Block 3744, lot 006
75 Folsom St
- City’s use
- Single Family Residential
- Built
- 1991
- Stories
- 1
- Units
- 1
- Rooms
- 1 bedroom, 1 bathroom
- Building
- 1,019 sq ft
- Zoning
- M1
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 75 Folsom St | Sabah International Incorporated | ste# 1430: provide a modification of (e) fire alarm system, new 3 ceiling speakers, remove and replace 1 wall mount speaker weatherproofDetails
ste# 1430: provide a modification of (e) fire alarm system, new 3 ceiling speakers, remove and replace 1 wall mount speaker weatherproof | $13,410 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage.Details
living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage. | $15,227 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | 8th and 9th floor common areas. repairs to drywall and insulation due to water leark. common hallways to buildign. like for like. repair in kind.Details
8th and 9th floor common areas. repairs to drywall and insulation due to water leark. common hallways to buildign. like for like. repair in kind. | $19,507 |
| Sep 22, 2017 | Completed final sign-off Sep 2017 | 75 Folsom St | Acco Engineered Systems Inc. Dba Acco En | revision to 201705096033. reuse (e) structural anchoreage per engineered calculations. maher not reqDetails
revision to 201705096033. reuse (e) structural anchoreage per engineered calculations. maher not req | |
| May 9, 2017 | Completed final sign-off Sep 2017 | 75 Folsom St | Acco Engineered Systems Inc. Dba Acco En | water source heat pump replacement, like for likeDetails
water source heat pump replacement, like for like | $70,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 75 Folsom St | Western Roofing Service | replace existing deck waterproofing membrane with new waterproofing. area is for residential only.Details
replace existing deck waterproofing membrane with new waterproofing. area is for residential only. | $160,000 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 75 Folsom St | street spaceDetails
street space | ||
| Jul 11, 2014 | Never finaled issued Jul 2014, no final | 75 Folsom St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Jan 8, 2013 | Never finaled issued Jan 2013, no final | 75 Folsom St | Eagle Bay Enterprises, Inc (Dba Garnett | install evacuation signs floor b2, 1,8-19Details
install evacuation signs floor b2, 1,8-19 | $500 |
| Aug 2, 2012 | Never finaled issued Aug 2012, no final | 75 Folsom St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Dec 16, 2008 | Completed final sign-off Mar 2011 | 75 Folsom St | Capitol Electric Const | fire alarm system upgrade. install 3 addt'l nodes (fcc room already complete) out of 4. new smoke control panel and new devices on floors: b-2,b-1, ground, 5,6,7,8 and 8 thru 18. also connect common garage devices (33 sprinkler/strobes) @ 2 harrison street.Details
fire alarm system upgrade. install 3 addt'l nodes (fcc room already complete) out of 4. new smoke control panel and new devices on floors: b-2,b-1, ground, 5,6,7,8 and 8 thru 18. also connect common garage devices (33 sprinkler/strobes) @ 2 harrison street. | $1,105,600 |
| Aug 4, 2008 | Never finaled issued Aug 2008, no final | 75 Folsom St | street space permit only.Details
street space permit only. | ||
| Aug 23, 2004 | Never finaled issued Aug 2004, no final | 75 Folsom St | street spaceDetails
street space | ||
| Jun 24, 2004 | Never finaled issued Jun 2004, no final | 75 Folsom St | street spaceDetails
street space | ||
| Feb 1, 2002 | Never finaled issued Feb 2002, no final | 75 Folsom St | Davey Roofing Inc | all 19 units:remove e concrete at balcony deck, installation, concrete paver over pedestal system,sDetails
all 19 units:remove e concrete at balcony deck, installation, concrete paver over pedestal system,s | $501,084 |
| Dec 31, 2001 | Expired or cancelled expired Oct 2003 | 75 Folsom St | Plath & Company Inc | partial remove & replace existing finishes at the kitchen including cabinets, counters, applicance &Details
partial remove & replace existing finishes at the kitchen including cabinets, counters, applicance & | $50,000 |
| Oct 3, 2001 | Completed final sign-off Jul 2003 | 75 Folsom St | Bauman Landscape, Inc. | install: erip irrigation sys., landscape planting in light weight planters, fountain ele. connectionDetails
install: erip irrigation sys., landscape planting in light weight planters, fountain ele. connection | $270,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Acco Engineered Systems Inc. Dba Acco En (2), Richard Avelar &Assoc Reconstr/Dba Recon (2), Bauman Landscape, Inc., Capitol Electric Const, Davey Roofing Inc, Eagle Bay Enterprises, Inc (Dba Garnett, Plath & Company Inc, Sabah International Incorporated, Western Roofing Service
- Engineers
- Tom Sammons
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.