Block 3788, lot 037
301 Brannan St
- City’s use
- Commercial Office
- Built
- 1909
- Stories
- 6
- Rooms
- 10 bathrooms
- Building
- 80,640 sq ft
- Lot
- 17,000 sq ft
- Zoning
- MUO
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
78 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2023 | Completed final sign-off May 2024 | 301 Brannan St | Gci, Inc | repair of corroded steel beams below sidewalk along 3rd st. repair work includes removal of corroded material, welding new steel wt sections to existing beams and installation of mid-span support posts w/new spread footings.Details
repair of corroded steel beams below sidewalk along 3rd st. repair work includes removal of corroded material, welding new steel wt sections to existing beams and installation of mid-span support posts w/new spread footings. | $200,000 |
| Jul 21, 2021 | Completed final sign-off Aug 2021 | 301 Brannan St | Pacific Auxiliary Fire Alarm | floors 5 and 6: fire alarm ti: as built record drawings for job permit app#202012161183Details
floors 5 and 6: fire alarm ti: as built record drawings for job permit app#202012161183 | |
| Jul 21, 2021 | Completed final sign-off Aug 2021 | 301 Brannan St | Pacific Auxiliary Fire Alarm | fire alarm ti: as built record drawings for job permit app#202103166685Details
fire alarm ti: as built record drawings for job permit app#202103166685 | |
| Jul 6, 2021 | Completed final sign-off Nov 2021 | 301 Brannan St | Rylko Builders Inc. | all floors: power, lighting, and signal. new duct and grilles from existing system to serve new phone rooms ref 202105120261Details
all floors: power, lighting, and signal. new duct and grilles from existing system to serve new phone rooms ref 202105120261 | $127,481 |
| Jun 29, 2021 | Completed final sign-off Oct 2021 | 301 Brannan St | Pacific Auxiliary Fire Alarm | flrs 2-6: fire alarm t.i: adding 14 strobes to existing notifier nfs2-640 fa system. ref pa 202105120261Details
flrs 2-6: fire alarm t.i: adding 14 strobes to existing notifier nfs2-640 fa system. ref pa 202105120261 | $11,800 |
| Jun 22, 2021 | Completed final sign-off Sep 2021 | 301 Brannan St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 18 pendent sprinklers in new phone booths between 2nd and 6th floors. t.i. # 2021-0512-0261Details
fire sprinklers; relocate 18 pendent sprinklers in new phone booths between 2nd and 6th floors. t.i. # 2021-0512-0261 | $9,975 |
| May 12, 2021 | Completed final sign-off Sep 2021 | 301 Brannan St | Rylko Builders Inc. | floors 2-6: add 14 phone rooms to existing open office spaceDetails
floors 2-6: add 14 phone rooms to existing open office space | |
| May 10, 2021 | Completed final sign-off Jun 2021 | 301 Brannan St | Golden Gate Fire Protection Inc | fire sprinklers; as-built to permit #2020-1216-1177. add notes from inspector for final inspection. t.i. ref # 2020-0722-0619Details
fire sprinklers; as-built to permit #2020-1216-1177. add notes from inspector for final inspection. t.i. ref # 2020-0722-0619 | $1,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2021 | 301 Brannan St | Golden Gate Fire Protection Inc | as-built to 2020-1028-7661. relocate 25 pendent sprinklers on the 5th floor in the t-bar around the core. relocate 31 pendent sprinklers on the 6th floor in the t-bar around the core. t.i. # 2020-0722-0619Details
as-built to 2020-1028-7661. relocate 25 pendent sprinklers on the 5th floor in the t-bar around the core. relocate 31 pendent sprinklers on the 6th floor in the t-bar around the core. t.i. # 2020-0722-0619 | $1,000 |
| Mar 16, 2021 | Completed final sign-off Aug 2021 | 301 Brannan St | Pacific Auxiliary Fire Alarm | fire alarm t.i.: adding (1) smoke detector, (7) relay modules, (3) pull stations, (8) strobes and (100) horn-strobes to existing notifier nfs2-640 fire alarm system. arch 2020-0902-3298Details
fire alarm t.i.: adding (1) smoke detector, (7) relay modules, (3) pull stations, (8) strobes and (100) horn-strobes to existing notifier nfs2-640 fire alarm system. arch 2020-0902-3298 | $52,158 |
| Dec 16, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Pacific Auxiliary Fire Alarm | fire alarm t.i.: adding (3) smoke detectors, (2) relay modules, (5) strobes and (58) horn-strobes to existing notifier nfs2-640 fire alarm system.Details
