a maher ordinance | $4,000 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 300 Ivy St | Northern Sun Associates | site fence with wood posts & fencing 8' high & 31' long. n/a maher ordinanceDetails
site fence with wood posts & fencing 8' high & 31' long. n/a maher ordinance | $10,500 |
| Mar 28, 2014 | Expired or cancelled cancelled Jan 2026 | 300 Ivy St | erect a non-electric single faced wall sign. compliance with ordinance #155-13 not requiredDetails
erect a non-electric single faced wall sign. compliance with ordinance #155-13 not required | $500 | |
| Mar 28, 2014 | Expired or cancelled cancelled Jan 2026 | 300 Ivy St | erect a non-electric double faced projecting sign. compliance with ordinance #155-13 not requiredDetails
erect a non-electric double faced projecting sign. compliance with ordinance #155-13 not required | $500 | |
| Mar 28, 2014 | Expired or cancelled cancelled Jan 2026 | 300 Ivy St | erect a non-electric single faced wall sign. compliance with ordinance #155-13 not requiredDetails
erect a non-electric single faced wall sign. compliance with ordinance #155-13 not required | $500 | |
| Jan 29, 2014 | Never finaled issued Mar 2014, no final | 300 Ivy St | retail tenant improvment for clothing store inexisting building. work includes partial height interior partitions for fitting room & stock room, cabinetry & lighting. compliance with ordinance #155-13 not requiredDetails
retail tenant improvment for clothing store inexisting building. work includes partial height interior partitions for fitting room & stock room, cabinetry & lighting. compliance with ordinance #155-13 not required | $20,000 | |
| Oct 22, 2013 | Expired or cancelled withdrawn Aug 2014 | 1417 15th St | existing office kitchen to be upgraded to commercial kitchen.Details
existing office kitchen to be upgraded to commercial kitchen. | $30,000 |