Lawrence K. Asaro
- License
- C30022
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Smma
- On San Francisco permits
- Aug 2015 to Aug 2015
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dpr Construction, Gci, Inc
- Engineers
- Amit Wadhwa
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2015 | Completed final sign-off Dec 2015 | 455 Market St | Dpr Construction | 4th floor suite 400 - new construction to include interior office renovation of non-structural interior partitions, doors, ceilings, & finishes. mep, life safety & sprinklers as deferred submittal. n/a maher ord. 155-13Details
4th floor suite 400 - new construction to include interior office renovation of non-structural interior partitions, doors, ceilings, & finishes. mep, life safety & sprinklers as deferred submittal. n/a maher ord. 155-13 | $1,620,720 |
| Aug 11, 2015 | Completed final sign-off Apr 2016 | 255 California St | Gci, Inc | tenant improvement to include non load bearing partitions, ceilings, finishes. modifications to existing mep systyem to accomodate new layout.maher not reqDetails
tenant improvement to include non load bearing partitions, ceilings, finishes. modifications to existing mep systyem to accomodate new layout.maher not req | $250,000 |