fire alarm t.i.: adding (3) smoke detectors, (2) relay modules, (5) strobes and (58) horn-strobes to existing notifier nfs2-640 fire alarm system. | $20,862 |
| Dec 16, 2020 | Completed final sign-off Jun 2021 | 301 Brannan St | Golden Gate Fire Protection Inc | fire sprinkler only - ref # 2020-0722-0619; relocate 69 perndents & 23 uprights for all 4 floors (1st-4th) for knotel.Details
fire sprinkler only - ref # 2020-0722-0619; relocate 69 perndents & 23 uprights for all 4 floors (1st-4th) for knotel. | $46,000 |
| Oct 28, 2020 | Completed final sign-off Jun 2022 | 301 Brannan St | Golden Gate Fire Protection Inc | fire sprinkler only (2020-0722-0619) - relocate 14 pendents $ 10 uprights for the 5th floor. relocate 16 pendents & 11 uprights for the 6th floor of knotel.Details
fire sprinkler only (2020-0722-0619) - relocate 14 pendents $ 10 uprights for the 5th floor. relocate 16 pendents & 11 uprights for the 6th floor of knotel. | $25,500 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | level 6: mechanical: demo & new duct, rebalance 10 shp, add new vrv unit. elctDetails
level 6: mechanical: demo & new duct, rebalance 10 shp, add new vrv unit. elct | $350,000 | |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | 1/f & roof: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. demo & safe off (e) generator on roof. ref pa202009023298. maher n/aDetails
1/f & roof: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. demo & safe off (e) generator on roof. ref pa202009023298. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Dec 2021 | 301 Brannan St | Rylko Builders Inc. | 5/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009144164. maher n/aDetails
5/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009144164. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | level 2: demo & add new duct work & grilles to (e) wshp, rebalance (e) whsp zones, add (n) vrv unit to serve it room. power & lgihting & data. reference pa #2020-0902-3298.Details
level 2: demo & add new duct work & grilles to (e) wshp, rebalance (e) whsp zones, add (n) vrv unit to serve it room. power & lgihting & data. reference pa #2020-0902-3298. | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | 4/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. add (n) osa supply. ref pa202009023298. maher n/aDetails
4/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. add (n) osa supply. ref pa202009023298. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | 3/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009023298. maher n/aDetails
3/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009023298. maher n/a | $350,000 |
| Sep 14, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | 5th-6th fl: demo of non-structural walls, glazing, ceiling & millwork. construction of new millwork, new finishes. mep deferred.Details
5th-6th fl: demo of non-structural walls, glazing, ceiling & millwork. construction of new millwork, new finishes. mep deferred. | $690,000 |
| Sep 2, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | Rylko Builders Inc. | demo non-structural partitions, glazing, ceiling & millwork. new millwork, finishes, ceilings. new restrooms. mep deferred.Details
demo non-structural partitions, glazing, ceiling & millwork. new millwork, finishes, ceilings. new restrooms. mep deferred. | $800,000 |
| Jul 22, 2020 | Expired or cancelled withdrawn Sep 2020 | 301 Brannan St | Rylko Builders Inc. | non-structural commercial t.i. floor 1-4, mep under separate permit demo of non-structural wall, glazing, ceilings & millwork, finishes, ceilings, restrooms. nochange in occupancy in building.Details
non-structural commercial t.i. floor 1-4, mep under separate permit demo of non-structural wall, glazing, ceilings & millwork, finishes, ceilings, restrooms. nochange in occupancy in building. | $2,000,000 |
| Feb 15, 2019 | Completed final sign-off Feb 2019 | 301 Brannan St | Pacific Auxiliary Fire Alarm | fire alarm scope 4 new duct detectors, 2 ond 3rd fl, 2 on 4th flDetails
