Permit GraphShortlistSan Francisco building permits since 2000

Joyce Merrell Fuss

License
S3125
Look the license up with the state
Listed as
engineer
Firm
Lionakis
Based in
Sacramento
On San Francisco permits
Oct 2025 to Oct 2025

1 permit since 2000 (engineer on 1 permit): 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 7, 2025In progress
filed Oct 2025, not yet issued
4131 Geary BlW. Bradley Electricfire alarm system migration at the kaiser (cn31-24) central plant as part of a campus wide fire alarm upgrade; migrating to new equipment - provide minimal conduits where needed by fire alarm, provide (1) power outlet with new circuit. re-use (e) electrical circuit. structural details to cover
Details
Permit
202509094885
Status
approved
Filed
Oct 7, 2025
Declared cost
$70,000
Address
4131 Geary Bl

fire alarm system migration at the kaiser (cn31-24) central plant as part of a campus wide fire alarm upgrade; migrating to new equipment - provide minimal conduits where needed by fire alarm, provide (1) power outlet with new circuit. re-use (e) electrical circuit. structural details to cover

Open the permit page

$70,000