James Mogannam
- License
- 3957
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Kpff
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Sep 2025
7 permits since 2000 (engineer on 7 permits): 3 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Charles Pankow Builders Ltd, Gci, Inc, Kaiser Foundation Health Plan Inc, Principal Builders Inc., Rossi Builders Inc., Sandbank Construction, Inc, Vallee Builders Inc
- Architects
- Brian Koshley, Jason Brabo, Merrick Lentz
- Engineers
- Jesse Avery, Mark Steinke, Reed Jackson, Stacey Lin, Stephen Shaffer
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 5
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2025 | Completed final sign-off Apr 2026 | 3319 Sacramento St | Vallee Builders Inc | expand (e) 2636 sf of personal service by incorporation 1308 sf of adjacent suite. work includes new floor structure, ramps, partitions, storefront, finishes, lighting & associated mechanical, plumbing & electrical scope.Details
expand (e) 2636 sf of personal service by incorporation 1308 sf of adjacent suite. work includes new floor structure, ramps, partitions, storefront, finishes, lighting & associated mechanical, plumbing & electrical scope. | $400,000 |
| May 1, 2025 | In progress issued Jul 2025 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room.Details
modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room. | $1,800,000 |
| Jan 31, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | 5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbingDetails
5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing | $800,000 |
| Nov 21, 2020 | Never finaled issued Dec 2022, no final | 1234 Jones St | Sandbank Construction, Inc | structural repair & stabilization of 1 bay window along pleasant street.Details
structural repair & stabilization of 1 bay window along pleasant street. | $40,000 |
| Aug 4, 2020 | Completed final sign-off Mar 2021 | 131 Steuart St | Charles Pankow Builders Ltd | voluntary seismic strengthening of existing steel lateral system & limited to corrections to steel braced frame detailing at the ground level of the bldg for improved ductility & seismic performance. not a full retrofit nor intend to bring structure up to the current code level.Details
voluntary seismic strengthening of existing steel lateral system & limited to corrections to steel braced frame detailing at the ground level of the bldg for improved ductility & seismic performance. not a full retrofit nor intend to bring structure up to the current code level. | $95,000 |
| Nov 15, 2018 | Completed final sign-off Apr 2019 | 559 Clay St | Rossi Builders Inc. | permeation grouting in basement. n/a for maher.Details
permeation grouting in basement. n/a for maher. | $75,000 |
| Aug 9, 2017 | Never finaled filed Aug 2017, never issued | 301 Brannan St | Principal Builders Inc. | replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generatorDetails
replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generator | $300,000 |