fire alarm scope 4 new duct detectors, 2 ond 3rd fl, 2 on 4th fl | $5,000 |
| Jan 29, 2019 | Completed final sign-off Mar 2019 | 301 Brannan St | Acco Engineered Systems Inc. Dba Acco En | rev to pa# 201812198701; removed scope of work from 5th fl. units on 5th fl. will not be replaced. n/a maherDetails
rev to pa# 201812198701; removed scope of work from 5th fl. units on 5th fl. will not be replaced. n/a maher | |
| Jan 24, 2019 | Completed final sign-off Feb 2019 | 301 Brannan St | Novo Construction Inc | new 2hr fire rated partition at the existing skybridges connecting the 2nd and 3rd floors between 301 brannan street and 634 2nd streetDetails
new 2hr fire rated partition at the existing skybridges connecting the 2nd and 3rd floors between 301 brannan street and 634 2nd street | $10,000 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 301 Brannan St | Acco Engineered Systems Inc. Dba Acco En | demo (e) wshp units & replace with like units on 2rd, 4th, & 5th fl. maher naDetails
demo (e) wshp units & replace with like units on 2rd, 4th, & 5th fl. maher na | $298,000 |
| Dec 12, 2017 | Completed final sign-off Feb 2018 | 301 Brannan St | Principal Builders Inc. | 2nd floor - relocation of t-24 lighting fixtures in existing tenant space . ref pa #201710161330 for ti work. n/a maher ordinanceDetails
2nd floor - relocation of t-24 lighting fixtures in existing tenant space . ref pa #201710161330 for ti work. n/a maher ordinance | $13,440 |
| Dec 1, 2017 | Completed final sign-off Jan 2018 | 301 Brannan St | Principal Builders Inc. | 2nd fl: revision to pa #201710161330 to remove card reader from scope of work. maher naDetails
2nd fl: revision to pa #201710161330 to remove card reader from scope of work. maher na | |
| Dec 1, 2017 | Completed final sign-off Jan 2018 | 301 Brannan St | Principal Builders Inc. | 3rd-6th fl: revision to pa #201706280567 to remove card readers from scope of work. maher naDetails
3rd-6th fl: revision to pa #201706280567 to remove card readers from scope of work. maher na | |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 301 Brannan St | Pribuss Engineering Inc | fire sprinkler tenant improvement relocate 1, add, 1. ref 201706280567Details
fire sprinkler tenant improvement relocate 1, add, 1. ref 201706280567 | $1,028 |
| Oct 16, 2017 | Completed final sign-off Jan 2018 | 301 Brannan St | Principal Builders Inc. | 2/f lobby- selective demo of non-structural partitions, doors, ceilings, lights & finishes. new construction of non structural partitions, doors, ceiling, light fixtures and finishes. ada improvements in rr 2nd floor. n/a ordinance #155-13Details
2/f lobby- selective demo of non-structural partitions, doors, ceilings, lights & finishes. new construction of non structural partitions, doors, ceiling, light fixtures and finishes. ada improvements in rr 2nd floor. n/a ordinance #155-13 | $18,000 |
| Sep 29, 2017 | Completed final sign-off May 2021 | 301 Brannan St | Phoenix Electric Co. | subsidewalk basement roof repair to install traffic signal pole foundation and installation of new pedestrian light pole. maher naDetails
subsidewalk basement roof repair to install traffic signal pole foundation and installation of new pedestrian light pole. maher na | $60,000 |
| Aug 31, 2017 | Completed final sign-off Oct 2017 | 301 Brannan St | Pribuss Engineering Inc | g/f, 3/f to 6/f- fire sprinkler t.i. relocate 16 heads & add 11 heads. total 27 heads. n/a ordinance #155-13 t.i. pa#201706280567Details
g/f, 3/f to 6/f- fire sprinkler t.i. relocate 16 heads & add 11 heads. total 27 heads. n/a ordinance #155-13 t.i. pa#201706280567 | $13,878 |
| Aug 9, 2017 | Never finaled filed Aug 2017, never issued | 301 Brannan St | Principal Builders Inc. | replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generatorDetails
replace existing generator on roof to accomodate it equipment load and connect fuel oil line to existing life safety generator | $300,000 |
| Aug 3, 2017 | Completed final sign-off Nov 2017 | 301 Brannan St | Pacific Auxiliary Fire Alarm | 1st floor:adding to extg nfs2-640, 1 horn/strobe, 1 smoke detector, and 1 control module, 1 extg horn strobe is being relocated. n/a for maher. bldg ref app#201706280561Details
