Block 3707, lot 058
53 03rd St
- City’s use
- Commercial Misc
- Built
- 1970
- Stories
- 9
- Units
- 1
- Rooms
- 2 bathrooms
- Lot
- 33,118 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 8, 2023 | Never finaled issued Feb 2023, no final | 53 03rd St | Clive F Reid | installation of a co2 monitoring system.Details
installation of a co2 monitoring system. | $4,500 |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 33 03rd St | street spaceDetails
street space | ||
| Apr 21, 2017 | Never finaled issued May 2017, no final | 33 03rd St | Cahill Contractors Llc. | basement to 8/f- voluntary strengthening upgrade to correct short colulmn conditions at specific locations around the vehicle ramp, entrance and exit to garage. n/a ordinance #155-13Details
basement to 8/f- voluntary strengthening upgrade to correct short colulmn conditions at specific locations around the vehicle ramp, entrance and exit to garage. n/a ordinance #155-13 | $700,000 |
| Oct 7, 2014 | Never finaled issued Oct 2014, no final | 33 03rd St | sidewalk repair - street space under permit #m504207Details
sidewalk repair - street space under permit #m504207 | ||
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 33 03rd St | street spaceDetails
street space | ||
| Dec 18, 2013 | Completed final sign-off Nov 2014 | 33 03rd St | Cahill Const Service Inc | voluntary structural upgrade @ 3rd street facade, addition of steel brace frames, planters & street trees. all work is exterior. compliance w/ ord no #155-13 not required. excavation <50 cu yd.Details
voluntary structural upgrade @ 3rd street facade, addition of steel brace frames, planters & street trees. all work is exterior. compliance w/ ord no #155-13 not required. excavation <50 cu yd. | $430,000 |
| Nov 20, 2012 | Never finaled issued Nov 2012, no final | 51 03rd St | Tri-Signal Integration Inc. | new elevator recall control & supervisory system including. one elevator recall control & supervisory control unit. one remote annunciator; twelve smoke detectors; three relay modules.Details
new elevator recall control & supervisory system including. one elevator recall control & supervisory control unit. one remote annunciator; twelve smoke detectors; three relay modules. | $8,500 |
| Oct 26, 2012 | Completed final sign-off Mar 2013 | 51 03rd St | Potter Fire Protection | 1st floor - relocate & change (3) upright fire sprinklers to sidewall in an existing elevator pit.Details
1st floor - relocate & change (3) upright fire sprinklers to sidewall in an existing elevator pit. | $1,120 |
| Jul 12, 2011 | Completed final sign-off Feb 2013 | 33 03rd St | Cahill Contractors Inc | repair corroded post tensioning cables and strengthen a portion of concrete slab with carbon fiber reinforced polymers.Details
repair corroded post tensioning cables and strengthen a portion of concrete slab with carbon fiber reinforced polymers. | $10,000 |
| Apr 20, 2009 | Completed final sign-off Apr 2009 | 53 03rd St | California Sign Installation | to obtain final inspection for work approved under pa#2006/10/13/5003. all work completed.Details
to obtain final inspection for work approved under pa#2006/10/13/5003. all work completed. | |
| Apr 20, 2009 | Completed final sign-off Apr 2009 | 53 03rd St | California Sign Installation | renew pa# 2006/10/16/5117 to obtain final inspection. all work has been completed.Details
renew pa# 2006/10/16/5117 to obtain final inspection. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off May 2009 | 53 03rd St | California Sign Installation | renew pa# 2006/10/13/4998 to obtain final inspection. all work has been completed.Details
renew pa# 2006/10/13/4998 to obtain final inspection. all work has been completed. | |
| Apr 16, 2007 | Never finaled issued Apr 2007, no final | 53 03rd St | street spaceDetails
street space | ||
| Feb 23, 2007 | Completed final sign-off Mar 2007 | 53 03rd St | Anderson, Rowe & Buckley, Inc. | as-built- fire spkr system. revision #3 - 1 add, and 1 head replaced. old apn 200610122006 (1101202).Details
