Stacey Lin
- License
- M38938
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M38938 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jan 2024 to Aug 2024
3 permits since 2000 (engineer on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (2), Rudolph Commercial Interiors Inc, Rci
- Architects
- Brian Koshley, Matthew Brady
- Engineers
- Jesse Avery (3), James Mogannam, Nicholas Reid
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2024 | In progress issued Nov 2024 | 150 Spear St | Gci, Inc | 5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation roomDetails
5/f suite 500: revision to permit 202401184175 to add consult room, office and storage, electrical, added wireless access points, security cameras and adjustments of ceilings with new offices and storage. 10/3/24: change of scope due to (e) conditions the staff restroom, lockers, and lacation room | |
| Mar 19, 2024 | In progress filed Mar 2024, not yet issued | 278 Post St | Rudolph Commercial Interiors Inc, Rci | replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generatorDetails
replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator | $190,000 |
| Jan 31, 2024 | In progress issued Mar 2024 | 150 Spear St | Gci, Inc | 5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbingDetails
5th fl, suite #500 (phase 2)- demo exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing | $800,000 |