1st floor:adding to extg nfs2-640, 1 horn/strobe, 1 smoke detector, and 1 control module, 1 extg horn strobe is being relocated. n/a for maher. bldg ref app#201706280561 | $7,578 |
| Jun 28, 2017 | Completed final sign-off Feb 2018 | 301 Brannan St | Principal Builders Inc. | demolition of non-structural partitions, doors, ceiling, lighting and finishes. construction of new non structural partitions, doors, ceilings, lighting and finishes. n/a for maher.Details
demolition of non-structural partitions, doors, ceiling, lighting and finishes. construction of new non structural partitions, doors, ceilings, lighting and finishes. n/a for maher. | $282,480 |
| Jun 28, 2017 | Completed final sign-off Feb 2018 | 301 Brannan St | Principal Builders Inc. | 3rd,4th,5th & 6th floors:demolition of non-structural partitions, doors, ceiling, lighting and finishes. construction of new non structural partitions, doors, ceilings, lighting and finishes. n/a for maher.Details
3rd,4th,5th & 6th floors:demolition of non-structural partitions, doors, ceiling, lighting and finishes. construction of new non structural partitions, doors, ceilings, lighting and finishes. n/a for maher. | $60,000 |
| May 26, 2017 | Completed final sign-off Sep 2017 | 301 Brannan St | Pacific Auxiliary Fire Alarm | 3rd,4th, & 5th floor: as part of heat pump replacement project. 6 new duct detectors with remote led annunciators are being added to extg notifier. nfs2-640. ref app#201705096032. n/a for maherDetails
3rd,4th, & 5th floor: as part of heat pump replacement project. 6 new duct detectors with remote led annunciators are being added to extg notifier. nfs2-640. ref app#201705096032. n/a for maher | $6,700 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 301 Brannan St | Acco Engineered Systems Inc. Dba Acco En | demo existing wshp units & replace with new like units on 3rd, 4th 5th floors. n/a for maher.Details
demo existing wshp units & replace with new like units on 3rd, 4th 5th floors. n/a for maher. | $250,000 |
| Apr 4, 2017 | Completed final sign-off Sep 2017 | 301 Brannan St | Pacific Auxiliary Fire Alarm | 1/f 2/f 6/f- replace heat pump with like for like on 1/f, 2/f & 6/f. 1/f: no new fire alarm devices, (e) duct detector. 2/f: 6 new duct detectors with control shut down relay & add remote ann. 6/f: 2 new duct detectors with control shutdown relay and add remote ann. n/a maherDetails
1/f 2/f 6/f- replace heat pump with like for like on 1/f, 2/f & 6/f. 1/f: no new fire alarm devices, (e) duct detector. 2/f: 6 new duct detectors with control shut down relay & add remote ann. 6/f: 2 new duct detectors with control shutdown relay and add remote ann. n/a maher | $7,860 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 301 Brannan St | Pacific Auxiliary Fire Alarm | revision to fire alarm permit 201702038601. per fire and electrical inspector comment for adding 4 smoke detectors and 2 control modules to supervise magnetic door holders on 301 brannan side of communicating bridge on floors 2 and 3. n/a for maher. ref app#201701137153 (ab-010)Details
revision to fire alarm permit 201702038601. per fire and electrical inspector comment for adding 4 smoke detectors and 2 control modules to supervise magnetic door holders on 301 brannan side of communicating bridge on floors 2 and 3. n/a for maher. ref app#201701137153 (ab-010) | $3,100 |
| Feb 3, 2017 | Completed final sign-off Mar 2017 | 301 Brannan St | Pacific Auxiliary Fire Alarm | floor 2 & 3 - (1) new horn strobe and 2 new smoke det w/2 new control modules have been added to re-establish 2 communicating opening between adjacent bldg (301 brannan & 634 2nd st). ref pa 2017-0113-7153 - see ab-010. fire alarm permit for 634 second to be filed separately.Details
floor 2 & 3 - (1) new horn strobe and 2 new smoke det w/2 new control modules have been added to re-establish 2 communicating opening between adjacent bldg (301 brannan & 634 2nd st). ref pa 2017-0113-7153 - see ab-010. fire alarm permit for 634 second to be filed separately. | $6,992 |