as-built- fire spkr system. revision #3 - 1 add, and 1 head replaced. old apn 200610122006 (1101202). | |
| Feb 15, 2007 | Never finaled issued Feb 2007, no final | 51 03rd St | Securitas Technology Corporation | add one ansul hood & water flow tamper to (e) fire alarm system. ansul connection to the first floor at the (n) california pizza ktichen. the new water flow and tamper are on the basement level. panel & (e) water flows are on the basement level.Details
add one ansul hood & water flow tamper to (e) fire alarm system. ansul connection to the first floor at the (n) california pizza ktichen. the new water flow and tamper are on the basement level. panel & (e) water flows are on the basement level. | $3,000 |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 53 03rd St | Plant Construction Company Lp | revision to pa# 200604269969, relocate exit signs. re-designate corridor to hallway (as-built).Details
revision to pa# 200604269969, relocate exit signs. re-designate corridor to hallway (as-built). | |
| Feb 6, 2007 | Never finaled issued Feb 2007, no final | 53 03rd St | Certified Fire & Safety Co | hook up ansul r102 fire ssuppression system (hood & duct)Details
hook up ansul r102 fire ssuppression system (hood & duct) | $4,000 |
| Nov 2, 2006 | Expired or cancelled expired Mar 2009 | 53 03rd St | Potter Fire Protection | install a 4" fire sprinkler supply to a new tenant on the garage level (includes values and drain).Details
install a 4" fire sprinkler supply to a new tenant on the garage level (includes values and drain). | $2,800 |
| Oct 16, 2006 | Completed final sign-off Mar 2007 | 53 03rd St | California Sign Installation | installa 5 awnings 8'x15'Details
installa 5 awnings 8'x15' | $2,500 |
| Oct 13, 2006 | Expired or cancelled expired Mar 2009 | 53 03rd St | California Sign Installation | erect double faced, electric, projecting signDetails
erect double faced, electric, projecting sign | $5,000 |
| Oct 13, 2006 | Expired or cancelled expired Apr 2009 | 53 03rd St | California Sign Installation | erect single faced wall signDetails
erect single faced wall sign | $10,000 |
| Oct 12, 2006 | Completed final sign-off Mar 2007 | 53 03rd St | Anderson, Rowe & Buckley, Inc. | expansion of extg fire sprinkler system 84 new spinklrsDetails
expansion of extg fire sprinkler system 84 new spinklrs | $16,800 |
| Aug 9, 2006 | Completed final sign-off Mar 2007 | 53 03rd St | Plant Construction Company Lp | coring in concrete floor slab, storefront glazing demolitionDetails
coring in concrete floor slab, storefront glazing demolition | $6,000 |
| Jun 7, 2006 | Completed final sign-off Dec 2006 | 53 03rd St | Angotti & Reilly Inc. | remove suspended aloustic tile ceiling, non load bearing walls, counters, wall finishes, ductwork and flooring. remove sinks and refrigerators. soft demo only. space to remain vacant until disability features requirement addressed under future applciation per admin. bulletin ab-017.Details
remove suspended aloustic tile ceiling, non load bearing walls, counters, wall finishes, ductwork and flooring. remove sinks and refrigerators. soft demo only. space to remain vacant until disability features requirement addressed under future applciation per admin. bulletin ab-017. | $20,000 |
| Apr 26, 2006 | Completed final sign-off Mar 2007 | 53 03rd St | Plant Construction Company Lp | tenant improvement of an (e) 6,300 sq. ft. multi restaurant space on street level with an (e) 9 stories parking structure above to convert to california pizza kitchen restaurant. change in use - from s3/b/m to a-3/s3/m occ load calc ver.Details
tenant improvement of an (e) 6,300 sq. ft. multi restaurant space on street level with an (e) 9 stories parking structure above to convert to california pizza kitchen restaurant. change in use - from s3/b/m to a-3/s3/m occ load calc ver. | $1,400,000 |
| Apr 28, 2005 | Completed final sign-off Sep 2005 | 43 03rd St | revision:200501123128 more soft demoDetails
revision:200501123128 more soft demo | ||
