Block 3705Z, lot 003
22 04th St
- City’s use
- Commercial Office
- Built
- 1981
- Stories
- 16
- Building
- 262,872 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2014 | Completed final sign-off Dec 2014 | 22 04th St | Plant Construction Co, Lp | cosmetic upgrades at terraces on the 14th,15th, & 16th floors roof deck. paint, plantings, entry/exit doors.new glazed door to roof deck. n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
cosmetic upgrades at terraces on the 14th,15th, & 16th floors roof deck. paint, plantings, entry/exit doors.new glazed door to roof deck. n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $45,000 |
| Apr 3, 2014 | Never finaled issued Apr 2015, no final | 22 04th St | Plant Construction Co, Lp | loading area landscape improvements.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
loading area landscape improvements.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $300,000 |
| Dec 27, 2013 | Expired or cancelled cancelled Jan 2020 | 22 04th St | work is limited to the installation of water risers, waste lines, water pump, water tank & (n) partitions to accomodate future restrooms @ levels 3-13.Details
work is limited to the installation of water risers, waste lines, water pump, water tank & (n) partitions to accomodate future restrooms @ levels 3-13. | $130,000 | |
| Dec 27, 2013 | Never finaled issued Apr 2014, no final | 22 04th St | Plant Construction Company Lp | renov of 2(e)roof decks @ 9&13/fls.no addl sq ft added.install(n)roof membrane 9&13/roof decks,modular deck paver/planter sys,req'd light/signage, irrigation sys & (n)ramp @ 9th level roof deck to provide accessible access.** maher: compliance with ordinance no# 155-13 not required **Details
renov of 2(e)roof decks @ 9&13/fls.no addl sq ft added.install(n)roof membrane 9&13/roof decks,modular deck paver/planter sys,req'd light/signage, irrigation sys & (n)ramp @ 9th level roof deck to provide accessible access.** maher: compliance with ordinance no# 155-13 not required ** | $375,000 |
| Oct 1, 2013 | Completed final sign-off Dec 2013 | 22 04th St | Dcs Plumbing Llc | demo nonbearing wall 12' x 6', patch drywall & relocate switch.Details
demo nonbearing wall 12' x 6', patch drywall & relocate switch. | $600 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 22 04th St | Ad Art Inc. | install 2 illuniated address signsDetails
install 2 illuniated address signs | $5,000 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 22 04th St | Ad Art Inc. | install 2 illuniated address signsDetails
install 2 illuniated address signs | $3,000 |
| Mar 20, 2013 | Completed final sign-off Mar 2013 | 22 04th St | Allied Fire Protection | 1st floor: fire sprinkler lobby renovation g/f. 11 relocated heads and one added head. t.i #2013-0130-9143Details
1st floor: fire sprinkler lobby renovation g/f. 11 relocated heads and one added head. t.i #2013-0130-9143 | $6,000 |
| Jan 30, 2013 | Never finaled issued Feb 2013, no final | 22 04th St | Plant Construction Company Lp | interior improvement to ground floor lobby, toilet - single occ, rear corridor including new finishes, lighting & coffee service area. electrical, plumbing & sprinkler under seprate builder's permit.Details
interior improvement to ground floor lobby, toilet - single occ, rear corridor including new finishes, lighting & coffee service area. electrical, plumbing & sprinkler under seprate builder's permit. | $1,510,000 |
| Dec 12, 2012 | Completed final sign-off Mar 2014 | 22 04th St | Otis Elevator Co | lobby, installation of destination based controls & fixts for the 4 elevators of the main passenger grap. this installation of fixts to be compliant to ab-090 in (e) lobbies. f/a recall under separate permit.Details
lobby, installation of destination based controls & fixts for the 4 elevators of the main passenger grap. this installation of fixts to be compliant to ab-090 in (e) lobbies. f/a recall under separate permit. | $143,872 |
| Jul 24, 2012 | Completed final sign-off Sep 2012 | 22 04th St | Ayoob & Peery Plumbing Co Inc | tenant improvement on 3rd & 5th floor, relocate 11 and demo 1 sprinklers.Details
tenant improvement on 3rd & 5th floor, relocate 11 and demo 1 sprinklers. | $5,874 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ad Art Inc. (2), Plant Construction Co, Lp (2), Plant Construction Company Lp (2), Allied Fire Protection, Ayoob & Peery Plumbing Co Inc, Dcs Plumbing Llc, Otis Elevator Co
- Architects
- Thomas Yee (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.