| Nov 2, 2016 | Completed final sign-off Sep 2017 | 301 Brannan St | 1/f, 2/f, 6/f- remove and replace water source heat pumps with new like for like units. n/a ordinance #155-13Details
1/f, 2/f, 6/f- remove and replace water source heat pumps with new like for like units. n/a ordinance #155-13 | $190,000 | |
| May 25, 2016 | Never finaled issued May 2016, no final | 301 Brannan St | Pacific Auxiliary Fire Alarm | 5th floor: fire alarm, add(6) new horn/strobes & (9) mew strobes & replace (11) existing horn/strobes & (3) existing strobes. ref bldg. #2016-0325-3107.Details
5th floor: fire alarm, add(6) new horn/strobes & (9) mew strobes & replace (11) existing horn/strobes & (3) existing strobes. ref bldg. #2016-0325-3107. | $12,000 |
| Apr 7, 2016 | Never finaled issued Apr 2016, no final | 301 Brannan St | Novo Construction Inc | electrical work for ti, ref pa 2016-0325-3107Details
electrical work for ti, ref pa 2016-0325-3107 | $67,000 |
| Mar 25, 2016 | Never finaled issued Apr 2016, no final | 301 Brannan St | Novo Construction Inc | demo (e) field built desking system including pole supported lighting fixtures & replace w/new modular furniture system & new lighting (led) provided as a deffered subbmittal, work also includes minor in-fill of interior openings. maher naDetails
demo (e) field built desking system including pole supported lighting fixtures & replace w/new modular furniture system & new lighting (led) provided as a deffered subbmittal, work also includes minor in-fill of interior openings. maher na | $265,000 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 301 Brannan St | street space; setup.Details
street space; setup. | ||
| Sep 21, 2015 | Expired or cancelled cancelled Feb 2017 | 301 Brannan St | t-mobile proposes to install a new wireless site. the scope of works will include: install 9 new antennas, 3 new rrus, 1 mucrowave antenna. extend existing mechanical wall vertically.Details
t-mobile proposes to install a new wireless site. the scope of works will include: install 9 new antennas, 3 new rrus, 1 mucrowave antenna. extend existing mechanical wall vertically. | $20,000 | |
| Jul 16, 2014 | Completed final sign-off Nov 2014 | 301 Brannan St | Pacific Auxiliary Fire Alarm | add 2 power supplies, 2 control modules, 2 relays and 1 module transponder to the extg fire alarm system. there is no bldg permit associated with this work. n/a for the maher ordinance #155-13Details
add 2 power supplies, 2 control modules, 2 relays and 1 module transponder to the extg fire alarm system. there is no bldg permit associated with this work. n/a for the maher ordinance #155-13 | $9,000 |
| Jul 1, 2013 | Completed final sign-off Aug 2013 | 301 Brannan St | R.M.R. Construction Company | new 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. no other work.Details
new 1-hr rated partitoins to close off convenience stair between 5th & 6th floor. no other work. | $11,700 |
| May 2, 2013 | Completed final sign-off Sep 2013 | 301 Brannan St | True North Signs & Graphic Services | basement/1st/2nd/3rd/4th/5th/6th floors-install evacuation plaques (21 signs)Details
basement/1st/2nd/3rd/4th/5th/6th floors-install evacuation plaques (21 signs) | $9,400 |
| Aug 6, 2012 | Completed final sign-off Jan 2013 | 301 Brannan St | Pacific Auxiliary Fire Alarm | add 1 smoke detector, 1 relay, 1 control module, 15 horn strobes and 1 strobe. replace 1 existing power supply, 1 horn/strobe, 2 strobes on the 2nd flDetails
add 1 smoke detector, 1 relay, 1 control module, 15 horn strobes and 1 strobe. replace 1 existing power supply, 1 horn/strobe, 2 strobes on the 2nd fl | $13,500 |
| Jul 26, 2012 | Never finaled issued Jul 2012, no final | 301 Brannan St | street space & mtaDetails
street space & mta | ||
| Jul 10, 2012 | Completed final sign-off Feb 2013 | 301 Brannan St | tenant improvements, new drywall, doors, millwork, hvac, lighting & plumbing.Details
tenant improvements, new drywall, doors, millwork, hvac, lighting & plumbing. | $525,000 | |
| May 24, 2012 | Completed final sign-off Aug 2012 | 301 Brannan St | Anderson, Rowe & Buckley, Inc. | 2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers, 6 added sprinklers, 1 removed sprinklers.Details