| Jan 12, 2005 | Completed final sign-off Sep 2005 | 43 03rd St | barrier removal @ 2 (e)restrooms,new fixtures,toilet,partitions,tile & light switches to beDetails
barrier removal @ 2 (e)restrooms,new fixtures,toilet,partitions,tile & light switches to be | $150,000 | |
| Feb 19, 2004 | Expired or cancelled expired Jan 2005 | 53 03rd St | Alpha Fire Suppression | as builts for fire sprinkler work performed per app #200311210896Details
as builts for fire sprinkler work performed per app #200311210896 | |
| Dec 2, 2003 | Completed final sign-off Jan 2004 | 43 03rd St | Allied Fire Protection | modify exist.fire sprinkler system to accomodate, new wall & ceiling layoutDetails
modify exist.fire sprinkler system to accomodate, new wall & ceiling layout | $1,350 |
| Nov 21, 2003 | Never finaled issued Nov 2003, no final | 53 03rd St | renew appl#9910011 remaining workDetails
renew appl#9910011 remaining work | $25,000 | |
| May 29, 2003 | Completed final sign-off Jan 2004 | 43 03rd St | Cahill Contractors Inc | project includes the addition of a 205 sf reception area into an (e)hallway & the addition of anDetails
project includes the addition of a 205 sf reception area into an (e)hallway & the addition of an | $90,000 |
| Mar 10, 2003 | Completed final sign-off Mar 2003 | 51 03rd St | Honeywell International, Inc | install monitoring system for water flowDetails
install monitoring system for water flow | $5,000 |
| Feb 26, 2003 | Expired or cancelled cancelled Jun 2005 | 33 03rd St | Reeve-Knight Construction Inc. | accessible parking layout. adn access commission approval letter.Details
accessible parking layout. adn access commission approval letter. | |
| Feb 18, 2003 | Completed final sign-off Mar 2003 | 51 03rd St | Honeywell International, Inc | rev. appl#200212173663, for fire alarm system onlyDetails
rev. appl#200212173663, for fire alarm system only | |
| Feb 13, 2003 | Completed final sign-off Mar 2003 | 33 03rd St | Pribuss Engineering Inc | fire sprinkler installation, 66 sprinkler headsDetails
fire sprinkler installation, 66 sprinkler heads | $40,000 |
| Feb 6, 2003 | Completed final sign-off Jul 2003 | 51 03rd St | Arrow Sign Company | erect double faced electric wall projecting signDetails
erect double faced electric wall projecting sign | $18,998 |
| Dec 17, 2002 | Completed final sign-off Mar 2003 | 51 03rd St | Honeywell International, Inc | installation of a fire alarmDetails
installation of a fire alarm | $9,000 |
| Nov 8, 2002 | Completed final sign-off Mar 2003 | 33 03rd St | Reeve-Knight Construction Inc. | remodel existing retail space on the 1st fl. partitions,lighting, elect. 2 accessible restrooms & emDetails
remodel existing retail space on the 1st fl. partitions,lighting, elect. 2 accessible restrooms & em | $100,000 |
| Sep 25, 2002 | Never finaled issued Sep 2002, no final | 53 03rd St | California Roof Management | reroofingDetails
reroofing | $17,713 |
| Nov 15, 2001 | Expired or cancelled expired Mar 2002 | 51 03rd St | change use of retail space from halloween costumes to books at gr floorDetails
change use of retail space from halloween costumes to books at gr floor | ||
| Feb 26, 2001 | Expired or cancelled cancelled Nov 2001 | 51 03rd St | install type -ii hood, duct & blower, make-up air unit for convection oven,under (e)app#200101260687Details
install type -ii hood, duct & blower, make-up air unit for convection oven,under (e)app#200101260687 | $14,000 | |
| Jan 26, 2001 | Expired or cancelled expired Sep 2005 | 51 03rd St | t.i. to existing store no change in use cosmetic altrtn 37,500 costruct 20% hc for 7500 no up in watDetails
t.i. to existing store no change in use cosmetic altrtn 37,500 costruct 20% hc for 7500 no up in wat | $37,500 | |
| Jan 22, 2001 | Expired or cancelled expired Sep 2005 | 51 03rd St | soft demo to (e) cookie store on g/floorDetails
soft demo to (e) cookie store on g/floor | $7,500 | |
| Jun 13, 2000 | Completed final sign-off Sep 2000 | 51 03rd St | Young Electric Sign Co. | erect: single faced, electric wall signDetails
erect: single faced, electric wall sign | $12,500 |
Find contractors for work like this