Jason Brabo
- Listed as
- architect, designer
- Firm
- Tlcd Architecture
- Based in
- Santa Rosa
- On San Francisco permits
- Jan 2012 to May 2026
8 permits since 2000 (architect on 7 permits, designer on 1 permit): 5 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2026 | In progress filed May 2026, not yet issued | 2190 Ofarrell St | Kaiser Foundation Health Plan Inc | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,623,126 |
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 2241 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting.Details
modernization of 2 existing traction elevators, including new machinery and controllers, to comply with current codes, to serve the parking garage. new ventilation for (e) elevator machine room - new split system. new pit and elevator machine room lighting. | $2,356,955 |
| May 1, 2025 | In progress issued Jul 2025 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room.Details
modernization of 3 existing traction elevators and 1 existing freight elevator, including new machinery and controllers to comply with current codes. refresh of interior finishes for 3 traction elevator cars. new ventilation for existing elevator machine room. | $1,800,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2025 | 2238 Geary Bl | The Whiting-Turner Contracting Company | revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets toDetails
revision to pa#2021-0312-6502 and 2021-0830-7389. required redesign of ventilation requirement fr level b-5 elevator machine rm based on a revision of heat loads from elevator manufacturer (fc-1 and cu-1). add'l constructability comments from gc related to bedesign. added access control sheets to | $45,000 |
| Mar 12, 2021 | Completed final sign-off Jul 2025 | 2238 Geary Bl | The Whiting-Turner Contracting Company | modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019.Details
modernization of 2 existing hydraulic elevators and 6 traction elevators new air handling units to service elevator machine room and sprinklers to be removed top of hoistways to comply with cbc 2019. | $300,000 |
| Mar 22, 2017 | Completed final sign-off Jul 2019 | 4141 Geary Bl | Kaiser Foundation Health Plan Inc | modernization of elevator controls and machinery partially per plan.Details
modernization of elevator controls and machinery partially per plan. | $200,000 |
| Jun 13, 2012 | Completed final sign-off Dec 2013 | 2350 Geary Bl | Kaiser Foundation Health Plan Inc | bldg maintenance includes: coating of (e) bldg ext, patch & repair of selectively demolished portions of ext. bldg shell, patch & repair (e) exterior surfaces, replace (e) exterior lighting, remvoal of (e) fire escapes & mechancial unit, replace (e) wood flooring & repair concrete floor slab rm #122Details
bldg maintenance includes: coating of (e) bldg ext, patch & repair of selectively demolished portions of ext. bldg shell, patch & repair (e) exterior surfaces, replace (e) exterior lighting, remvoal of (e) fire escapes & mechancial unit, replace (e) wood flooring & repair concrete floor slab rm #122 | $180,000 |
| Jan 30, 2012 | Completed final sign-off Dec 2013 | 4131 Geary Bl | upper, lower, basement & first floor. replacing existing garage exhaust equipment with (n) equipment, (n) ductwork, & (n) controls to achieve code required ventilation air quantities. a new lowered enclosure will be constructed to enclose the exhaust plenum.Details
upper, lower, basement & first floor. replacing existing garage exhaust equipment with (n) equipment, (n) ductwork, & (n) controls to achieve code required ventilation air quantities. a new lowered enclosure will be constructed to enclose the exhaust plenum. | $150,000 |