2nd floor existing fire sprinkler system tenant improvements - 19 relocated sprinklers, 6 added sprinklers, 1 removed sprinklers. | $13,000 |
| Jun 30, 2011 | Expired or cancelled cancelled Mar 2020 | 301 Brannan St | install metal covered parking. structure over van accessible parking stall in private alley behind bldg.Details
install metal covered parking. structure over van accessible parking stall in private alley behind bldg. | $5,000 | |
| Apr 7, 2011 | Expired or cancelled withdrawn May 2011 | 301 Brannan St | Tom's Awning | install covered awning over van accessible parking spot.Details
install covered awning over van accessible parking spot. | $3,000 |
| Jan 6, 2011 | Never finaled issued Jan 2011, no final | 301 Brannan St | Turner Construction Co | revision to pa# 2010.09.15.0892. the power and data plan was mistakenly left out of the original permit. this is to correct that mistakeDetails
revision to pa# 2010.09.15.0892. the power and data plan was mistakenly left out of the original permit. this is to correct that mistake | |
| Dec 20, 2010 | Completed final sign-off Mar 2011 | 301 Brannan St | Pacific Auxiliary Fire Alarm | fire alarm addition of smoke detector, 7 duct detector, 12 h/s and 1 horn due to tenant improvement on the 1st floor. remove 1 pull stationDetails
fire alarm addition of smoke detector, 7 duct detector, 12 h/s and 1 horn due to tenant improvement on the 1st floor. remove 1 pull station | $16,257 |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 301 Brannan St | Turner Construction Co | 1st floor - electrical work, reference pa #201009150892.Details
1st floor - electrical work, reference pa #201009150892. | $197,963 |
| Dec 9, 2010 | Never finaled issued Dec 2010, no final | 301 Brannan St | R L H Fire Protection Inc | add 28 new sprinkler heads on 1st floor of an extg bldg. relocate 9 sprinkler heads and delete 3 heads.Details
add 28 new sprinkler heads on 1st floor of an extg bldg. relocate 9 sprinkler heads and delete 3 heads. | $18,500 |
| Dec 3, 2010 | Completed final sign-off Feb 2011 | 301 Brannan St | Western Allied Mechanical Inc. | 1st floor ti work. relocate 4 heat pumps and install 1 new server room, ac unit, arch pa #201009150892.Details
1st floor ti work. relocate 4 heat pumps and install 1 new server room, ac unit, arch pa #201009150892. | $50,000 |
| Sep 15, 2010 | Expired or cancelled expired Nov 2014 | 301 Brannan St | Turner Construction Co | 1st floor interior remodel, remove (e) partitions, replace with new partitions, new flooring.Details
1st floor interior remodel, remove (e) partitions, replace with new partitions, new flooring. | $710,000 |
| Apr 16, 2009 | Completed final sign-off Jun 2009 | 301 Brannan St | Capitol Electric Const | relcoate 3 (e) down-light from elevator lobby, install 2 exterior downlight and 2 wall sconce at main entrance, furnish & install wall washers, fixtures for elevator and entry lobbies.Details
relcoate 3 (e) down-light from elevator lobby, install 2 exterior downlight and 2 wall sconce at main entrance, furnish & install wall washers, fixtures for elevator and entry lobbies. | $3,000 |
| Feb 4, 2009 | Completed final sign-off Jun 2009 | 301 Brannan St | Bcci Construction Company | lobby renovation - modify front doors. change flooring. add lighting fixtures. (n) canopy over (e) van accessible parking space.Details
lobby renovation - modify front doors. change flooring. add lighting fixtures. (n) canopy over (e) van accessible parking space. | $200,000 |
| Sep 23, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Anderson, Rowe & Buckley, Inc. | 4th floor-tenant improvements to the (e) wet & pre-action fire sprinkler systems-73 relocates (loweved), 1 newDetails
4th floor-tenant improvements to the (e) wet & pre-action fire sprinkler systems-73 relocates (loweved), 1 new | $4,000 |
| Sep 23, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Gci, Inc | refer t.i. pa# 2008/08/08/8720. electrical lighting & power systems for ti to add & relocate fixtures, outlets, and tenant equipment.Details
refer t.i. pa# 2008/08/08/8720. electrical lighting & power systems for ti to add & relocate fixtures, outlets, and tenant equipment. | $26,000 |
