Back to kitchen remodel contractors
Plant Construction Company Lp
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to May 2015
- Last 24 months
- 0 permits filed
479 permits since 2000: 391 completed, 44 never finaled, 44 expired or cancelled.
Of the 44 never-finaled permits, 44 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 98 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2011 | Completed final sign-off Feb 2012 | 101 Post St | change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b).Details
change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior atrium at 2nd & 3rd floor. change in use at basement ground and mezzanine (m to b). | $3,500,000 |
| Dec 21, 2010 | Completed final sign-off Aug 2011 | 626 Polk St | demolish (e) basement walls and construct new family area incl. new kitchen, laundry ,dining, ada restroom. replace (e) exit stairs from basement w/ new code compliant. construct offices on level 1. update (e) elevator. life safety and sprinkler system under separate permitDetails
demolish (e) basement walls and construct new family area incl. new kitchen, laundry ,dining, ada restroom. replace (e) exit stairs from basement w/ new code compliant. construct offices on level 1. update (e) elevator. life safety and sprinkler system under separate permit | $500,000 |
| Nov 10, 2010 | Completed final sign-off Dec 2012 | 699 08th St | ti upgrade in existing vacant tenant areas-new metal framed partitions,glazing,doors/hardware,painting,floor covering,acustic ceiling etc.new elec,plumb,hvac&lite. no exterior modifications,no increase in office space.demo under 201009030203. life safety,fire sprinklers&kitchen sep permits.Details
ti upgrade in existing vacant tenant areas-new metal framed partitions,glazing,doors/hardware,painting,floor covering,acustic ceiling etc.new elec,plumb,hvac&lite. no exterior modifications,no increase in office space.demo under 201009030203. life safety,fire sprinklers&kitchen sep permits. | $11,000,000 |
| Dec 31, 2009 | Completed final sign-off Dec 2010 | 300 Beale St | unit 609 on 5th and 6th floors. remodel kitchen and bathrooms incl. casework, plumbing fixtures, cladding stairs, repalce (e) wood fireplace with gas, new fllorings & lightings. fire sprinklers under separate permit.Details
unit 609 on 5th and 6th floors. remodel kitchen and bathrooms incl. casework, plumbing fixtures, cladding stairs, repalce (e) wood fireplace with gas, new fllorings & lightings. fire sprinklers under separate permit. | $300,000 |
| May 18, 2007 | Never finaled issued Jul 2007, no final | 1310 Junipero Serra Bl | voluntary seismic upgrade, ada parking, ada access at main front entry, ada unisex restroom, new kitchen flooring, repairs to existing doors and windows. not compliance with sec 3403.6, sfbc'2001.Details
voluntary seismic upgrade, ada parking, ada access at main front entry, ada unisex restroom, new kitchen flooring, repairs to existing doors and windows. not compliance with sec 3403.6, sfbc'2001. | $1,200,000 |
| Apr 26, 2006 | Completed final sign-off Mar 2007 | 53 03rd St | tenant improvement of an (e) 6,300 sq. ft. multi restaurant space on street level with an (e) 9 stories parking structure above to convert to california pizza kitchen restaurant. change in use - from s3/b/m to a-3/s3/m occ load calc ver.Details
tenant improvement of an (e) 6,300 sq. ft. multi restaurant space on street level with an (e) 9 stories parking structure above to convert to california pizza kitchen restaurant. change in use - from s3/b/m to a-3/s3/m occ load calc ver. | $1,400,000 |
| Apr 6, 2006 | Completed final sign-off Jul 2006 | 2310 Hyde St | kitchen renovation to include new countertops, appliances, cabinetry, paint, flooring, light fixtures & switches, sink & faucet, and power receptacles. (work to be performed at 2310 hyde st. #3)Details
kitchen renovation to include new countertops, appliances, cabinetry, paint, flooring, light fixtures & switches, sink & faucet, and power receptacles. (work to be performed at 2310 hyde st. #3) | $80,000 |