Stacey Lin
- Listed as
- engineer
- On San Francisco permits
- Jan 2024 to Aug 2024
3 permits since 2000 (engineer on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2024 | In progress issued Nov 2024 | 150 Spear St | Gci, Inc | 5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation roomDetails
5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation room | |
| Mar 19, 2024 | In progress filed Mar 2024, not yet issued | 278 Post St | Rudolph Commercial Interiors Inc, Rci | replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generatorDetails
replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator | $190,000 |
| Jan 31, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | 5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbingDetails
5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing | $800,000 |