| Sep 17, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Western Allied Mechanical Inc. | replace existing (4) mechanical split system. a/c units with (3) new a/c units for server room.Details
replace existing (4) mechanical split system. a/c units with (3) new a/c units for server room. | $80,000 |
| Sep 16, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Pacific Auxiliary Fire Alarm | 4th floor-upgrade of fire alarm system on the 4th floor. installing 10 duct detectors, 6 smoke detectors, 13 horn/strobes and 5 strobes.Details
4th floor-upgrade of fire alarm system on the 4th floor. installing 10 duct detectors, 6 smoke detectors, 13 horn/strobes and 5 strobes. | $33,000 |
| Sep 16, 2008 | Completed final sign-off Jun 2009 | 301 Brannan St | Pacific Auxiliary Fire Alarm | replacement of fire alarm system phase 1 of approved corrective action plan to bring building core areas to current code.Details
replacement of fire alarm system phase 1 of approved corrective action plan to bring building core areas to current code. | $220,000 |
| Aug 26, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Gci, Inc | remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access.Details
remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access. | $12,000 |
| Aug 8, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Gci, Inc | 4th floor-full floor t.i. construct new doors, walls and partitions. demo done under previous permit. mechanical, electrical, sprinklers and life safety to be done under seperate permitsDetails
4th floor-full floor t.i. construct new doors, walls and partitions. demo done under previous permit. mechanical, electrical, sprinklers and life safety to be done under seperate permits | $300,000 |
| Aug 1, 2008 | Completed final sign-off Sep 2008 | 301 Brannan St | Gci, Inc | 4th floor - soft demo to remove non load bearing walls and partitions for upcoming ti permit.Details
4th floor - soft demo to remove non load bearing walls and partitions for upcoming ti permit. | $46,000 |
| May 15, 2002 | Expired or cancelled expired Apr 2005 | 301 Brannan St | Plant Construction | add partial doors to 6th floor reception areaDetails
add partial doors to 6th floor reception area | $35,000 |
| Mar 30, 2000 | Completed final sign-off May 2001 | 301 Brannan St | Plant Construction | add concrete pad on roof for future generatorDetails
add concrete pad on roof for future generator | $10,000 |
| Feb 17, 2000 | Expired or cancelled expired Apr 2005 | 301 Brannan St | Plant Construction | renewal of application 9722930Details
renewal of application 9722930 | |
| Feb 11, 2000 | Expired or cancelled expired Jun 2000 | 301 Brannan St | Plant Construction Co, Lp | renew: 9718583, 9720389, 9723706, 9722282 for final onlyDetails
renew: 9718583, 9720389, 9723706, 9722282 for final only | |
| Feb 11, 2000 | Expired or cancelled expired Jun 2000 | 301 Brannan St | Plant Construction Co, Lp | renew:9716221, 9723603,09710806, 9722277Details
renew:9716221, 9723603,09710806, 9722277 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific Auxiliary Fire Alarm (17), Rylko Builders Inc. (10), Principal Builders Inc. (7), Gci, Inc (5), Golden Gate Fire Protection Inc (5), Acco Engineered Systems Inc. Dba Acco En (3), Novo Construction Inc (3), Plant Construction (3), Turner Construction Co (3), Anderson, Rowe & Buckley, Inc. (2), Plant Construction Co, Lp (2), Pribuss Engineering Inc (2), Western Allied Mechanical Inc. (2), Bcci Construction Company, Capitol Electric Const, Phoenix Electric Co., R L H Fire Protection Inc, R.M.R. Construction Company, Tom's Awning, True North Signs & Graphic Services
- Architects
- Gary Martinez (3), Teresa Emery (3), Michael Stanton (2), Brian Collins-Friedrichs, Michael Garcia, Seth Boor, Steven Tipping
- Engineers
- Sherry Chaumpluke (7), Juan F. Oroso (4), Teresa Emery (2), Alexander Joseph Pacheco, Brett Mccomb, Dennis Cheung, Elisabeth Allen, Jacky Ng, James Mogannam, James Mogannam, John C Sprinkle, Julian White, Raafat Shehata, Robert Monaghan, Stephen Shaffer
- Authorized agent-otherss
- John Hribar, Otj Architechs
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.